Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | ₹7.0 Cr Quoted ₹7.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.9 Cr+₹26.9 L (3.55%)Rejected-Finance 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹7.9 Cr+₹26.9 L (3.55%) | L2 | Rejected-Finance Higher bid value |
| 3 | L3₹8.0 Cr+₹40.5 L (5.33%)Rejected-Finance A 1 1 BKTPP CHP AREA BKTPP BIRBHUM 731104 | BIRBHUM | BIRBHUM | WEST BENGAL | 731104 | ₹8.0 Cr+₹40.5 L (5.33%) | L3 | Rejected-Finance Highest bid value |
Tender Value
Refer Docs
EMD Value
₹13.2 L
Closing Date
4 Jun 2021, 4:00 pmClosed
Deputy General Manager (M and C)
GM bldg,KTPS,Mecheda,Purba Medinipur 721137
Coal cleaning , coal breaking and stone removal from track hopper , wagon tippler gratings , other related work (like track cleaning at track hopper/WT, Oil hose fit-ting/removal for oil unloading purpose and assistance to vibro-feeder operatio
2021_WBPDC_330865_1
GM(K)/ CC/ CHP-O/ 3222(Vol 7)/E1771
Open Tender
Support/Maintenance Service
Item Rate
730 days
GM bldg, KTPS, Mecheda, Purba Medinipur 721137
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13.2 L
Yes
Conference Hall,GM bldg,KTPS,Mecheda,Purba Medinip
28 Oct 2021
10 May 2021
7 Jun 2021
10 May 2021
4 Jun 2021
18 May 2021
17 May 2021
Amount
PART A
Maximum possible expenditure for total labour charge for 86 nos. Contractual Workers including O.T., & night shift allowance & all other applicable benefits and & allowances as per MOS dtd. 25/06/2015 & considering workers’ wage rate as on 01/07/2020, excluding profit and overhead
Charge for 1 no. Site- In- Charge excluding profit and overhead
Charge for 7 no. supervisor excluding profit and overhead
Total safety PPEs and consumables cost excluding profit and overhead
Total tools & tackles cost excluding profit and overhead
profit and overhead on above mentioed all items
PART B ( On actual execution basis (optional job)
Running cost of Escort including fuel oil, lube oil(considering @540 hrs./month
Extra Cost for Oil rake unloading including oil pipe fittings and removal after oil rake unloading
Cleaning of platform of TH&WT by Air
Arch breaking at TH by operating PF & WT Hopper by poking (considering 8 nos. arch breaking per month)
AKA Logistics Private Limited
PROJECT CONSTRUCTION SERVICES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .