| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC | ₹19.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.9 L+₹58,727.07 (3.04%)Rejected-AOC KALIKULANGARA CHERUVAYOOR | CHERUVAYOOR | KOZHIKODE | KERALA | 673645 | ₹19.9 L+₹58,727.07 (3.04%) | L2 | Rejected-AOC L2 |
| 3 | L3₹20.5 L+₹1.1 L (5.91%)Rejected-AOC | ₹20.5 L+₹1.1 L (5.91%) | L3 | Rejected-AOC L3 |
| 4 | L4₹20.9 L+₹1.6 L (8.33%)Rejected-AOC | ₹20.9 L+₹1.6 L (8.33%) | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical VP 10 323 CHITHRALAYAM NALANKALLU VILAVOORKAL MALAYINKEEZHU THIRUVANANTHAPURAM 695571 | THIRUVANANTHAPURAM | KERALA | 695571 | - | - | Not Admitted-Fee/PreQual/Technical Others-MSME certifcate not submitted |
Tender Value
₹21.7 L
EMD Value
₹65,000
Closing Date
26 Oct 2022, 3:00 pmClosed
Deputy Vice President (HCD)
HLL Lifecare Limited, HLL Bhavan, No26/4, Tambaram-Velachery Main Road, Pallikaranai, Chennai 600 100, Tamilnadu
Civil work for conversion of Primary Health Center (PHC) to Family Health Center (FHC) in Irimbiliyam, Malapuram District in Kerala
2022_HLL_517939_1
HLL/HCD/CE/PHC/IBM/FHC/22-23
Open Tender
Civil Works - Buildings
Item Rate
90 days
PHC Irimbiliyam, Malapuram District
Please refer Tender documents.
12 documents required · 12 mandatory
₹500
Yes
₹65,000
Yes
8 Feb 2023
18 Oct 2022
27 Oct 2022
18 Oct 2022
26 Oct 2022
18 Oct 2022
Amount
Civil Work
Dismantling and Demolishing work
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Earth Work
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Cement Concrete Work
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate)finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate
RCC work
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinthand string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide
Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
MASONRY WORKS
Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
PLASTERING
12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
Painting
White washing with lime to give an even shade:New work (three or more coats)
STEEL WORKS
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
Providing and fixing GI Sheet metal panels of thickness 1.5mm with designs cut with<br>CNC machines welded on to Existing GI frameworks. including a coat of Primer on sheet.
ASBAR VAFA TK
SEEMAMU P K
AMEER ALI N.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .