Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 CrAdmitted-Finance A 1 BLOCK A ASTHA APRTMENT BHOJUBEER NEAR CIRCUIT HOUSE VARANASI UTTAR PRADESH 221002 UDYAM UP 75 0008931 | VARANASI | UTTAR PRADESH | 221002 | ₹2.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFY IN PQR |
| Sl No | Description | Qty | Unit | AMIT ENGINEERING CORPORATION L3 | M/s Sharada Electricals L4 | M/S Grid Power Systems L2 | M/s adrsh Enterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.00DECENTRALISED MATERIAL | |||||||
| 1.01A. Shifting of 33KV line by Conversion of O/H to U/G Line (Double Ckt) and already existing U/G Line- | |||||||
| 1.02 | Supply of 160 mm dia. HDPE pipe | 7,200 | Mtr. | 39,60,000 ₹39,60,000 | 29,88,000 ₹29,88,000 | 30,24,000 ₹30,24,000 | 27,36,000 ₹27,36,000 |
| 1.03 | Supply of G.I. pipe 6" dia with clamp and nut & bolts | 144 | Mtr. | 2,16,000 ₹2,16,000 | 1,22,400 ₹1,22,400 | 2,50,560 ₹2,50,560 | 2,16,000 ₹2,16,000 |
| 1.04 | Danger board | 24 | Nos. | 2,640 ₹2,640 | 7,800 ₹7,800 | 3,744 ₹3,744 | 6,672 ₹6,672 |
| 1.05 | Number Plate | 24 | Nos. | 2,640 ₹2,640 | 7,800 ₹7,800 | 3,744 ₹3,744 | 6,672 ₹6,672 |
| 1.06 | Barbed wire | 48 | Kg | 4,320 ₹4,320 | 6,000 ₹6,000 | 4,320 ₹4,320 | 2,400 ₹2,400 |
| 1.07 | Alluminium Paints | 48 | Ltr | 12,000 ₹12,000 | 21,600 ₹21,600 | 12,672 ₹12,672 | 4,800 ₹4,800 |
| 1.08 | Red Oxide Paints | 48 | Ltr | 4.8 ₹4.8 | 21,600 ₹21,600 | 9,216 ₹9,216 | 9,600 ₹9,600 |
| 1.09 | G.I. Angle 65x65x6 M.M. | 550 | Kg. | 49,500 ₹49,500 | 41,250 ₹41,250 | 62,700 ₹62,700 | 1,10,000 ₹1,10,000 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
17 Feb 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
UEDC-II, CHANDRIKA NAGAR COLONY, SIGRA, VARANASI
The work for shifting of Electrical utility form Rajghat Bridge via Kashi Dot pull to Shailputri Dot Pull by conversion from over head to under ground system and shifting of existing under ground system due to road widening in the area of UEDD-Rajgha
2026_PVVNV_1111609_1
27/UEDC-II(V)/2025-26
Open Tender
Electrical Works
180 days
UEDD-RAJGHAT
PLEASE REFER AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹6,195
EE, UECD-II, VARANASI
₹3 L
23 Feb 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
DECENTRALISED MATERIAL
A. Shifting of 33KV line by Conversion of O/H to U/G Line (Double Ckt) and already existing U/G Line-
Supply of 160 mm dia. HDPE pipe
Supply of G.I. pipe 6" dia with clamp and nut & bolts
Danger board
Number Plate
Barbed wire
Alluminium Paints
Red Oxide Paints
G.I. Angle 65x65x6 M.M.
G.I. Channel 100x50X5 M.M.
G.I. Angle 50x50x5 M.M.
Supply of Aluminum lugs -300 Sq.mm.
B. Shifting of 11KV lines
Supply of 100 mm dia. HDPE pipe
Supply of G.I. pipe 4" dia
Danger board
Number Plate
Barbed wire
Alluminium Paints
Red Oxide Paints
G.I. ANGLE 65x65x6MM
G.I. CHANNEL 100x50X5MM
G.I. ANGLE 50x50x5MM
C. Shifting of DTR and LT U.G Line
Supply of 160 mm dia. HDPE pipe
Supply of 100 mm dia. HDPE pipe
Danger board
Number Plate
Barbed wire
Alluminium Paints
Red Oxide Paints
Dead end clamp
Suspenstion clamp
Distribution Box
Piercing connector off size
MS nut bolts off size
G.I. ANGLE 65x65x6MM
G.I. CHANNEL 100x50X5MM
G.I. ANGLE 50x50x5MM
G.I. CHANNEL 125x65X6MM
Supply of Outdoor type. MAIN LT PANEL AT SUB STATION- 400 KVA (Type A-1) Incomer- 1 Set of 800 Amp. TP MCCB with Spreader & Extended handle Outgoing- 6 Set of 250 Amp. TP MCCB with Spreader & Extended handle ( 5 Nos. + 1 No. for capacitor panel) - 2 Set of 100 Amp. TP MCCB with Spreader & Extended handle
Supply of LT Distribution box with 01 No I/C MCCB 800 Amp & 04 No O/G MCCB 200Amp with multipal Trip setting
Supply of 6 – way Distribution feeder pillar, TP & N , 3 phase ,415 v , 315 Amps incoming rating type suitable for outdoor installation , in accordance with Technical Specification
Supply of 3-ph 415 V , Distribution Service Piller for LT. 100 Amp Incoming 4 nos 32 Amp, TPN 12 Nos 16 Amp SPN.Rating Feeder Type Distribution Service Piller suitable for Outdoor Installation.
Supply of Al. crimping lugs 400 sq.mm.
Supply of Al. crimping lugs 240 sq.mm.
Supply of Cable gland of suitable size along with all accessories
LABOUR AND ERECTION CHARGES
A. Shifting of 33KV line by Conversion of O/H to U/G Line (Double Ckt) and already existing U/G Line-
Loading unloading and carrage of 33 Kv 3x300 sq mm XLPE cable from Raja Talab center store to site
Loading unloading and carrage of ST Pole 11 Mtr long from Raja Talab center store to site
Loading unloading and carrage of other materials related to this project from Raja Talab center store to site
Erection of Heat Shrinkable Jointing Kit Outdoor for 33 KV 3x300 sq. mm XLPE Cable make rycheme/3M
Erection of Heat Shrinkable Jointing Straight Through Kit for 33 KV 3x300 sq. mm XLPE Cable make rycheme/3M
Grouting (1:3:6,1-cement, 3-coarse sand,6-concerate of 20mm Size) of 11 Mtr STP Pole with Muffing(300mm) as per TS
Laying of 160 mm dia. HDPE pipe by Horizontal drilling by HDD method as per site condition, for underground piping (trenchless) for road crossing.
Laying of 33 KV 3x300 Sqmm. XLPE Cable underground through HDPE Pipe at 1050 mm below the ground surface.(by HDD method) for road crossing
Digging of pit and Laying of 33KV cable by Providing of Brick on both side of cable and trench covered with stone slab after filling sand into the trnch/ molling method by providing of HDPE Pipe
Laying of G.I. pipe 6" dia with clamp and nut & bolts
Painting of ST Pole
Erection of 11Mtr S.T. Double pole structure complete with top channel, bracing angle, dropper angle,insulator,danger board, number board, barbed wire,allu lug, red oxide & allu paint along wth jumper required for hoisting of HT cable
Laying, testing & commissioning of 33 KV 3x300sq mm XLPE cable D/C (2X100Mtr) in HDPE Pipe after supply & laying of d/c HDPE pipe (2x70mtr) of 200 sqmm dai by Horrizontal drilling mathod with drilling machine the pipe shall be leid at the 2.0 mtr deep below railway track.and Sp. Earthing of D/P on Both side as per NORMS Providing 4No.G.I.Pipe of size 4' dia 3 mtr long, suitable clamp & Nut Bolts fixing of all accessories and earthing material etc.
Dismantling of Old Existing line and carriage of dismentalled Pole/Conductor/all other material upto utility Store as per site condition.
Punching of Aluminum lugs -300 Sq.mm.
Erection of Earthing of pole by MS earthing rod of 20x2500 mm. and 6 SWG GI wire etc. together with fixing arrangement as per TS.
Erection of Chemical pipe earthing for Cable J/Kit including cost of GI earth strip of size 25x5mm and connection as rerquired.
Erection of ACSR Dog Conductor
Hoisting and Clamping of 33 KV 3x300sq mm cable on Double Pole through G.I.Pipe along with providing of required clamp and nut bolt etc.
B. Shifting of 11KV lines
Loading unloading and carrage of 11 Kv 3x185 sq mm XLPE cable from Raja Talab center store to site
Loading unloading and carrage of ST Pole 9/11 Mtr long from Raja Talab center store to site
Erection of Heat Shrinkable Jointing Kit Outdoor for 11 KV 3x185 sq. mm XLPE Cable make rycheme/3M
Erection of Heat Shrinkable Jointing Kit Straight through for 11 KV 3x185 sq. mm XLPE Cable make rycheme/3M
Grouting (1:3:6,1-cement, 3-coarse sand,6-concerate of 20mm Size) of 11 Mtr STP Pole with Muffing(300mm) as per TS
Laying of 110 mm dia. HDPE pipe by Horizontal drilling by HDD method as per site condition, for underground piping (trenchless)
Laying of 11 KV 3Cx185/300 sq.mm XLPE Cable underground through HDPE Pipe at 950 mm below the ground surface. (by HDD method)
Digging of pit and Laying of 11KV cable by Providing of Brick on both side of cable and trench covered with stone slab after filling sand into the trnch/ molling method by providing of HDPE Pipe
Laying of G.I. pipe 4" dia with height of 3 meter with clamps, Nut and Bolts for hoisting of cable.
Painting of ST Pole
Erection of 9Mtr S.T. Double pole structure complete with top channel, bracing angle, dropper angle,insulator,danger board, number board, barbed wire,allu lug, red oxide & allu paint along wth jumper required for hoisting of HT cable
Erection of Earthing of pole by MS earthing rod of 20x2500 mm. and 6 SWG earthing wire etc.
Laying, testing & commissioning of 11 KV 3x185sq mm XLPE cable D/C (2X100Mtr) in HDPE Pipe after supply & laying of d/c HDPE pipe (2x70mtr) of 200 sqmm dai by Horrizontal drilling mathod with drilling machine the pipe shall be leid at the 2.5 mtr deep below railway track.and Sp. Earthing of D/P on Both side as per NORMS Providing 4No.G.I.Pipe of size 4' dia 3 mtr long, suitable clamp & Nut Bolts fixing of all accessories and earthing material etc.
Dismantling of Old Existing line and carriage of dismentalled Pole/Conductor/all other material upto utility Store as per site condition.
Erection of Chemical pipe earthing for Cable J/Kit including cost of GI earth strip of size 25x5mm and connection as rerquired.
C. Shifting of DTR and LT U.G Line
Loading unloading and carrage of 33 Kv 3x300 sq mm XLPE cable from Raja Talab center store to site
Loading unloading and carrage of ST Pole 9/11 Mtr long from Raja Talab center store to site
Erection of Earthing complete for T/F Neutral and L.A. ( pipe earthing) with GI Flat earthing strip as per State Norms.
Painting of ST Pole
Erection of 11Mtr S.T. Double pole structure complete with top channel, bracing angle, dropper angle,insulator,danger board, number board, barbed wire,allu lug, red oxide & allu paint along wth jumper required for installation/shifting of DTR
Dismentling & Shifting of 11/0.44 kV Transformer (Level-II)as per Technical Specification.
Erection and commissioning of New DTR
Erection of LT Aluminium XLPE Cable 1Cx400 Sq.mm.
Erection of LT Aluminium XLPE Cable 1Cx240 Sq.mm
Erection of 6 – way Distribution feeder pillar, TP & N , 3 phase ,415 v , 315 Amps incoming rating type suitable for outdoor installation , in accordance with Technical Specification
Erection of 3-ph 415 V , Distribution Service Piller for LT. 100 Amp Incoming 4 nos 32 Amp, TPN 12 Nos 16 Amp SPN.Rating Feeder Type Distribution Service Piller suitable for Outdoor Installation.
Erection of Outdoor type. MAIN LT PANEL AT SUB STATION- 400 KVA (Type A-1) Incomer- 1 Set of 800 Amp. TP MCCB with Spreader & Extended handle Outgoing- 6 Set of 250 Amp. TP MCCB with Spreader & Extended handle ( 5 Nos. + 1 No. for capacitor panel) - 2 Set of 100 Amp. TP MCCB with Spreader & Extended handle
Erection of LT Distribution box with 01 No I/C MCCB 800 Amp & 04 No O/G MCCB 200Amp with multipal Trip setting
Punching of Aluminum lugs -300 Sq.mm.
Grouting (1:3:6,1-cement, 3-coarse sand,6-concerate of 20mm Size) of 11 Mtr STP Pole with Muffing(300mm) as per TS
Construction of Transformer plinth with fencing suitable for 250/400KVA DTR
3 ½ Core ,240 sqmm. Armoured Al conductor XLPE insulated 1.1 kV grade armoured Power cable as per Technical specification
3 ½ Core ,150 sqmm. Armoured Al conductor XLPE insulated 1.1 kV grade armoured Power cable as per Technical specification.
3 ½ Core ,95 sqmm. Armoured Al conductor XLPE insulated 1.1 kV grade armoured Power cable as per Technical specification.
Erection of Cable gland of suitable size along with all accessories
Erection of Chemical earthing of Outdoor type LT Disribution Boards (A-type)and Distribution feeder pillar Box ( B Type)(80 mm dia,3 M long) using GI Strip
Laying of LT cable by dressing with brick stone and sand in close trench
Digging of pit 700mm from ground level for Laying of LT cable by Providing of Brick on both side of HDPE Pipe and trench covered with stone slab after filling sand into the trench/ molling method by providing of HDPE Pipe
Laying of 110 mm dia. HDPE pipe by Horizontal drilling by HDD method as per site condition, for underground piping (trenchless)
Laying of 160 mm dia. HDPE pipe by Horizontal drilling by HDD method as per site condition, for underground piping (trenchless) for road crossing.
Laying of LT cable of size 3.5*240/150/95 sq.mm XLPE Cable underground through HDPE Pipe below the ground surface.
Plastic Compound for covering the HDPE Pipe at Pit area.
Making of Pit off size 2x1x1.5 meter (100mm PCC slave then making of brick work, RCC cover of Size 200mm with 16 mm Irom bar and concrete M25 trench, 3 mm Thick MS Sheet Around Cover, 20 mm side & Bottom Cover for laying of 33kv/ 11kv and LT under ground cable including cost of all civil material as per drawing) including 06 No of 150 mm dia, 600 mm deep PVC Pipe Fixed to the Bottom Slave For Rain water harvesting Pipe Top to be covered with MS Mesh.
Making of Pit off size 2x1.5x1.5 meter (100mm PCC slave then making of brick work, RCC cover of Size 200mm with 16 mm Irom bar and concrete M25 trench, 3 mm Thick MS Sheet Around Cover, 20 mm side & Bottom Cover for laying of 33kv/ 11kv and LT under ground cable including cost of all civil material as per drawing) including 06 No of 150 mm dia, 600 mm deep PVC Pipe Fixed to the Bottom Slave For Rain water harvesting Pipe Top to be covered with MS Mesh.
Sundries
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_2054290.xls
BOQ • 0.31 MB
Technical27.rar
Tender Documents • 0.09 MB
Download all tender documents and submit your bid