Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.9 LAccepted-AOC GROUND 1 9 670 65 ADIKMET SRT COLONY VIDYANAGAR HYDERABAD 500044 | HYDERABAD | TELANGANA | 500044 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹46.0 L+₹2.1 L (4.67%)Rejected-Finance A 99 SECTOR 4 AIROLI NAVI MUMBAI 400708 | NAVI MUMBAI | THANE | MAHARASHTRA | 400708 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹49.6 L+₹5.7 L (13.0%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹53.1 L+₹9.2 L (20.9%)Rejected-Finance 77 DR ZAKIR HUSAIN WARD NEAR GAZI MASJID NAI BASTI GOHALPUR JABALPUR NAI BASTI GOHALPUR JABALPUR MADHYA PRADESH 482002 | JABALPUR | MADHYA PRADESH | 482002 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹54.6 L+₹10.7 L (24.3%)Rejected-Finance 20 21 ETA HOUSE RAZAK GARDEN MAIN ROAD RAZAK GARDEN MAIN ROAD CHENNAI TAMIL NADU 600106 | CHENNAI | TAMIL NADU | 600106 | L5 | Rejected-Finance Being L5 |
Tender Value
Refer Docs
Closing Date
14 Aug 2021, 6:00 pmClosed
Harbhajan singh, Jt.GM(E-E)
O/o. Jt. GM(E-E)/AAI/Engineering Electrical Office, Begumpet Airport, Hyderabad.
ARMO of E and M Installations at Begumpet Airport Hyderabad for the year 2021-2024 SH- Comprehensive Maintenance Contract of Split/Window /VRF/Ductable type AC Units, Water Coolers and Purifiers etc (03 Years Contract)
2021_AAI_83627_1
AAI/HYD/ENGG(E)/ 2021-22/NIT-02
Open Tender
Electrical Works
Item Rate
1095 days
Begumpet Airport, hyderabad
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,180
Exempted
23 Sept 2021
4 Aug 2021
16 Aug 2021
5 Aug 2021
14 Aug 2021
5 Aug 2021
5 Aug 2021 - 10 Aug 2021
Amount
Comprehensive Maintenance contract of following type and capacity of Air conditioners of various make installed different location at Begumpet Airport, Hyderabad, including repairs and maintenance, supply of all spares & Consumable, providing trained service personals as per Special condition of contract and instruction of the Engineer-In-Charge. a). 1.0/1.5/2.0 Ton Window / Split/Cassette type Air conditioners.
I Year
II Year
III Year
Comprehensive Maintenance contract of following type and capacity of Air conditioners of various make installed different location at Begumpet Airport, Hyderabad, including repairs and maintenance, supply of all spares & Consumable, providing trained service personals as per Special condition of contract and instruction of the Engineer-In-Charge. b). 3.0/3.5 Ton 3 Phase Split/Casswete type Air conditioners
I Year
II Year
III Year
Comprehensive Maintenance contract of following type and capacity of Air conditioners of various make installed different location at Begumpet Airport, Hyderabad, including repairs and maintenance, supply of all spares & Consumable, providing trained service personals as per Special condition of contract and instruction of the Engineer-In-Charge. c) 5.5 Ton 3 Phase Ductable Split Air conditioners
I Year
II Year
III Year
Comprehensive Maintenance contract of following type and capacity of Air conditioners of various make installed different location at Begumpet Airport, Hyderabad, including repairs and maintenance, supply of all spares & Consumable, providing trained service personals as per Special condition of contract and instruction of the Engineer-In-Charge. d) 8.5 Ton 3 Phase Ductable Split Air conditioners
I Year
II Year
III Year
Comprehensive Maintenance contract of following type and capacity of Air conditioners of various make installed different location at Begumpet Airport, Hyderabad, including repairs and maintenance, supply of all spares & Consumable, providing trained service personals as per Special condition of contract and instruction of the Engineer-In-Charge. e). 22.0 TR (3 Phase) Ductuble Air conditioners
I Year
II Year
III Year
Comprehensive Maintenance DX 15850 CFM Air-Conditioning System of ZECO AIRCON IND make including and providing all necessary consumables and spares. Location: Tower Simulator NTR Ground Floor)
I Year ( After DLP w.e.f 29.01.22 )
II Year
III Year
Comprehensive Maintenance DX 17200 CFM Air-Conditioning System of ZECO AIRCON IND make including and providing all necessary consumables and spares. Location: Calibration Lab Beside 200TR AC plant).
I Year ( After DLP w.e.f 29.01.2022 )
II Year
III Year
Comprehensive Maintenance VRF Air-Conditioning System of BLUE STAR make consisting of 14 HP outdoor unit with top discharge, 03 numbers of 4.0 TR ductable indoor and providing all necessary consumables and spares. (Location: Simulater Lab.)
I Year ( After DLP w.e.f 29.01.2022 )
II Year
III Year
Comprehensive Maintenance VRF Air-Conditioning System of LG make consisting of 30HP (14 HP + 16 HP) outdoor unit with 08 numbers of 3.2 TR and 03 numbers of 1.65 TR Cassette type indoor and providing all necessary consumables and spares. (Location: ELPA Lab.)
I Year
II Year
III Year
Comprehensive Maintenance 3.0 TR Ductable Air-Conditioning Unit of BLUE STAR make and providing all necessary consumables and spares. (Location: Simulater Lab.)
I Year ( After DLP w.e.f 29.01.2022 )
II Year
III Year
Comprehensive maintenance of water cooler cum purifiers of various makes of purification capacity 50 LHP an storage capacity 80 Liters installed at different locations including providing all necessary consumables including sedimentation filters and carbon filters and spares etc complete as required as per special conditions.
I Year
II Year
III Year
Comprehensive maintenance of water coolers of various make installed at different locations including providing all necessary consumables and spares etc complete as required as per special conditions. A). 50 Liters
I Year
II Year
III Year
Comprehensive maintenance of water coolers of various make installed at different locations including providing all necessary consumables and spares etc complete as required as per special conditions. b). 20/25 Liters
I st Year
II nd Year
III rd Year
Comprehensive maintenance water purifiers of various makes of following purification capacity installed at different locations including providing all necessary consumables including sedimentation filters and carbon filters and spares etc as required as per special conditions. a). 50 LPH
I st Year
II nd Year
III rd Year
Comprehensive maintenance water purifiers of various makes of following purification capacity installed at different locations including providing all necessary consumables including sedimentation filters and carbon filters and spares etc as required as per special conditions. b) 20/25 LPH
I st Year
II nd Year
III rd Year
Dismantling of 1.0/1.5/2.0/3.0/3.5 Ton Window / Split/Cassette type Air Conditioning units including wood frame work, civil work etc as required.
Re Installation and Commissioning of 1.0/1.5/2.0 Ton Window / Split/Cassette type Air Conditioning units including Gas Charging, wood frame work, civil work etc as required.
Supply and Installation of copper pipe for suction and delivery line with all accessories suitable for 1-phase, 1.0TR/1.5TR Split AC's i/c Insulation, power & Control cabling etc. as required.
Supply and Installation of copper pipe for suction and delivery line with all accessories suitable for 1-phase, 2.0TR Split AC's i/c Insulation, power & Control cabling etc. as required.
Supply and Installation of copper pipe for suction and delivery line with all accessories suitable for 3.0/3.5 Ton 3 Phase Split / Cassette Air conditioners i/c Insulation, power & Control cabling etc. as required.
Supply of following spares for RO based water purifiers of various makes as and when required as per the requirement and as per recommendation of OEM and special conditions.
Membrane set for 20/25/50LPH water purrifier (size 10/20 inch as per OEM)
Pump Motors for 25 LPH (24VDC)
Pump Motors for 50 LPH (48VDC)
Adopter for 25 LPH (24VDC)
Adopter for 50 LPH (SMPS)
Jumbo Filters ( sedimentation filter candle) with Housing for 50 LPH Water Purifier
Jumbo Filters ( sedimentation filter candle) for 50 LPH Water Purifier.
Solnet valve for 25/50 LPH Water Purifier.
Aqua Cool Co.Pvt Ltd
GENIUS AIRCON PRIVATE LIMITED
ROSHAN REFRIGERATION AND ELECTRICALS
ETA Engineering Pvt Ltd
Sayee Engineering Company
Zamzam Refrigeration and airconditioning
BLUESTAR LTD
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .