Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-I₹92.2 LAccepted-AOC | L-I | Accepted-AOC Contract award to the L-I party | |
| 2 | L-II₹1.2 CrRejected-Finance 612 DIWAN ESTATE AMBEDKAR GALI HARSH VIHAR EAST DELHI DELHI 110093 | NORTH EAST DELHI | DELHI | 110093 | L-II | Rejected-Finance Bid rejected due to L-II (MOM enclosed) |
Tender Value
₹1.2 Cr
EMD Value
₹1 L
Closing Date
20 Jun 2022, 2:30 pmClosed
DGM (M and C)
Technical Building Gohana Road NFL Panipat
ARC of Operation and Maintenance of Air conditioning Units Part I and II for the year 2022 24
2022_NFL_117420_1
NFP/MPC/47(02)/2022-24
Limited
Air-Conditioner
Works
730 days
NFL Panipat Unit
Only for PQ parties
5 documents required · 5 mandatory
₹1,000
Payable To National Fertilizers Limited
₹1 L
15 Sept 2022
28 May 2022
21 Jun 2022
29 May 2022
20 Jun 2022
30 May 2022
30 May 2022 - 20 Jun 2022
Amount
Part-I-Central Air Conditioning Units
A.0-Operation & Maintenance of Central AC and Package AC Plants
A.0.1-Operation & Maintenance of AC Plant of Ammonia Plant (Old) Offices.
A.0.2- Operation & Maintenance of AC Plant of Ammonia UPS- I
A.0.3- Operation & Maintenance of AC Plant of CPP Control Room
A.0.4- Operation & Maintenance of AC Plant of ESP Control Room
A.0.5- Operation & Maintenance of AC Plant of CPP Lab & Offices –I
A.0.6- Operation & Maintenance of AC Plant of CPP Lab & Offices –II
A.0.7- Operation & Maintenance of AC Plant of SGP Control Room
A.0.8- Operation & Maintenance of AC Plant of VFD Control Room
A.0.9- Operation & Maintenance of AC Plant of Urea Control Room
A.0.10- Operation & Maintenance of Air Cooled Split AC Plant of MRS capacity 11TR
A.0.11-Operation & Maintenance of HVAC system of GTG plant
A.1- Operation & Routine Maintenance of Screw Chiller Unit of Ammonia Feed Change Over Project
Water Cooled Screw Chiller Unit capacity 259 TR , set of 3nos Chiller (2no Working+ one no. Standby ) with each unit of capacity 129.5 TR capacity having AHU of 55000 CFM (one Working +one Standby) for Electrical Sub station and AHU of Capacity of 61000CFM ( one working & one Stand by for control room)
A.1.1- Opertion & Routine Maintenance of above unit.
A.2- Operation & Routine Maint. of Flame Proof Package AC Units of Analyzer Shelter of AFC Project
A.2.1-Operation & Maintenance of 1 Set of Flame Proof Package HVAC System for Analyzer Shelters of AFC Project (1 Set = 2x3TR + 1x5 TR)
A.2.2- Operation & Routine Maintenance of Flame Proof Package AC cap. 1.0 TR of Panel Cooler
A.3- Repair / Overhauling of Compressors
A.3.1- Complete overhauling of Frick F-303 compressor as per scope of work
A.3.2- Complete overhauling of Kirloskar AC-770 compressor as per scope of work
A.3.3-Supply and Complete Replacement of Kirloskar Copland 5552-F compressor.
A.3.4- Supply and Complete Replacement of Emerson, ZB95 Scroll Hermetically sealed Flame Proof Compressor of capacity 5.0 TR.
A.3.5- Supply and Complete Replacement of Emerson, ZB95 Scroll Hermetically sealed Flame Proof Compressor of capacity 3.0 TR.
A.4- Supply & charging of refrigerant for Water Cooled Screw Chiller Unit & Flame Proof Package HVAC Units for Analyzers Shelter and IGGU Compressor of AFC Project
A.4.1- Supply & charging of refrigerant R-134a
A.5-Operation & Routine Maint. of Flame Proof Package AC Units of Analyzer Shelter of GTG Plant
A.5.1- Operation & Maintenance of Flame Proof Package HVAC System for Analyzer Shelters of GTG Plant (3 X 3.0 TR)
PART-II-Air Conditioners, Water Coolers, Water purifiers, Deep Freezers and Refrigerators
B.0- Servicing of Air Conditioners, Water Coolers, Water purifiers, Deep Freezers and Refrigerators
B.0.1- Window A. C. Unit Capacity 1.5 TR (21 Nos.for 24 months, 169 Nos for 16 months)
B.0.2- Flame Proof Window A. C. Unit Capacity 1.5 TR (3 Nos. for 16 months) installed in AFC Project
B.0.3- Window A. C. Unit Capacity 2.0 TR ( 1 Nos. for 24 months & 7 nos. for 16 months)
B.0.4- Split AC 1.5 TR capacity (25 Nos for 24 months, 80 Nos for 16 months )
B.0.5- Split AC 2.0 TR capacity (14 Nos. for 24 months, 25 Nos. for 16 months)
B.0.6- Water Coolers (40 nos. for 16 months)
B.0.7-Deep Freezers of any make & capacity - 5 nos for 24 months)
B.0.8- Refrigerator of any make & capacity - 24 nos for 24 months)
B.0.9- Water purifier (11 Nos for 24 Months)
B.1- Replacement Charges of Air conditioners/Water Coolers/Deep Freezers/Refrigerators/Water purifiers
B.1.1- Window AC 1.5 TR capacity
Replacement charges
B.1.2- Split AC 1.5/2.0 TR capacity
Replacement charges
B.1.3-Water Cooler / Deep Freezers
Replacement charges
B.1.4- Refrigerator
Replacement charges
B.1.5- Water purifier
Replacement charges
Kumar Air Conditioning Engineers
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .