Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC RIVER SIDE BHURKUNDA RAMGARH JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | ₹2.8 L | L1 | Accepted-AOC As per TCR. |
| 2 | L2₹2.8 LRejected-AOC CHITRANGI KHATAI SINGRAULI DISTT SINGRAULI M P 486882 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486882 | ₹2.8 L | L2 | Rejected-AOC As per TCR. |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per NIT. |
| Sl No | Description | Qty | Unit | M/s Sriram Enterprises L2 | M/S DK ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | PART (A) DSM-3 Fabrication of Long bush, Repairing of bearing housing, Fabrication of Impeller (Brass),Repairing of damaged pump body, Cleaning, over-hauling, Greasing with O ring, seal and packing changing, Pump opening and fitting with testing work. | 1 | JOb | 38,500 ₹38,500 | 38,000 ₹38,000 |
| 2.00 | PART (B) DSM-2 Fabrication of Impeller (Brass), Repairing of bearing housing. Repairing of shaft, Repairing of damaged pump body, Fabrication of Long bush (Brass), Cleaning, over- hauling , greasing with O ring, seal and packing changing, Pump opening and fitting with testing work. | 1 | Job | 41,500 ₹41,500 | 42,000 ₹42,000 |
| 3.00 | PART (C) DSM-4 (02 Nos. Pump) Fabrication of shaft as per size Repairing of damaged shaft, Fabrication of Long bush, Fabrication of Impeller first stage & second stage, Making of bearing housing, Making of bush nut, Repairing of damaged pump body, Cleaning, over- hauling , greasing with O ring, seal and packing changing, Pump opening and fitting with testing work. | 2 | Job | 68,500 ₹1.4 L | 67,000 ₹1.3 L |
| 4.00 | Overhead and Expenses | 1 | Job | 21,700 ₹21,700 | 21,400 ₹21,400 |
| 5.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 42,966 ₹42,966 | 42,372 ₹42,372 |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
2 Sept 2025, 9:00 amClosed
Project Engineer EnM Bhurkunda Colliery
Office of project Engineer EnM Bhurkunda Colliery
Repairing or reconditioning of DSM2, DSM3 and DSM4 pump for different workers colony water supply at different colonies under Bhurkunda Project (B-S Area).
2025_CCL_342154_1
PE(EnM)/BHK/e Tender/25-26/23
Open Tender
Electrical and Maintenance Works
30 days
Office of project Engineer EnM Bhurkunda Colliery
Please refer tender documents.
2 documents required · 2 mandatory
₹3,300
16 Mar 2026
22 Aug 2025
3 Sept 2025
23 Aug 2025
2 Sept 2025
23 Aug 2025
23 Aug 2025 - 28 Aug 2025
Amount
PART (A) DSM-3 Fabrication of Long bush, Repairing of bearing housing, Fabrication of Impeller (Brass),Repairing of damaged pump body, Cleaning, over-hauling, Greasing with O ring, seal and packing changing, Pump opening and fitting with testing work.
PART (B) DSM-2 Fabrication of Impeller (Brass), Repairing of bearing housing. Repairing of shaft, Repairing of damaged pump body, Fabrication of Long bush (Brass), Cleaning, over- hauling , greasing with O ring, seal and packing changing, Pump opening and fitting with testing work.
PART (C) DSM-4 (02 Nos. Pump) Fabrication of shaft as per size Repairing of damaged shaft, Fabrication of Long bush, Fabrication of Impeller first stage & second stage, Making of bearing housing, Making of bush nut, Repairing of damaged pump body, Cleaning, over- hauling , greasing with O ring, seal and packing changing, Pump opening and fitting with testing work.
Overhead and Expenses
Total impact of GST for the purpose of CTC
M/s Sriram Enterprises (BID ID -1178814)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid