Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.5 L+₹15.2 L (82.8%)Rejected-Finance AIRPORT ROAD KOHINOOR MALAPPURAM DIST PIN 673635 | MALAPPURAM | MALAPPURAM | KERALA | 673635 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
21 Feb 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGMSM
TELK, ANGAMALY
LEADING AND POSITIONING ERECTION TESTING AND COMMISSIONING AT SERVICE BAY OF 1 UNIT 250 MVA GT FOR NTPC SHAKTINAGAR SONEBHADRA UP.
2024_TEKL_656935_1
TELK/C AND M/OES/TRER/320/2024
Open Tender
Miscellaneous Works
Item Wise
365 days
SONEBHADRA UP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,100
Yes
₹14,000
Yes
3 Jul 2024
9 Feb 2024
23 Feb 2024
9 Feb 2024
21 Feb 2024
9 Feb 2024
PART A Receipt, dragging, handling, storage, erection, commissioning and handling over the 250MVA, 15.75/230kV, 3-Ph, GT transformer at Singrauli Site as per Cl 4.1, to 4.5 of scope of work. (Lump sum rate per transformer shall be quoted here)
PART A Dragging on rails/sleeper & placement on plinth of 250 MVA transformer up to 100m dragging. (Rate per meter for dragging up to 100 meter per Transformer shall be quoted here)
PART B (OPTIONAL) Additional dragging of transformer on rail/sleeper either due to distance being more than that specified in scope of work (Lump sum rate per meter per transformer shall be quoted here)
PART B (OPTIONAL) Additional turning of transformer by 180° for dragging / placement of plint (Basic lump sum rate per meter per transformer shall be quoted here)
PART B (OPTIONAL) Composite Monitoring system wiring as per drawing TK214593 (Lump sum rate per transformer shall be quoted here)
PART- B (OPTIONAL) To carryout additional drying of transformer (beyond the mandatory cycles) by N2 purging & heating under N2 filled condition. Supply of N2 cylinders having required dew point and heaters shall be contractor scope. (Rate per cycle shall be quoted here)
PART- B (OPTIONAL) EXTRA HIRE CHARGES Labour charges for repair / rectification / modification / additional work (Rate per cycle shall be quoted here)
PART-B(OPTIONAL) Hire charges for providing major facilities by contractor if needed for additional / extra work. Long boom Cranes suitable for bushing Erection. (Rate per day shall be quoted here)
PART-B (OPTIONAL) Derrick (Rate per day shall be quoted here)
PART- B (OPTIONAL) High vacuum Filter Machine For 12000 lph capacity filter machine (rate per day) (Rate per day shall be quoted here)
PART-B (OPTIONAL) For 6000 lph capacity filter machine. (rate per day) (Rate per day shall be quoted here)
PART-B (OPTIONAL) Oil Tankers For 10 kL capacity (rate per day) (Rate per day shall be quoted here)
PART-B (OPTIONAL) For 15 kL capacity (rate per day) (Rate per day shall be quoted here)
MELCON ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .