Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC SH SONAM WANGDUS A 39 S O ISHEY LUNDUP R O SKIDYANG | NEW DELHI | DELHI | 110001 | L1 | Accepted-AOC first lowest | |
| 2 | L2₹24.3 L+₹28,802.80 (4.92%)Accepted-AOC | L2 | Accepted-AOC second lowest |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
8 Sept 2022, 4:00 pmClosed
Asst Exe. engineer rew zanskar
BDO office zanskar
const.of ground level with breast wall at Cha
2022_RDD_7499_1
E-tender -07 Rew Zanskar
Open Tender
Civil Works - Buildings
Item Rate
60 days
zanskar
Please refer Tender documents.
2 documents required · 2 mandatory
₹70
Yes
BDO office zanskar
₹14,000
Yes
7 Jun 2025
2 Sept 2022
9 Sept 2022
3 Sept 2022
8 Sept 2022
3 Sept 2022
Amount
Earth work in excavation by mechanical means(Hydraulic excavator) over areas (Exceeding 30cm inDepth, 1.5mtr in width as well as 10sqm on plan)Including disposal of excavated earth, lead up to 50mAnd lift up to1.50 m, disposed earth to be leveled andNeatly dressed All kind of soil(40%)
Earth work in excavation by mechanical means(Hydraulic excavator) over areas (Exceeding 30cm inDepth, 1.5mtr in width as well as 10sqm on plan)Including disposal of excavated earth, lead up to 50mAnd lift up to1.50 m, disposed earth to be leveled andNeatly dressed(Ordinary Soil (50%)
Earth work in excavation by mechanical means(Hydraulic excavator) over areas (Exceeding 30cm inDepth, 1.5mtr in width as well as 10sqm on plan)Including disposal of excavated earth, lead up to 50mAnd lift up to1.50 m, disposed earth to be leveled andNeatly dressed ( Hard Rock (PB)(10%)
Earth work in excavation by manual means in trenchesfor foundations, drains, pipes, cables etc. (Not exceeding1.5 mtr in width) and for shafts, wells, cesspits and thelike exceeding 1 sqm on plan, depth upto 1.5mtr.including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed (All Kind of Soil (50%)
Earth work in excavation by manual means in trenchesfor foundations, drains, pipes, cables etc. (Not exceeding1.5 mtr in width) and for shafts, wells, cesspits and thelike exceeding 1 sqm on plan, depth upto 1.5mtr.including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed. (Ordinay Rock (50%)
Random Rubble masonry with hard stone from quarry in Foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate20mm nominal size) up to plinth level with Cement mortar 1:8 (1 Cement: 8 fine sand) including carriage complete job
Providing and laying in position cement concrete ofspecified grade excluding the cost of centering and shuttering- All work up to plinth level.1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size) nallah including carriage and complete job
Carriage of stone from source to site by 2Km MT and 300mts H/L
Carriage of sand/bajree from sources to site of work by 5Km MT and 300mts H/L
Carriage of cement/steel from source to site by 50Km MT and 500mts H/L
Providing and fixing of sign board
Add provision for Stair case including carriage and complete job.
M/S STANZIN CHOSPEL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .