Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-AOC HOUSE NO 190 WARD NO 08 HAMIRPUR | ₹44.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹46.6 L+₹2.5 L (5.73%)Rejected-Finance VILL MOLANA PO BOHNI TEHSIL AND DISTT HAMIRPUR HP | ₹46.6 L+₹2.5 L (5.73%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | - | - | Rejected-Technical Non Responsive |
Tender Value
₹44.7 L
EMD Value
₹75,500
Closing Date
18 Oct 2023, 10:30 amClosed
Executive Engineer
E.E HP.PWD Ghumarwin Division
Completion and strengthening of Berthin-Chhat Karloti-Dangar Targhel Taroun Ladraur road SStrengthining of road at Km.3/605 to3/660, Providing and Laying WMM, Bitumenous Macadam and Bitumenous concrete in damaged reaches in km 5/180 to 5/525 etc.
2023_PWD_79973_1
7795-7800 dated 06/10/2023
Open Tender
Civil Works - Roads
Item Rate
90 days
Ghumarwin
please refer in tender documents
9 documents required · 9 mandatory
₹2,000
₹75,500
HP.PWD Ghumarwin Division
1 Jan 2024
10 Oct 2023
18 Oct 2023
10 Oct 2023
18 Oct 2023
10 Oct 2023
16 Oct 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kind of soil.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm spread thickness (finished work including materials and labour).The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size). The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying heavy duty precast cement concrete inter locking 80mm (Eighty millimetre) thick interlocking paver blocks vibro compacted upto M- 50 (M-fifty) made with vibration technolgy in PVC / Fiber moueis pre polished IS marked No. 15658 of NTC or its equailvent grade including border or kerb block grey or coloured over sub-base of concrete with 25mm (twenty five millimetre) thick average thickness of cement mortar 1:4 (one cement : four sand) laid over and jointed with neat cement slurry mixed with pigment to match the shade of blocks including curing rubbing & polishing complete (Sub base concrete floor to be paid for separately) including carriage of material with in all leads and lifts as per the direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying spreading compacting graded stone aggregate to wet mix macdam specification including premixing the material with water at OMC in mechanical mixer (pug Mill) carriage of mixed material by tipper to site , laying in uniforms layers in subbase /base course on a well prepared subbase and compacting with smooth wheel roller of 80 to 100 kn weight to achieve the desired density including lighting , barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406.as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other construction worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.00 kg/Sqm(Zero pointg seven zero to one pointg zero kilogram per square metre) using mechanical means as per Technical specification clause 502 as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion distributor at the rate of 0.25 to 0.30 Kg(Zero point twenty five to zero point thirty)kilogram per square meter on the prepared granular surface treated with primer cleaned with Hydraulic broom as per Technical specification clause -503as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m (one thousand metre) laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification MORD 2014 Clause 504 with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes (seventy five tonnes) per hour using crushed aggregates of specified grading, premixed with bituminous binder @ minimum 3.3 (three Point Three) per cent VG-30 (Viscosity grade thirty) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per IRC-29-1988 complete in all respects as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other construction worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying 30 mm (thirty millimetre) thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes (seventy five tonnes) per hour using crushed aggregates of specified grading, premixed with bituminous binder @ minimum 5 (five) per cent VG-30 (Viscosity grade thirty) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per IRC-29-1988 MORTH technical specification 2013 clause 509 complete in all respects as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other construction worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Arvind Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .