Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹47.5 LAccepted-AOC VILL TILTHAI PANISAGAR DIST NORTH TRIPURA | ₹47.5 L | L2 | Accepted-AOC As L1 found non responsive due to non submission of Enlistment in proper category, so L2 became L1. |
| 2 | L3₹48.0 LRejected-AOC LOCATION TRIPURA TR | WEST TRIPURA | TRIPURA | 799005 | ₹48.0 L | L3 | Rejected-AOC As L2 became L1 so L3 became L2 |
| 3 | L4₹50.8 LRejected-AOC GOBINDAPUR DHARMANAGAR NORTH TRIPURA | ₹50.8 L | L4 | Rejected-AOC As L2 became L1 so L4 became L3 |
| 4 | L5₹51.4 LRejected-AOC | ₹51.4 L | L5 | Rejected-AOC As L2 became L1 so L5 became L4 |
| 5 | L6₹53.6 LRejected-AOC JAIL ASHRAM ROAD P O DHALESWAR AGARTALA PIN 799007 WEST TRIPURA | WEST TRIPURA | TRIPURA | 799007 | ₹53.6 L | L6 | Rejected-AOC As L2 became L1 so L6 became L5 |
Tender Value
₹54.7 L
EMD Value
₹1.1 L
Closing Date
25 May 2026, 3:00 pmClosed
Oo. the Executive Engineer, PWD (RnB) Division, Dh
Oo. the Executive Engineer, PWD (RnB) Division, Dharmanagar, North Tripura
Building portion in/c sanitary installation, water supply arrangement and setting up basic civil requirements for Lab Unit
2026_CEPWD_73098_1
70/SE(I)/PWD(RnB)/KGT/2025-26
Open Tender
Civil Works - Building
Percentage
270 days
kADAMTALA
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹1.1 L
8 Sept 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
i) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size) | - | Cum. | 10,249.1 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
ii) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum. | 11,355.7 | - |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars,piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-
1 : 1.5 : 3 ( 1 cement : 1.5 fine sand : 3 graded stone aggregate of 20 mm nominal size) | - | Cum. | 13,305.8 | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum. | 13,584.5 | - |
| 5 | Centering shuttering including struttings, propping etc. and removal of form work for:
i) Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply | - | Sqm. | 729.5 | - |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for:
ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply | 0.2 | Sqm. | 499.4 | ₹99.88 |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for:
iii) Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 1 | Sqm. | 625.5 | ₹624.87 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
i) Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kg. | 103.9 | - |
| 9 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
i) In cement mortar 1:6 ( 1 cement : 6 fine sand ). | - | Cum. | 11,064.8 | - |
| 10 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 0.2 | Sqm. | 1,533.5 | ₹305.17 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_74388.xls
BOQ • 0.29 MB
dnit01sepdf_merged.pdf
Tender Documents • 5.02 MB
Corrigendum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .