Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 5 PANNAMGADU INDUSTRIAL ESTATE RAMAPURAM POST SULURPET TALUK NELLORE DISTRICT NELLORE ANDHRA PRADESH 524401 | TIRUPATI | ANDHRA PRADESH | 524401 | Admitted-Finance |
| 2 | Admitted-Finance 02 ANNEXE 2ND FLOOR RAMACHANDRAPURAM HYDERABAD 500032 INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500032 | Admitted-Finance |
| 3 | Admitted-Finance 12 LANDT HOUSE SHIVAJI NAGAR NORTH AMBAZARI ROAD NAGPUR MAHARASHTRA 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | Admitted-Finance |
| 4 | Admitted-Finance PARAMOUNT COMPLEX PARAMOUNT COMPLEX GOTRI ROAD RACE COURSE VADODARA GUJARAT 390007 UDYAM GJ 24 0020874 24AABCP6509P1Z3 R 18AABCP6509P1ZW S 06AABCP6509P1Z1 S 27AABCP6509P1ZX S 33AABCP6509P1Z4 S MSME STATUS AS NOT VERIFIED | VADODARA | GUJARAT | 390007 | Admitted-Finance |
| 5 | Admitted-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
30 Jun 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
As per NIT
As per NIT
DM PLANT WITH ZLD PACKAGE AND CPU PACKAGE FOR LUPECH J18 PROJECT
2021_REFHQ_133948_1
077154C/T/LuPech(J18)/PACKAGE2
Global Tenders
Lump Sum TurnKey
Lump-sum
570 days
Vadodara
As per NIT
5 documents required · 5 mandatory
Exempted
Online
20 Aug 2021
3 Apr 2021
1 Jul 2021
3 Apr 2021
30 Jun 2021
17 Jun 2021
3 Apr 2021 - 21 Apr 2021
22 Apr 2021
180 days
Amount
Process Design and Engineering, Detailed Design and Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Site development and enabling jobs, Demolition/ Dismantling/Re-routing works, Topography Survey and Soil Investigation, underground scanning and co-ordination for the same with Owner/PMC, Complete Procurement (including all supply of all items, equipment and construction material, chemicals, catalysts, first fill of chemicals and lubricants consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment at site, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, supply and handing over of mandatory spares and consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of 3 x 250 m3/hr RO DM PLANT WITH ZLD PACKAGE, 2 x 250 m3/hr CPU PACKAGE INCLUDING COMMON UTILITY / MS BLOCK SUBSTATION for Petrochemical and Lube Integration Project “LuPech” (J-18) Project at IOCL Gujarat Refinery, India, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period and supply of Chemicals, Catalysts (if any), Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAKUP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ANALYSERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Package PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for BATTERY CHARGER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFD as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HVAC / Pressurisation System as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR PACKAGE-02 AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION
COOLING WATER
GUARANTEED LP STEAM CONSUMPTION
Description of Work / Item(s)
Amount
Operation and Maintenance Contract for three years as per the detailed scope of work defined in the bidding document
Supply Portion ( Supply of all materials including Chemical, Oil and Lubricants etc after 6 months operation)
Service Portion
Total Value
VA Tech Wabag Ltd
Bharat Heavy Electricals Limited
PARAMOUNT LIMITED
BGR Energy Systems Limited
VA Tech Wabag Ltd
Bharat Heavy Electricals Limited
PARAMOUNT LIMITED
BGR Energy Systems Limited
VA Tech Wabag Ltd
Bharat Heavy Electricals Limited
PARAMOUNT LIMITED
BGR Energy Systems Limited
Bharat Heavy Electricals Limited
PARAMOUNT LIMITED
VA Tech Wabag Ltd
LARSEN AND TOUBRO LIMITED
BGR Energy Systems Limited
VA Tech Wabag Ltd
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
VA Tech Wabag Ltd
BGR Energy Systems Limited
Bharat Heavy Electricals Limited
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
Bharat Heavy Electricals Limited
BGR Energy Systems Limited
VA Tech Wabag Ltd
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
BGR Energy Systems Limited
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .