| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.0 LAccepted-AOC | L1 | Accepted-AOC Agreement executed by L1 | |
| 2 | L2₹81.0 L+₹97,784.67 (1.22%)Rejected-AOC | L2 | Rejected-AOC Agreement executed by L1 | |
| 3 | L3₹87.0 L+₹7.0 L (8.76%)Rejected-Finance | L3 | Rejected-Finance L1 L2 admitted | |
| 4 | L4₹91.6 L+₹11.7 L (14.6%)Rejected-Finance | L4 | Rejected-Finance L1 L2 admitted | |
| 5 | L5₹92.5 L+₹12.5 L (15.7%)Rejected-Finance | L5 | Rejected-Finance L1 L2 admitted |
| Sl No | Description | Qty | Unit | Varghese.K.T L3 | k v john L4 | MOHAMMED KAYANIKKARA L5 | ME SHUHAIB L6 | V ABDUL AZEEZ L7 | ARDEN INFRATECH PRIVATE LIMITED L2 | MUHAMMED ABDURAHIMAN PM L9 | AHAMMED IRSHAD L1 | ALMANAC ENGINEERING CONSULTANCY LLP L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Rehabilitation work | ||||||||||||
| 1.00 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 0.24 | cum | 1,426.14 ₹342.27 | 1,502.28 ₹360.55 | 1,516.86 ₹364.05 | 2,516.86 ₹604.05 | 1,800 ₹432 | 1,326 ₹318.24 | 1,580 ₹379.2 | 1,311.21 ₹314.69 Lowest | 1,575 ₹378 |
| 1.00 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | 0.02 | Hectare | 1,59,033.75 ₹2,544.54 | 1,67,523.79 ₹2,680.38 | 1,69,150.24 ₹2,706.4 | 1,69,150.24 ₹2,706.4 | 1,80,000 ₹2,880 | 1,48,006 ₹2,368.1 | 1,76,000 ₹2,816 | 1,46,217.37 ₹2,339.48 Lowest | 1,75,656 ₹2,810.5 |
| 1.00 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. | 43.44 | cum | 48.53 ₹2,108.24 | 51.12 ₹2,220.76 | 51.62 ₹2,242.48 | 51.62 ₹2,242.48 | 75 ₹3,258.15 | 45.16 ₹1,961.84 | 55 ₹2,389.31 | 44.62 ₹1,938.38 Lowest | 54 ₹2,345.87 |
| 1.00 | OD263608/2025-2026:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18- 836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights | 30 | no | 210.14 ₹6,304.2 | 221.36 ₹6,640.8 | 223.51 ₹6,705.3 | 223.51 ₹6,705.3 | 300 ₹9,000 | 195 ₹5,850 | 250 ₹7,500 | 193.2 ₹5,796 Lowest | 235 ₹7,050 |
| 1.00 | OD263606/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 197.38 | sqm | 448.27 ₹88,480.43 | 472.2 ₹93,203.78 | 476.79 ₹94,109.76 | 476.79 ₹94,109.76 | 500 ₹98,691 | 416 ₹82,110.91 | 500 ₹98,691 | 412.15 ₹81,350.99 Lowest | 495 ₹97,704.09 |
| 1.01 | OD263609/2025-2026:Polymer Modified Mortar (Pre -Packed):Providing and Applying single component,High strength,Fiber reinforced,thixotropic cementitous patch repair moratar that achieve compressive strengthminimum 15 Mpa at 1 day and 45Mpa at 28 days and capable of applaying up to 50mm thick in single layer such as rendroc SP40 of fosroc or Master Emaco S348 of Basf or equilent to the prepared concrete area for thickness up to 50mm after applying apoxy resin based bonding coat as per manufacture 's specification befor the bonding agent become tack free ,initially by hand and finaly finishing the same with trowel care fully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns ,slab,beam etc,at all heights ,where the thickness of application is less than 50mm in patches as per specification .Item rate is inclusive of all materials including the bond coat , labour , tools ,temperory supports for structures, electricity,Plant and machineries,curing etc.Complete and directed by Engineer in charge and/or consultant .(Payment to be made in square meter for thickness up to 50mm of PMM for patch area repaired) | 217.65 | sqm | 4,191.34 ₹9,12,245.15 | 4,415.1 ₹9,60,946.52 | 4,457.96 ₹9,70,274.99 | 4,457.96 ₹9,70,274.99 | 4,500 ₹9,79,425 | 3,900 ₹8,48,835 | 4,650 ₹10,12,072.5 | 3,853.56 ₹8,38,727.33 Lowest | 4,600 ₹10,01,190 |
| 1.01 | OD263612/2025-2026:New/Additional steel Reinforcement:
Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional
steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing
with old existing reinforcement which was reduced to 15 % or more of its original diameter as
required as provided in original structure and additional steels as directed by EIC and/ or
consultant as required tying with 16 gauge annealed binding wire complete as per drawing and
specifications for all heights including all material, labour, tools, temporary supports for
structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required) | 309.26 | kg | 68.1 ₹21,060.61 | 71.74 ₹22,186.31 | 72.44 ₹22,402.79 | 72.44 ₹22,402.79 | 88 ₹27,214.88 | 63 ₹19,483.38 | 80 ₹24,740.8 | 62.62 ₹19,365.86 Lowest | 75 ₹23,194.5 |
| 1.01 | OD263607/2025-2026:Rust remover/Rust Convertor:
Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid
based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust
converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted
metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries complete as per detail
specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface
area containing the cleaned rebars shall be measured for payment. | 146.16 | sqm | 320.37 ₹46,824.96 | 337.47 ₹49,324.28 | 340.75 ₹49,803.68 | 340.75 ₹49,803.68 | 400 ₹58,463.6 | 298 ₹43,555.38 | 360 ₹52,617.24 | 294.55 ₹43,051.13 Lowest | 355 ₹51,886.45 |
| 1.01 | OD263610/2025-2026:Anti Corrosive treatment to Steel:
Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two component
inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having
specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40
microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as
per manufacturer?s specification in two coats at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries, necessary surface
preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement.Data as per approved data of Rehabilitation of Kalluthankadvu bridge. | 146.16 | sqm | 710.07 ₹1,03,783.12 | 747.98 ₹1,09,324.01 | 755.24 ₹1,10,385.12 | 755.24 ₹1,10,385.12 | 750 ₹1,09,619.25 | 660 ₹96,464.94 | 790 ₹1,15,465.61 | 652.84 ₹95,418.44 Lowest | 785 ₹1,14,734.82 |
Tender Value
₹89.0 L
EMD Value
₹50,000
Closing Date
29 Jul 2026, 11:00 amClosed
Superintending Engineer,PWD Bridges,North Circle
Office of the Superintending Engineer, PWD Bridges, North Circle, Thondayad, Kozhikode 673017
General-Rehabilitation work of Kuniyilkadavu bridge and Kanayankode bridge in Koyilandi LAC at Kozhikode District-General Civil work
2026_PWD_860851_1
PWD/BR/TR/23983/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Kuniyilkadavu and Kanayankode in Koyilandi LAC
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
20 Aug 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rehabilitation work | |||||
| 1.001 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | - | cum | - | - |
| 1.002 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | - | Hectare | - | - |
| 1.003 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. | - | cum | - | - |
| 1.004 | OD263608/2025-2026:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18- 836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights | - | no | - | - |
| 1.005 | OD263606/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 0.8 | sqm | - | - |
| 1.006 | OD263609/2025-2026:Polymer Modified Mortar (Pre -Packed):Providing and Applying single component,High strength,Fiber reinforced,thixotropic cementitous patch repair moratar that achieve compressive strengthminimum 15 Mpa at 1 day and 45Mpa at 28 days and capable of applaying up to 50mm thick in single layer such as rendroc SP40 of fosroc or Master Emaco S348 of Basf or equilent to the prepared concrete area for thickness up to 50mm after applying apoxy resin based bonding coat as per manufacture 's specification befor the bonding agent become tack free ,initially by hand and finaly finishing the same with trowel care fully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns ,slab,beam etc,at all heights ,where the thickness of application is less than 50mm in patches as per specification .Item rate is inclusive of all materials including the bond coat , labour , tools ,temperory supports for structures, electricity,Plant and machineries,curing etc.Complete and directed by Engineer in charge and/or consultant .(Payment to be made in square meter for thickness up to 50mm of PMM for patch area repaired) | - | sqm | - | - |
| 1.007 | OD263612/2025-2026:New/Additional steel Reinforcement:
Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional
steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing
with old existing reinforcement which was reduced to 15 % or more of its original diameter as
required as provided in original structure and additional steels as directed by EIC and/ or
consultant as required tying with 16 gauge annealed binding wire complete as per drawing and
specifications for all heights including all material, labour, tools, temporary supports for
structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required) | 1 | kg | - | - |
| 1.008 | OD263607/2025-2026:Rust remover/Rust Convertor:
Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid
based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust
converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted
metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries complete as per detail
specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface
area containing the cleaned rebars shall be measured for payment. | 0.6 | sqm | - | - |
| 1.009 | OD263610/2025-2026:Anti Corrosive treatment to Steel:
Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two component
inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having
specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40
microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as
per manufacturer?s specification in two coats at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries, necessary surface
preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement.Data as per approved data of Rehabilitation of Kalluthankadvu bridge. | 0.6 | sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1455779.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1455779.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .