Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹57.4 L
EMD Value
₹1.1 L
Closing Date
8 Jan 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AS PER THE NIT
AS PER THE NIT
Improvement of Foot Bridges at Rawalpora Canal Lane Astanpora Takiya Mohalla Lal Nagar Natipora Crossing.
2026_PWDJK_299584_1
NIT NO 93/RNB/RAJ OF 2025-26 DATED 01/01/2026
Open Tender
Civil Works
Percentage
150 days
SRINAGAR
ASPER THE NIT
2 documents required · 2 mandatory
₹1,600
AS PER THE NIT
₹1.1 L
Yes
1 Jan 2026
1 Jan 2026
9 Jan 2026
1 Jan 2026
8 Jan 2026
1 Jan 2026
Rawalpora Canal lane 1
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. and further taking all the serviceable material to Divisional store incl. leads and lifts complete.
Engagement of labours for repairing of existing railing refixing incl. welding charges, labour complete job.
Black smith 1st class
Black smith 2nd class
Labour
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On steel work
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials involved complete.
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
Carraige of material by mechanical Transport including loading unloading etc complete.
Sand for an average lead of 15 km
Aggregate for an average lead of 15 km
Astanpora
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.in stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. and further taking all the serviceable material to Divisional store incl. leads and lifts complete.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On steel work
Takya Mohallah Lal Nagar
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.in stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. and further taking all the serviceable material to Divisional store incl. leads and lifts complete.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On steel work
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
P/L stone soling (Hand packed) in trenches incl. ramming, dressing ,watering etc. incl. all leads, lifts and carriage upto site of work complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
Structural steel welded work in built up sections,trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Carraige of material by mechanical Transport including loading unloading etc complete.
Sand for an average lead of 15 km
Aggregate for an average lead of 15 km
Natipora Crossing
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.in stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. and further taking all the serviceable material to Divisional store incl. leads and lifts complete.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On steel work
Rehabilitation of existing Barzula Bridge
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On concrete work
Metal Beam Crash Barrier--Type-B,THRIE: Metal Beam Crash Barrier(Providing and erecting a Thrie metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail,85cm above road/ground level, fixed on ISMC series channel vertical post, 150x75x5mm spaced 2 m centre to centre, all steel parts and fitments to begalvanised by hotdip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to befixed on the vertical post with as face of channel section 150 x 75 x 5 mm, 546 mm long complete, Including Concrete required for fixing. the posts as per clause 810 all speifications as per noms at various spots as directed by EIC complete job.incl. carraige complete.
Carraige of material by mechanical Transport including loading unloading etc complete.
Sand for an average lead of 15 km
Aggregate for an average lead of 15 km
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_971877.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .