Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹1,020.38 (0.21%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹5 L
EMD Value
₹50,000
Closing Date
18 Oct 2022, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECTIVE ENGINEER IRRIGATION DEPARTMENT IN UP
EXECTIVE ENGINEER SHARSA SAHAYAK KHAND-32 AZAMGARH (UP)
Construction of VRB
2022_UPIDC_734550_29
02/EE/2022-23/C551
Open Tender
Civil Works
Item Rate
180 days
AZMGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹50,000
Yes
18 Nov 2022
13 Oct 2022
18 Oct 2022
13 Oct 2022
18 Oct 2022
13 Oct 2022
Amount
(a) Earth work in digging foundation all type soil including all lead and lift proper disposal and back filling ,labour and T&P etc.
Laying Plain Cement Concrete (1 : 3 : 6) with crushed aggregate and coarse sand including all cost of materials , labour and T&P etc. Mechanical mixing
(a) First class brick work in 1:4 cement and coarse sand mortar up to 3M lift and 60M lead of materials with including all cost of materials, scafolding, labour and T&P etc.
Cement Pointing (Struck deep) 1:2 Cement and coarse sand mortar on brick masonry including all cost of materials, scafolding, labour and T&P etc.
Laying Reinforcement Cement Concrete (1 : 1.5 : 3) with coarse sand and crushed aggregate including all cost of materials, labour and T&P etc. Mechanical mixing
Laying C.C. (1 : 1.5 : 3) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.
CENTERING & SHUTTERING:- (a) Centering & Shuttering for R.C.C. work - For Bridge Slabs upto 3M span including all cost of materials , fixing , removing , lobour and T&P etc.
(b) Shuttering for C.C. blocks and concrete including all cost of materials , labour and T&P etc.
Providing and fixing of Joint Filler Board with cost of all materials, labour and T&P etc.
Providing and fixing of Spout Drainage Pipe including all cost of materials, labour and T&P etc.
Laying , cutting , bending and binding with binding wire excluding shuttering and centering, but including all materials, labour and T&P etc.
Making and maintaining of store cum. site office.
Fixing Wheel Guard
Brick on edge Soling over ramp
S/F Sign board during construction of work
E/W in making road diversion for vrb construction including all lead , lift propper disposal and labours t&p etc
Painting work parapet with water proofing cement paint with supreme quality as supper snowcem etc including all cost of amterials labour and T&P etc
RAMNAYAN SINGH CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .