Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC BIDHAN MARKET BARASAT | BARASAT | L1 | Accepted-AOC LOWEST_RATE | |
| 2 | L2₹5.0 L+₹6,438 (1.29%)Rejected-Finance RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L2 | Rejected-Finance HIGHER_RATE | |
| 3 | L3₹5.2 L+₹24,327 (4.89%)Rejected-Finance HIJALPUKUR M M DUTTA ROAD HABRA 24 PARAGANS N | HABRA | 24 PARAGANS N | WEST BENGAL | L3 | Rejected-Finance HIGHER_RATE |
Tender Value
Refer Docs
EMD Value
₹9,963
Closing Date
16 Jan 2023, 2:00 pmClosed
Executive Engineer Electrical Division No II H D
67 Bentinck Street 3rd floor Kolkata 69
Urgent hiring of five Nos Diesel Engine pump and one Nos DG set to removing the water logging and Emergency power supply due to heavy rainfall at IHE PATULIA under Sodepur Electrical Section_HD__Phase I
2023_HSD_441008_1
WBHD/EE/ED-II/e-NIQ-6/22-23
Open Tender
ELECTRICAL WORKS ORG
Item Wise
15 days
PATULIA
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,963
KOLKATA
19 Apr 2023
3 Jan 2023
18 Jan 2023
4 Jan 2023
16 Jan 2023
7 Jan 2023
6 Jan 2023
Amount
Hire charges for Diesel Engine pump set with necessary connection ,suction & delivery pipe and loading / unloading for 07 Days. (05 nos x 7 days)
5 no.Skilled Operator for 7 Days.(For Diesel Engine pump) 5X7 =35 no. skilled operator.
Transportation Charges for Diesel engine Pump (From Contactor's Workshop to Site and vice-versa).
Hire charges for 32 KVA sound proof generator with necessary connection and loading / unloading for 07 Days. (1 nos x 7 days).
1 no. Skilled Operator for 7 Days(For DG) ,1X7=7 no skilled operator.
Transportation Charges for DG (From Contactor's Workshop to Site and vice-versa).
S & D of Diesel oil for the pump and Generator: For Pump : 7 hour Run x 5 nos x 7 days= 245 hours, 245 hours x 1 litre/hour =245 litre For DG : 3 hour Run x 1 nos x 7 days = 21 hours 21 hours x 7.6 litre/hour = 159.6 litre Total = 245+159.6 =404.6 litre
Add G.S.T 18% on aggregate amount of BOQ item No 1 to 7.
Add LW Cess 1% on aggregate amount of BOQ item No 1 to 7 (after add G.S.T 18 %)
NITESH MANAGEMENT
CHATTERJEE ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .