| 1.01 | Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc. for first day ie.15.11.2025 Sree dharma sastha temple structure including Prasadamandapam by using 450 set. | 450 | set | 10 ₹4,500 Lowest |
| 1.02 | Malikapuramdevi temple structure including prasadamandapam and gopuram by using 200set | 200 | set | 10 ₹2,000 Lowest |
| 1.03 | Devaswom book stall and Accommodation office building at sannidhanam by using 100 set | 100 | set | 10 ₹1,000 Lowest |
| 1.04 | Tree in the lower thirumuttom by using 300set | 300 | set | 10 ₹3,000 Lowest |
| 1.05 | Publicity and information office building by using 50set. | 50 | set | 10 ₹500 Lowest |
| 1.06 | Devaswom guest house by using 50set | 50 | set | 10 ₹500 Lowest |
| 1.07 | New Annadhanamandapom Building by using 100 Set. | 100 | set | 10 ₹1,000 Lowest |
| 1.08 | Maramath complex by using 150set. | 150 | set | 10 ₹1,500 Lowest |
| 1.09 | Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc. for additional 65 days from 16.11.2025 to 19.01.2026 Sree dharma sastha temple structure including prasadamandapam by using 450 set/day for 65days.(450x65days=29250sets) | 29,250 | set | 2 ₹58,500 Lowest |
| 1.10 | Malikapuram devi temple structure including prasadamandapam and gopuram by using 250set/day for 65 days.(200x65=13000set) | 13,000 | set | 3 ₹39,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹26,100
Closing Date
25 Sept 2025, 6:00 pmClosed
EXECUTIVE ENGINEER, ELECTRICAL DIVISION
EXECUTIVE ENGINEER OFFICE, ELECTRICAL DIVISION, TRAVANCORE DEVASWOM BOARD,CHENGANNUR
Sabarimala Devaswom M ND M festivals in 1201 ME providing temporary illumination to the temple structure and various building and providing temporary light arrangements to the police shelters and fire point etc at Sabarimala and kunnar reg
2025_TDB_796985_2
TDB/EEE/ET-101/2025-26
Open Tender
Electrical Works
Item Rate
66 days
sabarimala
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
₹26,100
28 Sept 2026
22 Sept 2025
27 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
Amount
Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc. for first day ie.15.11.2025 Sree dharma sastha temple structure including Prasadamandapam by using 450 set.
Malikapuramdevi temple structure including prasadamandapam and gopuram by using 200set
Devaswom book stall and Accommodation office building at sannidhanam by using 100 set
Tree in the lower thirumuttom by using 300set
Publicity and information office building by using 50set.
Devaswom guest house by using 50set
New Annadhanamandapom Building by using 100 Set.
Maramath complex by using 150set.
Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc. for additional 65 days from 16.11.2025 to 19.01.2026 Sree dharma sastha temple structure including prasadamandapam by using 450 set/day for 65days.(450x65days=29250sets)
Malikapuram devi temple structure including prasadamandapam and gopuram by using 250set/day for 65 days.(200x65=13000set)
Devaswom book stall and Accommodation office building by using 100 set/day for 65days (100x65days=6500set).
Tree in the lower thirumuttom by using 300set/dayfor65days(300x65days=19500set)
Publicity and information office building by using50set/dayfor65days(50x65day=3250set
Devaswom guest house by using 50set/day for 65day(50x65day=3250set)
New Annadhanamandapom Building by using 100set/day for 65days (100x65 days=6500set)
Maramath complex by using 150set/day for 65days(150x65day=9750set)
Providing temporary light arrangements on hire bases to the police shelters and fire points Bailey bridge and certain various locations at Sabarimala. Hire and labour charge for providing wiring light/fan point inside the shed using 1sq.mm PVC insulated copper wire through 20mm dia PVC conduit and accessories and ceiling rose for first day ie:15.11.2025
Do …. do for additional 65days from 16.11.2025 to 19.01.2026.(468x65=30420 nos)
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie: on 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for first day ie;on15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 1x40W patties type fluorescent fittings with all accessories and tubes for first day ie;15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 1200mm sweep ceiling fan and giving connection for first day ie;15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 20mm PVC pipe with accessories for First day ie;on15.11.2025
Do …. do for additional 65days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 4x3/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing 3 phase 4 way MCB DB with 40A 4 pole ELCB & 40A 4 pole isolator and giving connection for First day ie;15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing ordinary type meter board consists of 3nos 100/ 63A HRC cut out with fuse link and 1no 100/ 63A 2 way neutral link for Fist day ie; 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing ordinary pipe earthing as required for First day ie; 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charges for providing drawing No 10 SWG base copper conductor and giving connection for First day ie; 15.11.2025
Do …. do for additional 65 days from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Temporary light arrangements in kunnar dam site Hire and labour charge for providing 10KVA DG set complete including conveyance posting of duty staff for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Running charges for 10KVA DG set including supply of fuels etc:
Hire and labour charges for providing 3 phase 4way MCB DB with 40A 4 pole ELCB & 40A 4 pole isolator and giving connection for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing ordinary pipe earthing as required ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 20mm PVC pipe with accessories for First day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 2x3/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for First day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 2x7/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for First day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 1X40W patties type fluorescent tube fittings complete with tube in position and giving connection as required for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026s
Temporary light arrangements in check dam site Hire and labour charge for providing 10KVA DG set complete including conveyance posting of duty staff for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Running charges for 10KVA DGset including supply of fuels etc:
Hire and labour charges for providing 3 phase 4way MCB DB with 40A 4 pole isolator ELCB and giving connection for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing ordinary pipe earthing as required ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 20mm PVC pipe with accessories for First day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 2x3/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 2x7/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for First day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 1X40 W patties type fluorescent tube fittings complete with tube in position and giving connection as required for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
Hire and labour charge for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie:15.11.2025
Do. do. for the remaining 65 days during the period from 16.11.2025 to 19.01.2026
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .