Loading…
Loading…
Tender Value
₹6.0 L
EMD Value
₹12,060
Closing Date
31 Aug 2026, 6:00 pm7d left
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_321100_13
72 REW samba of 2026-27, Dated 17.08.2026
Open Tender
Civil Works
Percentage
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹12,060
17 Aug 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10sqm on plan including disposal of excavated earth upto 1m from cutting edge in all kinds of soil. | 240 | sqm | 91.75 | ₹22,020 |
| 2 | Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed within 25mts lead. | 13.24 | cum | 479.3 | ₹6,345.93 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | 4,826.5 | - |
| 4 | Providng and laying in position cement concrete of specified grade in excluding cost of centering, shuttering all work upto plinth level 1:3:6 (1 cement : 3 fine sand : 6 graded crushed 20mm agg.) including all leads, lifts and carriages complete. | 1.9 | cum | 5,733.6 | ₹10,893.84 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,788.4 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 123.2 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work | - | sqm | 286.35 | - |
| 8 | Supplying and fixing of 40mm wide PVC strips for joints. | 67 | m | 50 | ₹3,350 |
| 9 | 40mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 28mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 12mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from 7 mm to 10mm nominal size, laid in cement marble powder mix 3:1 (3 cement : 1 marble powder) by weight in proportion of 2:3 (2 cement marble powder mix :3 marble chips) by volume including cement slurry and curing complete : Ordinary cement without any pigment. | 74.33 | sqm | 958.6 | ₹71,252.74 |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. | 655 | kg | 156.95 | ₹1,02,802.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1070687.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].