Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹1.9 L+₹6,415.07 (3.43%)Rejected-AOC | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | MUHAMMADALI K L2 | MUHAMMED RISHAB L1 |
|---|---|---|---|---|---|
| 1.00park renovation | |||||
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 852 | kg | 185 ₹1,57,620 | 178.42 ₹1,52,013.84 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.59 | cum | 9,999 ₹15,928.41 | 9,963.93 ₹15,872.54 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 21.24 | sqm | 400 ₹8,496 | 386.16 ₹8,202.04 Lowest |
| 1.00 | 13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture . | 46 | sqm | 250 ₹11,500 | 240.02 ₹11,040.92 Lowest |
Tender Value
₹1.9 L
EMD Value
₹4,678
Closing Date
18 Mar 2026, 3:00 pmClosed
REENA.V
Office of the Assistant Engineer,LID EW SECTION KARAKURUSSI GP
ET-10- Annual Plan-Karakurussi gp 2025-26 pro.no-175/25-26 -GLPS PULLUVAYILKUNNU PARK RENOVATION
2026_LSGD_845898_9
05/25-26/AE/LSGD/KKSY
Open Tender
Civil Works - Others
Item Rate
240 days
Karakurussi gp
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹4,678
Yes
25 May 2026
10 Mar 2026
21 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
park renovation
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429117.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1429117.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.80 MB
viewnit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .