| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹12.5 L+₹6,409.97 (0.52%)Rejected-Finance PALLIYADIYIL VEEDU MUTHUPILAKKADU WEST PO SASTHAMCOTTA 690520 | SASTHAMCOTTA | KOLLAM | KERALA | 690520 | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | Rejected-Technical | - | Rejected-Technical THIRD LOWEST |
| Sl No | Description | Qty | Unit | JAYAKUMAR L2 | ARUN RAJ J A L3 | Anandhu L1 |
|---|---|---|---|---|---|---|
| 1.00RETTARING | ||||||
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 768 | sqm | 15.87 ₹12,188.16 | 16.36 ₹12,564.48 | 15.79 ₹12,126.72 Lowest |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 100.8 | cum | 3,717.68 ₹3,74,742.14 | 3,832.66 ₹3,86,332.13 | 3,698.52 ₹3,72,810.82 Lowest |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 768 | sqm | 78.01 ₹59,911.68 | 80.42 ₹61,762.56 | 77.61 ₹59,604.48 Lowest |
| 1.00 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 768 | sqm | 18.38 ₹14,115.84 | 18.95 ₹14,553.6 | 18.29 ₹14,046.72 Lowest |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 110.9 | sqm | 411.94 ₹45,684.15 | 424.68 ₹47,097.01 | 409.82 ₹45,449.04 Lowest |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,634 | sqm | 15.36 ₹25,098.24 | 15.83 ₹25,866.22 | 15.28 ₹24,967.52 Lowest |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 2,402 | sqm | 297.05 ₹7,13,514.1 | 306.24 ₹7,35,588.48 | 295.52 ₹7,09,839.04 Lowest |
Tender Value
₹12.8 L
EMD Value
₹32,094
Closing Date
27 Aug 2025, 5:00 pmClosed
AEE NEYYATTINKARA MUNICIPALITY
AEE NEYYATTINKARA MUNICIPALITY
Annual Plan-218/25-26-MAINTANANCE OF OLATHANNI NULLIYODU PEZHUVILA ENTHYVILA ROAD IN CHUNDAVILA WARD -General Civil Work-1
2025_LSGD_785386_16
E5/AEE/LSGD/2025 /SECOND
Open Tender
Civil Works - Roads
Item Rate
180 days
NEYYATTINKARA MUNICIPALITY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹32,094
Yes
17 Oct 2025
21 Aug 2025
30 Aug 2025
21 Aug 2025
27 Aug 2025
21 Aug 2025
Amount
RETTARING
3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
JAYAKUMAR (BID ID -2312187)
ARUN RAJ J A (BID ID -2312254)
Bidder Name
JAYAKUMAR
Anandhu
ARUN RAJ J A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .