Loading…
Loading…
Tender Value
₹33.3 L
EMD Value
₹34,000
Closing Date
8 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat Road and Building Division, Morbi
Resurfacing of Devipur Approach Road Km.0/000 to 0/850 Ta.Halvad, Dist.; Morbi (Under MMGSY-Normal-2025-26) (3rd Attempt)
299995
65 / 2026
Open
Civil - All
Morbi
8 documents required · 8 mandatory
₹1,500
Executive Engineer, Panchayat Road and Building Division, MORBI
₹34,000
30 Apr 2026
30 Apr 2026
30 Apr 2026
8 May 2026
30 Apr 2026
Name of work :- Resurfacing of Devipur Approach Road Km.0/000 to 0/850 Ta.Halvad,
Dist.; Morbi (Under MMGSY-Normal-2025-26)(3rd Attempt)
BILL OF QUANTITIES
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
1 Clearing and grubbing road land including 0.19 One 28455.09
uprooting rank vegetation grass Hect.
bushes,shrubs,sapling and trees girth upto
300 mm removal of stumps of tree scutearlie
rand disposal of unserviceable materials (C)
By mechanical means in area of light jungle
2 Providing, laying, spreading, rolling, 156.00 One 591.82
watering & Consolidation to desireddensity Cum
of Quarry spall with all lead and lift.
3 Providing, Laying, Spreding and 629.00 One 1327.31
Compacting Stone Aggregate of 63 to 45 mm Cum
Size To Water Bound Macadum Specification
including Spreding in Uniform Thickness
Hand Packing, Rolling with Smooth Wheel
Roller 80-100 KN in Stages to Proper Grade
and Camber, applying and Brooming, Stone
Screening/Binding Material To Fill up the
Interstices of Coarse Agrregate, Watering
and Compacting to The Required Density
Grading-II as per Technical Specification
4 Providing and Laying bitumeaneous grout 375.00 One 2267.12
37.50 mm Thick Using Asphalt Grade VG 30 MT
& Emulsion RS-1 for Tack Coat at the Rate of
4.00 kg./per 10 Smt. on WBM Surface and
using BT Chips for Required Gradation with
Asphalt of Grade VG 30 at the rate of 1.99 %
i.e.e. 19.90 Kg/ MT by Weight of Mix
including heating and Mixing in drum mix
plant, Transporting the Mix and Sprading
the Same by Paver Finisher and
Consolidation as per MOST Specification
including Cost of all materials, Fuel,
Labours, tools and Plants etc. using
contractor's own drum mix plant etc.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
5 Providing, Laying and rolling of 37.5 mm 207.00 One 2810.36
thick Compacted Bitumeneous Macadam MT
(BM) in One Layer With B.T aggregates as
per MoRTH&H specified and Emulsion RS-1
For Tack Coat at the Rate of 2.50 kg./per
Smt. on B.T. Surface (As per IRC-16) with
mechanical sprayer and using Asphalt of
Grade VG 30 at the rate of 3.4 % i.e.
Kg/ MT by Weight of Mix including heating
and Mixing in drum mix plant, Transporting
the Mix and Sprading the Same by Paver
Finisher and Consolidation with vibratory
roller including necessary including cost of
hire charges, firewood,oil,lubricants
charges,etc.by using contractor's own drum
mix plant,machineries and equipment,tools
etc.complete in accordance with the
requirement of specification.
6 Providing, Laying ad Rolling of 20 mm thick 115.00 One 3303.18
Compacted Mix Seal Surface With BT and MT
Aggregate as specified using Bitumen grade
VG-30 For Mixing with Aggregate at the rate
of 5.10 % i.e. 51.00 Kg / MT of total mixing
in drum mix plant and transporting the mix
material by tippers and laying with Paver
Finisher and Consolidation with vibratory
roller including necessary Cost of all
materials, Fire Wood, Oil, Lubricant, Fuel,
Labours, tools and using contractor's own
drum mix Plants,machineries and
equipment,tools etc. Incl. Flushing of Sand
0.3 Cum/ 10 Sqm etc. Complete.In
Accordance with the requirement of
7 Providing and fixing Precast cement concrete 3.00 One 356.49
Hectometer as per IRC type design incl. No
painting, lettering etc. fixing in C.C. 1:5:10.
8 Providing and fixing Precast cement concrete 20.00 One 350.80
Guard stone as per I.R.C. type design No
including white washing etc. complete.
Fixing in C.C.1:5:10.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
9 Providing and fixing ordinary Kilometer 2.00 One 704.33
stone of pre-cast C.C. 1:2:4 including No
necessary reinforcement as per I.R.C. type
design in C..C. 1:4:8 including painting
lettering etc. complete. (For ODR, VR)
10 Providing and fixing Indicator stone of 29.50 One 343.26
approve stone as per I.R.C. type design in No
C.C. 1:4:8 including white washing etc.
complete Fixing in Earth
11 Supplying and fixing Junction Boards of 2.00 One 5236.69
M.S. plates and angles as per I.R.C. design No
incl;. Fixing in C.C. 1:4:8 with necessary
excavation painting, figuring, lettering on
boards etc. complete.
12 Providing and fixing Village name Boards as 1.00 One 3437.59
per standard I.R.C. type design of steel plate No
incl. painting, lettering etc. complete with
fixing in C.C. 1:4:8 block with necessary
excavation etc. complete
13 Informatory Signs :-Providing and fixing sing boards 2.00 One 3856.89
made out of 2mm aluminium sheet; size 80 x 60cms. No
rectangle as per the design of IRC-67-1977 pre treated
with phospheting process & acid teching; coated with
one coat of epoxyprimer and two coats of best
qualityepoxy paint; reflectorised with retro refiective
sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand postand frame fabricated from suitable
sizeiron angle of 35 x 35 x 3mm75x75x6mm as
required; painted with best qualityepoxy coatings in
black and whitebends. the details of symbol for
eachboard shall details of symbol for eachboard shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CC block of size 45 x45 x
60cms. for each leg. including excavation curing tec.
complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
14 Route marker sign :-Providing & fixing sign boards 8.00 One 3744.67
made out of 2mm aluminium sheet, size 60x45cms. No
rectangle plus 30x25cms additional plate as per the
attached drawing (IRC) pre treated with phospheting
process & acid etching. coated with one coat of epoxy
primer and two coats of best quality epoxy paint
reflectorised with retro sheeting as per latest M.O.S.T.
Specifications ; 3.1m long stand post and frame
fabricated from iron angle of 35 x 35 x 3mm
75x75x6mm as required, painted with best quality
epoxy coating in black and white bends The details of
numerals for No. board shall be as per the instruction
of engineer in charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45x 60cms. for No. leg,
including excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer
15 Cautionary Warning Sign : Providing and fixing sign 2.00 One 3808.65
boards made out of 2mm Aluminium sheet size No
90x90x90 cms. Equilateral treangle as per the design
of IRC-67-1977 pre treated with phospheting process
and acid etching coated with one coat of apoxy
primer and two coats of best quality epoxy paint
reflectorised with retro reflective sheeting as per latest
MOST specification 3.1 Mt. long stand post and frame
fabricated from suitable size iron angle of
35x35x3mm, 75x75x6mm. as required painted with
best quality epoxy coating in black and white bends
the details of symbole for each board shall be as per
the instruction of Engineer in charge the fixing at site
shall be in 1:2:4 CC block of size 45x45x60cms. for
each leg including excavation curring etc. complete
under the supervision of engineer in charge (A)
Engineering Grade.
16 Providing and erecting logo cum informatory retro 1.00 One 6050.91
reflectorised board as per IRC-67 made of engineering No
grade sheeting as per specification fixed over
aluminium sheeting, 2mm thick as logo board with
vertical support of M.S. angle 35x35x5 mm and lateral
clearance of 100mm between logo & informatory
board and 2mm thick M.S. plate as information board
with area exceeding 0.90 sqm. fixed on frame of an
angle 35x35x5 mm and supported on a M.S. angle
iron post 75mm x 75mm x 6 mm - 2Nos firmly fixed
to the ground by means of properly designed
foundation with M 15 grade cement concrete 45cm x
45cm x 60cm, below ground level as per drawing,
including painting and installation at site
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
17 Providing and laying of Hot applied Thermoplastic 1300.00 One 367.72
compound 2.5 mm thick including Reflectorising Sqm
Glass Beads @ 250 gms per Smt area, thickness of
mm is exclusive of surface applied glass beads as per
IRC : 35 & finished surface to be level, uniform and
free from streaks and holes. (As per Government
letter No.SOR 102003/94/S-1/ Dated.20-7-2004)
18 Cat Eye / Road Stud / RPM: Supplying of 74.00 One 326.23
Molded Twin Shanks Raised Pavement No
Markers made of polycarbonate and ABS
moulded body and reflective panels with
micro prismatic lens capable of providing
total internal reflection of the lightentering
the lens face and shall support a load of
13635 kgs.tested in accordance to ASTM D
4280 Type H and complying to Specifications
of Category A of MORTH Circular No
RW/NH/33023/10-97 DO III Dt 11.06.
The height, width and length shall not
exceed 20 mm, 130 mm and 130 mm and
with minimum reflective area of 13 Sqcm on
each side and the slope to the base shall be
35 +/- 5 degree. The strength of detachment
of the integrated cylindrical shanks, (of
diameter not less than 19 +/- 2 mm and
height not less than 30+/- 2 mm) from the
body is to be a minimum value of 500 Kgf.
Fixing will be by drilling holes on the road
for the shanks to go inside,without nails and
using epoxy resin based adhesive as per
manufacturers recommendation and The
color of the marker should be as per the IRC
Thirty and asLakh(s)
Three directedThirty
by Engineer in-
One Thousand Four Hundred Thirty Six And
Paise Twenty Four Only
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent
( Should be written in figures and words ) of the estimated rate mentioned above. Amount of My
\ Our tender works put as under.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R&B Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD Devipur-MM-N-RS-Halvad.pdf
2 Speci Devipur-MM-N-RS-Halvad.pdf
3 Sch -B.pdf
4 GR SBD.pdf
5 Envirement MMGSY.pdf
Download all tender documents and submit your bid