Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAccepted-AOC 20 2169 PALLURTH PO ERNAKULUM KERALA 682006 | ERNAKULAM | KERALA | 682006 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹29.7 L+₹56,760 (1.95%)Rejected-Finance DOOR NO 3 79 CHENNNADGRAMAPANCHAYAT PERUMBALA KASARAGOD 681317 | PERUMBALA | KASARAGOD | KERALA | 681317 | L2 | Rejected-Finance L1 Being accepted | |
| 3 | L3₹33 L+₹3.9 L (13.5%)Rejected-Finance EDALAKADU THABORE P O MOOKANNOOR ERNAKULAM DIST KERALA 683 577 | MOOKANNOOR | ERNAKULAM | KERALA | 683577 | L3 | Rejected-Finance L1 Being accepted |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
19 Mar 2020, 6:00 pmClosed
GE(I)(CG)KOCHI
GE(I)(CG)KOCHI BUILDING NO.22/2614, OPP. SANTHOM CHURCH MUNDAMVELI POST RAMESWARAM KOCHI-682 507
OUTSOURCING OF EM INSTALLATIONS AT ICGS BEYPORE AND CGRA KOZHIKODE UNDER GE I CG KOCHI
2020_MES_326635_1
GE/CG/8698
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
BEYPORE
AS PER NIT/TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(I)(CG)KOCHI
₹72,000
Yes
27 Apr 2020
19 Feb 2020
21 Mar 2020
19 Feb 2020
19 Mar 2020
5 Mar 2020
19 Feb 2020 - 25 Feb 2020
Amount
Manning and operation of following E/M installattions (Power House/DG set) at ICGS Beypore in three shifts of 08 Hours including sunday and holidays by employing man power as given below for the entire system including attending telephonic complaints, maintain necessary records and documents as per standard practices including carrying out periodical maintenance of installation and day to day maintenance complete all as specified and directed:- Details of Installations (Power house) (i) Tranformer 160 KVA - 01 No (ii) Metering Unit - 01 No (iii) RMU - 01 No (iv) APFC Panel - 01 No (v) LT panels including incomming/outgoing complete (vi) DG set 50 KVA - 01 No (vii) DG set 62.5 KVA - 01 No (viii) DG set 125 KVA - 01 No (ix) Change over switch (x) Street Light/Security light complete area. Shift Timings Shift I : 0600 Hrs to 1400 Hrs (01 Electrican) Shift II : 1400 Hrs to 2200 Hrs (01 Electrican) Shift III : 2200 Hrs to 0600 Hrs (01 Electrican) Three (02) Electrician per day(01 No Electrican in each shift) as above shall be deployed. Accordingly the duty roaster to be submitted by the contractor before commencement of month. Note : The rate quoted shall be for One Electrician per each shift and shall be inclusive for attending all complaints of internal/external electrification and water supply break down including liaison with KSEB and KWA to restore supply in case of break down/failure of supply.
Manning and operation of following E/M installattions (Power House/DG set) for CGRA Kozhikode in three shifts of 08 Hours including sunday and holidays by employing man power as given below for the entire system including attending telephonic complaints, maintain necessary records and documents as per standard practices including carrying out periodical maintenance of installation and day to day maintenance complete all as specified and directed:- Details of Installations (Power house) (i) Tranformer 160 KVA - 01 No (ii) VCB -01 No (iii) RMU - 01 No (iv) APFC Panel - 01 No (v) LT panels including incomming/outgoing complete (vi) DG set 50 KVA - 01 No (vii) Change over switch (viii) Metering Unit - 01 No (ix) Street Light/Security light complete area. Shift Timings Shift I : 0600 Hrs to 1400 Hrs (01 Electrican) Shift II : 1400 Hrs to 2200 Hrs (01 Electrican) Shift III : 2200 Hrs to 0600 Hrs (01 Electrican) Three (03) Electrician per day(01 No Electrican in each shift) as above shall be deployed. Accordingly the duty roaster to be submitted by the contractor before commencement of month. Note: The rate quoted shall be for One Electrician per each shift and shall be inclusive for attending all complaints of internal/external electrification and water supply break down including liaison with KSEB and KWA to restore supply in case of break down/failure of supply.
Manning and operation of following E/M installattions (Pump House/Fire Fighting System) for ICGS Beypore in three shifts of 08 Hours including sunday and holidays by employing man power as given below for the entire system including attending telephonic complaints, maintain necessary records and documents as per standard practices including carrying out periodical maintenance of installation and day to day maintenance complete all as specified and directed:- Details of Installations (Pump House) (i) Submersible pump -02 Nos (ii) Electric Pump -03 No (iii) DOL/Star Delta Starters for Pump set including LT Panels (iv) Centrifugal pump set -01 No (v) Monoblock pump set -02 Nos (vi) Compressure pump - 01 No (vii) Chlorine/Altoch Dosing System Shift Timings Shift I : 0600 Hrs to 1400 Hrs (01 FGM) Shift II : 1400 Hrs to 2200 Hrs (01 FGM) Shift II : 2200 Hrs to 0600 Hrs (01 FGM) Three (03) FGM per day(01 No FGM in each shift) as above shall be deployed. Accordingly the duty roaster to be submitted by the contractor before commencement of month. Note: The rate quoted shall be for 01 No FGM in each shift and shall be inclusive for attending all complaints including liaison with KWA to restore supply in case of break down/failure of supply.
Manning and operation of following E/M installattions (Pump House/Fire Fighting System) for CGRA Kozhikode in three shifts of 08 Hours including sunday and holidays by employing man power as given below for the entire system including attending telephonic complaints, maintain necessary records and documents as per standard practices including carrying out periodical maintenance of installation and day to day maintenance complete all as specified and directed:- Details of Installations (Pump House) (i) Fire pump - 02 Nos (ii) Electric Pump -04 No (iii) Jockey pump -01 No (vi) Altoch Dosing System (vii) Fire Hydrants including complete system of fire fighting (viii) DOL/Star Delta Starters for Pump set including LT panels Shift Timings Shift I : 0600 Hrs to 1400 Hrs (01 FGM) Shift II : 1400 Hrs to 2200 Hrs (01 FGM) Shift III : 2200 Hrs to 0600 Hrs (01 FGM) Three (03) FGM per day(01 No FGM in each shift) as above shall be deployed. Accordingly the duty roaster to be submitted by the contractor before commencement of month. Note: The rate quoted shall be for One FGM per each shift and shall be inclusive for attending all complaints including liaison with KWA to restore supply in case of break down/failure of supply.
Manning and operation of following E/M installattions (Pump House/Fire Fighting System) for CGRA Kozhikode in one shift of 08 Hours including sunday and holidays by employing man power as given below for the entire system including attending telephonic complaints, maintain necessary records and documents as per standard practices including carrying out periodical maintenance of installation and day to day maintenance complete all as specified and directed:- Details of Installations (Pump House) (i) Fire pump - 02 Nos (ii) Electric Pump -04 No (iii) Jockey pump -01 No (vi) Altoch Dosing System (vii) Fire Hydrants including complete system of fire fighting (viii) DOL/Star Delta Starters for Pump set including LT panels Shift Timing Shift : 0600 Hrs to 1400 Hrs (01 Valveman) 01 No. Valveman per day as above shall be deployed. Accordingly the duty roaster to be submitted by the contractor before commencement of month. Note: The rate quoted shall be for One Valveman per each shift and shall be inclusive for attending all complaints including liaison with KWA to restore supply in case of break down/failure of supply.
Manning and operation of following E/M installattions (Pump House/Fire Fighting System) for ICGS Beypore in one shift of 08 Hours including sunday and holidays by employing man power as given below for the entire system including attending telephonic complaints, maintain necessary records and documents as per standard practices including carrying out periodical maintenance of installation and day to day maintenance complete all as specified and directed:- Details of Installations (Pump House) (i) Submersible pump - 02 Nos (ii) Electric Pump -03 Nos (iii) DOL/Star Delta Starters for Pump set including LT panels (iv) Centifugal pump set - 01 No (v) Mono block pump set- 02 Nos (vi) Compressure pump - 01 No (vii) Chlorine/Altoc Dosing system Shift Timing Shift : 0600 Hrs to 1400 Hrs (01 Valveman) 01 No. Valveman per day as above shall be deployed. Accordingly the duty roaster to be submitted by the contractor before commencement of month. Note: The rate quoted shall be for One Valveman per each shift and shall be inclusive for attending all complaints including liaison with KWA to restore supply in case of break down/failure of supply.
KDR CONSTRUCTION
Sreema Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .