| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC | ₹4.7 L | 1 | Accepted-AOC accept |
| 2 | 2₹4.8 L+₹12,101 (2.58%)Rejected-Finance | ₹4.8 L+₹12,101 (2.58%) | 2 | Rejected-Finance 2 |
| 3 | 3₹4.9 L+₹26,720 (5.71%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹4.9 L+₹26,720 (5.71%) | 3 | Rejected-Finance 3 |
| 4 | 4₹5.0 L+₹35,540 (7.59%)Rejected-Finance | ₹5.0 L+₹35,540 (7.59%) | 4 | Rejected-Finance 4 |
| 5 | 5₹5.3 L+₹63,432 (13.5%)Rejected-Finance | ₹5.3 L+₹63,432 (13.5%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/s Virendra Singh Contractor L2 | ARTIST BRO L3 | M/S FAIR CONSTRUCTION L1 | Dhirendra Singh Sirohi L7 | M/S RINKU CONTRACTOR L4 | SIYA INFRATECH L6 | M/S HARSH CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 169 | Cum | 68 ₹11,492 | 80 ₹13,520 | 30 ₹5,070 Lowest | 45 ₹7,605 | 80 ₹13,520 | 100 ₹16,900 | 73.8 ₹12,472.2 |
| 2.00 | Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 20 | Cum | 3,900 ₹78,000 Lowest | 4,000 ₹80,000 | 4,000 ₹80,000 | 5,125 ₹1,02,500 | 5,000 ₹1,00,000 | 4,500 ₹90,000 | 4,428 ₹88,560 |
| 3.00 | Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 89 | Cum | 3,800 ₹3,38,200 Lowest | 4,000 ₹3,56,000 | 3,800 ₹3,38,200 Lowest | 5,325 ₹4,73,925 | 3,900 ₹3,47,100 | 5,000 ₹4,45,000 | 4,206.6 ₹3,74,387.4 |
| 4.00 | 12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 92 | Sqm | 130 ₹11,960 | 125 ₹11,500 | 80 ₹7,360 Lowest | 172 ₹15,824 | 130 ₹11,960 | 150 ₹13,800 | 147.6 ₹13,579.2 |
| 5.00 | C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 2 | Cum | 5,000 ₹10,000 Lowest | 5,500 ₹11,000 | 5,900 ₹11,800 | 6,852 ₹13,704 | 7,000 ₹14,000 | 6,000 ₹12,000 | 5,461.2 ₹10,922.4 |
| 6.00 | Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 287 | Cum | 107 ₹30,709 | 80 ₹22,960 | 90 ₹25,830 | 116 ₹33,292 | 60 ₹17,220 Lowest | 80 ₹22,960 | 110.7 ₹31,770.9 |
Tender Value
₹7.2 L
EMD Value
₹15,000
Closing Date
7 Jan 2026, 12:00 pmClosed
Executive Engineer
U.M.B.D.G.C.KHURJA
Construction of Retaining Wall
2025_UPIDC_1103145_9
13/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹15,000
16 Apr 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
M/s Virendra Singh Contractor (BID ID -5787125)
ARTIST BRO (BID ID -5791303)
M/S RINKU CONTRACTOR (BID ID -5789849)
M/S HARSH CONSTRUCTIONS (BID ID -5792496)
SIYA INFRATECH (BID ID -5792497)
Dhirendra Singh Sirohi (BID ID -5792512)
stage.html
html • 0.06 MB
technical_2034314.pdf
techsummary_2034314.pdf
finance_2034314.pdf
BOQ Comparative Chart
xlsx
finsummary_2034314.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2034314.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .