Executive Engineer
O/o Executive Engineer, PRI Division, Rajampet
Construction of Village Health Clinic at Madhavarampodu (V&GP) of Kodur Mandal with an est. cost of Rs. 36.00 Lakhs
908950
NIT No.172/AEE/Tender/2025-26, Dt.12.11.2025, Dt.30.12.2025 & Dt.26-02-2026, of the Executive Engineer, PRI Division, Rajampet (3rd Call)
OPEN - NCB
Buildings
ANNAMAYYA
8 documents required · 7 mandatory · 1 optional
₹1,012
₹28,579
27 Mar 2026
5 Mar 2026
5 Mar 2026
Earthwork excavation for foundations of building and depositing the earth on bank with an initial lead of 10m and initial lift of 2m in ordinary gravelly soils including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T&P, Labour charges etc. complete for finished items of work (APSS No 308), including Overhead charges and Contractors Profit @ 13.615%
Filling with Sand in trenches, sides of foundations & basement by watering and ramming including all operational, incidental, Labour charges, hire charges of T&P etc. complete including cost and conveyance of material and Labour charges etc. complete for finished item of the work (APSS No 309& 310), including Overhead charges and Contractors Profit @ 13.615%
Plain Cement Concrete (1:4:8) prop using 40mm size HBG (SS5) metal including Cost and Conveyance of all materials and curing charges but excluding unskilled wages etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)(CSSR), including Overhead charges and Contractors Profit @ 13.615%
Plain Cement Concrete (1:5:10) prop using 40mm size HBG (SS5) metal including Cost and Conveyance of all materials and curing charges but excluding unskilled wages etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) (CSSR), including Overhead charges and Contractors Profit @ 13.615%
RR Masonry in CM (1:8) including Cost and Conveyance of all materials and Labour charges etc., Complete, including Overhead charges and Contractors Profit @ 13.615%
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Footings
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Pedestals
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Columns
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Plinth Beam
Filling with Excavated Earth in foundation trench etc., complete for finished item of work as per technical specification clause 305.3.9 MORD & 304 MORTH, including Overhead charges and Contractors Profit @ 13.615%
Filling with Sand in trenches, sides of foundations & basement by watering and ramming including all operational, incidental, Labour charges, hire charges of T&P etc. complete including cost and conveyance of material and Labour charges etc. complete for finished item of the work (APSS No 309& 310), including Overhead charges and Contractors Profit @ 13.615%
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Lintles
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Sunshades
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Roof Beams
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Roof Slab 125 mm Thick
Supply and placing of the M25 Design Mix OPC Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER, Steel Centering using Jacks & Props with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and Labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - For Roof Slab 100 mm Thick
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and Labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc.,, complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Masonry work in CM (1:8) prop with country bricks of size 230X110X70 mm, including cost and conveyance of all materials, Labour charges, scaffolding and curing etc., complete for walls, including Overhead charges and Contractors Profit @ 13.615%
Reinforced Brick Masonry walls of 11cm in CM(1:3) using country bricks of size 230X110X70 mm and using two mild steel bars of 6m dia in every third layer of brick masonry, with free joints of the main block work including cost and seginorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, Labour charges such as scaffolding mixing mortar constructing masonry lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509, including Overhead charges and Contractors Profit @ 13.615%
Ornamental Plastering to Ceiling 12mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, and operational, incidental charges and all Labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904), including Overhead charges and Contractors Profit @ 13.615%
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site and operational, incidental charges and all Labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) for Internal faces of walls, including Overhead charges and Contractors Profit @ 13.615%
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site and operational, incidental charges and all Labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) for External faces of walls, including Overhead charges and Contractors Profit @ 13.615%
Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and Labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing of Teak Wood Door of Size 1.20x2.10m with Double shutter, frame made of well seasoned Country Wood scantlings of size 100 x 75mm and door shutter with styles & Rails of 100mm wide and 37.50mm thick and planks with 37.50mm thick as per approved design with fixtures of 6 nos of MS ' z" holdfasts, 300 mm long Brass aldrop-1 no, 125mm long Al butt hinges 6 No's,no, 150mm long Al Tower bolts - 2no's, Brass Fancy handles 150mm long 1no's, Al handles 150mm long 1no's with necessary screws complete including cost and conveyance of all materials and Labour charges etc. complete as per specifications (APSS NO.1001 & 1002) (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200 mm x 2100mm), including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing doors with Sal wood frame of section 100mm x 75 mm and ISI marked flush door shutters /Powder Coated of single shutters, solid bond wood block board type with Commercial ply on both faces.: 25 mm thick conforming to IS:2202 including cost and conveyance to site of Sal wood frame, flush shutter including fixing the all fixtures to door 3 Nos of Al. Butt hinges 125 mm long, 2 Nos of Al, tower bolts 150 mm long, 2 Nos of Al Handles 150 mm long, 1 No of MS-Powder Coated Aldrop (IS:2681) 300 mm long and 1 No of Brass door stoppers with required number of screws, bolt and nuts including Labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1050 mm x 2100mm), including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing doors with Sal wood frame of section 100mm x 75 mm and ISI marked flush door shutters /Powder Coated of single shutters, solid bond wood block board type with Commercial ply on both faces.: 25 mm thick conforming to IS:2202 including cost and conveyance to site of Sal wood frame, flush shutter including fixing the all fixtures to door 3 Nos of Al. Butt hinges 125 mm long, 2 Nos of Al, tower bolts 150 mm long, 2 Nos of Al Handles 150 mm long, 1 No of MS-Powder Coated Aldrop (IS:2681) 300 mm long and 1 No of Brass door stoppers with required number of screws, bolt and nuts including Labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (900 mm x 2100mm), including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing doors with Sal wood frame of section 100mm x 75 mm and ISI marked flush door shutters /Powder Coated of single shutters, solid bond wood block board type with Commercial ply on both faces.: 25 mm thick conforming to IS:2202 including cost and conveyance to site of Sal wood frame, flush shutter including fixing the all fixtures to door 3 Nos of Al. Butt hinges 125 mm long, 2 Nos of Al, tower bolts 150 mm long, 2 Nos of Al Handles 150 mm long, 1 No of MS-Powder Coated Aldrop (IS:2681) 300 mm long and 1 No of Brass door stoppers with required number of screws, bolt and nuts including Labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (750 mm x 2100mm), including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing of grills to windows including cost and conveyance of all materials, fabrication charges etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Providing and fixing factory made uPVC white color sliding glazed window upto 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to UPVC profile), appropriate dimension of uPVC extruded glazing beads and UPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealant . Note: For uPVC frame and sash extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Variation in profile dimension in higher side shall be accepted. But no extra payment on this account shall be made. Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm) (BMT-P.80.A), including Overhead charges and Contractors Profit @ 13.615%
Flooring with high polished granite 16 to 18 mm thick for risers/ treads of steps, set over base coat of CM (1:8) 20 mm thick with cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of conveyance of all materials, including Overhead charges and Contractors Profit @ 13.615%
Providing skirting to internal walls to 10 cm height/risers of steps with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of Size 600 x 600 mm and thickness between 8-10 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15), length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15), set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Flooring (Dadooing) with glazed red or white full body ceramic wall tiles of Size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm and 1st quality, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Providing and applying synthetic plaster putty or equivalent putty Cush as Birla wall care putty or texture paint or equivalent such as NCL/Saicoat texture of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying emery paper , sand the surface clean and wipe off loose dust. applying putty/texture paint filter by putty knife/muslin pad. air dry for 2-3 hours for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, Labour charges etc., complete. for finished item of work for internal walls excluding cost of access scaffolding, including Overhead charges and Contractors Profit @ 13.615%
Supplying and fixing of stainless steel (grade 304) hand railing as per approved drawing with top rail of 64mm dia (Outer) pipe and 2mm thick medium class and vertical posts of 50mm dia and 2mm thick at 600mm c/c spacing (7 nos.) and 3 nos 25 mm dia (outer) 1.6 mm thick stainless steel base plate to be fixed to the steps with Anchor fastners. The rate should include providing and using bonding agent , drilling of 25mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly, lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all Labour charges etc., , complete for finished item of work in all floors OF INTERNAL WALLS, including Overhead charges and Contractors Profit @ 13.615%
Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, incidental, operational and all Labour charges etc., , complete for finished item of work in all floors OF EXTERNAL WALLS, including Overhead charges and Contractors Profit @ 13.615%
Supply and Fixing of 25mm dia 2.20mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonry work and Labour charges etc., complete. Make : Sudhakar/ Maco Plast / Modi, including Overhead charges and Contractors Profit @ 13.615%
Supply and Fixing of 25mm dia 2.00mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonry work for light, fan and separate plug point with well seasoned TW box including all Labour charges etc., complete. Make : Sudhakar/ Maco Plast / Modi, including Overhead charges and Contractors Profit @ 13.615%
Supply and run of 1 of 14/0.3mm (1.0 Sqmm) FR / FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable in existing pipe for earth continuity including cost of all materials, all taxes, conveyance to site and all Labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Supplying & run of 2 of 2.5 Sqmm 36/0.3mmFR PVC insulated flexible copper cable in Existing pipe for mains including cost of all materials, all taxes, conveyance to site and all Labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Supply and 2 runs of 4.0 sq mm PVC insulated flexible copper cable and 1 run of 2.5 sq.mm flexible PVC insulated copper cable for earthing in the existing conduit pipe for power point including Labour charges for 16A sockets, including Overhead charges and Contractors Profit @ 13.615%
Supply and run of 4 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for Generator mains including cost of all materials, all taxes, conveyance to site and all Labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A modular switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all Labour charges etc., comp Make : Finolex / RR Kabel / KEI, including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all Labour charges etc., complete. Makes : Anchor Penta cherry/ Gold Medal Olive /Million Zoom , including Overhead charges and Contractors Profit @ 13.615%
Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) duly recessed in wall with metal boxes, covered with modular cover frame including earth connections and all Labour charges etc., complete, including Overhead charges and Contractors Profit @ 13.615%
Supply of Mini Modular Stepped type Electronic Regulator with Cover Frame for Ceiling fans 900/1200/1400mm sweep complete erected on existing board including cost of all materials, all taxes, conveyance to site and all Labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Supply & Fixing of 1200mm (48") sweep 230V, A.C 50 Hz. ceiling fan with 3 blades and double ball bearings with all standard accessories including cost of all materials, all taxes, conveyance to site and all Labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Supply, Transportation and fixing of 4' - 40 Watt box type flourescent single Tube Light fitting with Energy saving electronic ballast, consuming 28 W suitable for 40 Watt tube on varnished teak wood round blocks with flexible 3 core wire etc.,, complete, including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all Labour charges with 40W bulb (for new installation), including Overhead charges and Contractors Profit @ 13.615%
Supply of 1x40W weather proof flourescent streetlight fitting comprising canopy of sheet Aluminium in stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc., complete, including Overhead charges and Contractors Profit @ 13.615%
Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., including giving connections and labour charges etc., complete, including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing of 3-Phase Meter Board with 18" x 30" size Peta Board with 3 No. of 100A, 415 V Fuse Unit and 32A Standard make including giving internal connections including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including cost of all materials, all taxes, conveyance to site and all Labour charges for all operations etc., complete as directed by Engineer in Charge, including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circuit Braker (ELCB) / Residual Current Circuit Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and Labour charges for surface / flush mounting etc., complete, including Overhead charges and Contractors Profit @ 13.615%
Supply of 35 sqmm 3.5 core PVC XLPE armourd cable 1100V Grade with ISI Mark Standard / Solid Alluminium Conductor, including Overhead charges and Contractors Profit @ 13.615%
Supplying and fixing Prince/Sudhakar or equivalent ISI make PVC SWR grade Pipes of type B class and specials like bends, Tee, Y-junction with or without door, Vent cowl, providing and fixing cleaning / rodding eye with endcap wherever required, etc., cutting the pipes, laying or fixing to perfect plumb, with slopes where required, making joints using solvent cement solution or with ring seal couplers of size available pipe of 110mm and 75mm dia., providing 110 dia PVC make up piece with inlet connections, providing and fixing G.I. U clamps to the brackets, Providing and removing necessary scaffolding where required, providing supports for pipes laid in false ceiling using G.I.hangers fixed to R.C.C slab including providing and fixing necessary anchor fasteners and clamps, conducting water test for leak proof joints and the materials, etc., complete, including Overhead charges and Contractors Profit @ 13.615% - 110mm dia 4kg/ sq.cm single socket upvc waste pipe
Supplying and fixing Prince/Sudhakar or equivalent ISI make PVC SWR grade Pipes of type B class and specials like bends, Tee, Y-junction with or without door, Vent cowl, providing and fixing cleaning / rodding eye with endcap wherever required, etc., cutting the pipes, laying or fixing to perfect plumb, with slopes where required, making joints using solvent cement solution or with ring seal couplers of size available pipe of 110mm and 75mm dia., providing 110 dia PVC make up piece with inlet connections, providing and fixing G.I. U clamps to the brackets, Providing and removing necessary scaffolding where required, providing supports for pipes laid in false ceiling using G.I.hangers fixed to R.C.C slab including providing and fixing necessary anchor fasteners and clamps, conducting water test for leak proof joints and the materials, etc., complete, including Overhead charges and Contractors Profit @ 13.615% - 90mm dia 4kg/ sq.cm single socket upvc waste pipe
Supplying and fixing Prince/Sudhakar or equivalent ISI make PVC SWR grade Pipes of type B class and specials like bends, Tee, Y-junction with or without door, Vent cowl, providing and fixing cleaning / rodding eye with endcap wherever required, etc., cutting the pipes, laying or fixing to perfect plumb, with slopes where required, making joints using solvent cement solution or with ring seal couplers of size available pipe of 110mm and 75mm dia., providing 110 dia PVC make up piece with inlet connections, providing and fixing G.I. U clamps to the brackets, Providing and removing necessary scaffolding where required, providing supports for pipes laid in false ceiling using G.I.hangers fixed to R.C.C slab including providing and fixing necessary anchor fasteners and clamps, conducting water test for leak proof joints and the materials, etc., complete, including Overhead charges and Contractors Profit @ 13.615% - 75mm dia 4kg/ sq.cm single socket upvc waste pipe
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and conveyance of all materials to site, all Labour charges, sales and other taxes on all materials etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parry ware make white glazed with 'P' trap including 10 lit. low level PVC flushing system of parry ware make confirming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connector, 15mm dia Cp brass strop cock 300 grams of ISI make, cutting and making good the walls and floors wherever required including cost & conveyance of all material to work site, all Labour charges for all operations for fixing, all taxes etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parry ware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 450mm x 300mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks, including Overhead charges and Contractors Profit @ 13.615%
Supplying and fixing of 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, Labour charges , overheads & contractors profit etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supplying and fixing 4" (101.6 mm ) Floor Trap - UPVC/SWR Pipe fittings 1st quality ISI marked with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, Labour charges etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supply & fixing of tested NP bib taps at all levels of 12.70mm dia of Indian make 400g first quality including cost & conveyance of all materials, Labour charges for finished item of work, and all taxes complete for all floors, including Overhead charges and Contractors Profit @ 13.615%
Supply & fixing bib cock cum health faucet with 1 m long flexible tube and wall hook of Jaquar make queen series with 7 years warranty Chrome plated, including Overhead charges and Contractors Profit @ 13.615%
Providing and placing on terrace (at all floor levels) polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and Labour charges for placing and fixing in position as directed by Engineer-in-Charge, including Overhead charges and Contractors Profit @ 13.615%
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from identical CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007), including Overhead charges and Contractors Profit @ 13.615% - 15.90mm ODPipe - SDR 13.50
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from identical CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007), including Overhead charges and Contractors Profit @ 13.615% - 22.20mm ODPipe - SDR 13.50
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from identical CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007), including Overhead charges and Contractors Profit @ 13.615% - 28.60mm ODPipe - SDR 13.50
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from identical CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007), including Overhead charges and Contractors Profit @ 13.615% - 34.90mm ODPipe - SDR 13.50
Providing & fixing GM gate / ball valve of 32 mm dia as per IS -778 Class - I, Indian make heavy type, including cost & conveyance of all material to work spot and all Labour charges including fixing in position for finished item of work and all taxes, including Overhead charges and Contractors Profit @ 13.615%
Supply and fixing of 110 mm dia ISI mark PVC rain water spouts of 4 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and Labour charges such as fixing in alignment etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615% - 110 mm dia 4 Kgs/sqmm
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & OG Soils ( SS 20-B) including all operational incidental l/c such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, Labour charges etc., complete for finished item of work including seginorage charges excluding dewatering charges etc., complete for Septic tank soak pit and sump.(APSS No. 308), including Overhead charges and Contractors Profit @ 13.615%
Plain Cement Concrete (1:4:8) prop using 40mm size HBG (SS5) metal including Cost and Conveyance of all materials and curing charges but excluding unskilled wages etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)(CSSR), including Overhead charges and Contractors Profit @ 13.615%
Plain Cement Concrete M 25 grade nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and Labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Masonry work in CM (1:8) prop with Second Class bricks of size 230X110X70 mm, including cost and conveyance of all materials, Labour charges, seginorage charges, scaffolding and curing etc., complete for walls, including Overhead charges and Contractors Profit @ 13.615%
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45X45cm including c/c of all m/l like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and Labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903), including Overhead charges and Contractors Profit @ 13.615%
Reinforced Cement Concrete M-25 Design mix (Cement: Fine aggregates: Coarse aggregates) corresponding Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate( Sand), coarse aggregate, water etc to site and including sales and other taxes on all materials including all operational, incidental and Labour charges such as machine mixing, laying concrete, curing etc complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Supplying and fixing of 110mm dia SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/Sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, Labour charges etc. Complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326), including Overhead charges and Contractors Profit @ 13.615%
Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and Labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work, including Overhead charges and Contractors Profit @ 13.615%
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ 36 L NIT 172.xlsx
TENDER_DOCUMENT • 0.35 MB
SBD 36 L NIT 172.docx
TENDER_DOCUMENT • 0.22 MB
Schedules B 36 L NIT 172.xlsx
TENDER_DOCUMENT • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .