| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | -34.75% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 CrAdmitted-Finance | -34.55% | ₹2.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.4 CrAdmitted-Finance | -34.51% | ₹2.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.4 CrAdmitted-Finance | -33.77% | ₹2.4 Cr | L4 | Admitted-Finance |
| 5 | L5₹2.5 CrAdmitted-Finance | -31.17% | ₹2.5 Cr | L5 | Admitted-Finance |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
10 Apr 2026, 4:00 pmClosed
Xen RNB Sopore
RNB Sopore
Construction of skill Development centre at Government Degree College Sopore.
2026_PWDJK_306507_1
NIT No 185 /2025-26/RnB/Sopore
Open Tender
Civil Works
720 days
Sopore
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,500
Xen RNB Sopore
₹7.4 L
SE RNB Bla
27 Apr 2026
20 Mar 2026
11 Apr 2026
21 Mar 2026
10 Apr 2026
25 Mar 2026
25 Mar 2026 - 10 Apr 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Part:Dewatering with Pumps of adequate HP including Suction Delivery Pipe and DG Sets,Diesel,man power etc so as to dawater the entire site for laying of foundation incld plugging of inflow water complete Job as per the directions of Site Engineer. | |||||
| 2Earth work in excavation in all kinds of soil by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer incld.cutting of trees, removal of tree stumps and dewatering of trenches during execution of work.. | |||||
| 3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | |||||
| 4 | Supply and filling of stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering incld. carriage of material from source to site of work complete. | 1 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 stone aggregate 20mm nominal size) including curing complete including all carriages. | 1 | Cum | - | - |
| 6Supply and filling of RBM under Floors incld watering ,ramming and consolidation with Hand rammer with aggregrate size not exceeding 90 mm incld cost and carriage of material upto site of work. | |||||
| 7Filling With Nallah Boulders (75 mm to 150 mm thick) under floors Handpacked and ramming complete with carriage. | |||||
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable
separately.All works upto plinth level incld all carriage. | 1 | Cum | - | - |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable
separately.All works above plinth level incld all carriage. | 1 | Cum | - | - |
| 10Add or deduct for using more or less cement in the items of design mix over and above the specified cement content therein. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 0.48 MB
BOQ_995187.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid