| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-Finance 567 | KHERI | UTTAR PRADESH | 261501 | L1 | Accepted-Finance As Per Lowest Rate | |
| 2 | L2₹16.1 L+₹2.2 L (15.6%)Rejected-Finance MOH BARKHERWA DISTRICT LAKHIMPUR KHERI | KHERI | UTTAR PRADESH | 261501 | L2 | Rejected-Finance As Per Highest Rate | |
| 3 | L3₹16.6 L+₹2.6 L (18.8%)Rejected-Finance 142 SHASHTRI NAGAR DISTRICT LAKHIMPUR KHERI UP | KHERI | UTTAR PRADESH | 261501 | L3 | Rejected-Finance As Per Highest Rate |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
20 Jan 2026, 12:00 pmClosed
Executive Engineer
EE CD-3 PWD Lakhimpur Kheri
Maintenance of Gujara link road in Km.-1 of 1x8.00 m span RCC culvert.
2026_CEUCZ_1104884_1
2416/e-tender/2025 Dated 31-12-2025
Open Tender
Civil Works - Bridges
Fixed-rate
60 days
Lakhimpur Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.2 L
Yes
EE CD-3 PWD Lakhimpur Kheri
12 Feb 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
12 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer, Construction Division-3, P.W.D., Lakhimpur-Kheri
Name of Work: Maintenance of Gujara Link Road in Km-1 of 1x8.00 m span RCC Culvert.
Contract No: 2416 /e-Tender/2025 Dated 31-12-2025
Item Description Item Code / Make Quantity Units Estimated Rate UNIT Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Boring with 100 mm dia casing pipe for dewatering including cost of pipes , other materials, labour charges etc. complete. Nos Excess(+) Full Conversion INR INR Eighteen Thousand Six Hundred Only
2 Dewatering the ground water for trenches with hire, operational & fuel charges of pump with oprater complete. Hour's Excess(+) Full Conversion INR INR One Lakh Twenty Nine Thousand Six Hundred Only
3 Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Cum Excess(+) Full Conversion INR INR Twenty Two Thousand Four Hundred Only
4 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Cum Excess(+) Full Conversion INR INR Two Lakh Fifty Four Thousand &Fifty and Paise Fifty Only
5 Brick masonry work in cement mortar in substructure/superstructure complete excluding pointing and plastering, as per drawing and technical specification clauses 600, 602, 603, 604, 900, 1202, 1204 & 1208.4 Cum Excess(+) Full Conversion INR INR Ten Lakh Twenty Six Thousand Four Hundred Only
6 Providing weep holes in plain/reinforced concrete abutment ,wing wall and return wallwith 75 mm dia P.V.C. Pipe extending through the full width of the structure with slope 1V: 20 H towards drawing face. complete as per drawing and technical specification. Rm Excess(+) Full Conversion INR INR One Thousand Seven Hundred & Twenty Seven and Paise One Hundred Only
7 Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 Sqm Excess(+) Full Conversion INR INR Eight Thousand Three Hundred & Twelve and Paise One Hundred Only
8 Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 Cum Excess(+) Full Conversion INR INR One Lakh Sixty Five Thousand Only
9 Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 Cum Excess(+) Full Conversion INR INR One Lakh Eighty Four Thousand Eight Hundred & Thirty Seven and Paise Fifty Only
10 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 Cum Excess(+) Full Conversion INR INR Three Lakh Forty One Thousand Eight Hundred & Fifty Only
Total in Figures INR Twenty One Lakh Fifty Two Thousand Seven Hundred & Seventy Nine Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 1.29 MB
BOQ_2038497.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .