| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.8 LAccepted-AOC | ₹77.8 L | L1 | Accepted-AOC Lowest bid submitted |
Tender Value
₹77.8 L
EMD Value
₹50,000
Closing Date
6 Apr 2020, 4:00 pmClosed
Regional Engineer
Kerala State Nirmithi Kendra NHEC Barton hill Vanchiyoor P.O Thiruvananthapuram
This work includes making of tractor ground, parade ground, providing badminton court, entrance gate, yard lights, pond and doing necessary plumbing and landscaping works at RTTC Vellayani.
2020_KSNK_348476_1
KSNK/TECH/NHEC/TD-137(R2)/2019
Open Tender
Civil Works - Others
Item Rate
90 days
Vellayani
Refer NIT
7 documents required · 7 mandatory
₹2,500
online
₹50,000
Yes
5 Jun 2020
6 Mar 2020
8 Apr 2020
6 Mar 2020
6 Apr 2020
6 Mar 2020
6 Mar 2020 - 6 Apr 2020
Amount
MAKING TRACTOR GROUND
CIVIL WORKS
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.7.2 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
13.37.1 White washing with lime to give an even shade:New work (three or more coats)
13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
16.68 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
MAKING PARADE GROUND AND CONNECTING LANDSCAPING AND POND
CIVIL WORKS
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
6.3.2 Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):With Modular bricks
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.7.2 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
2.28.1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
16.68 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
16.69 Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature jointed with cement mortar 1:3 ( 1 cement : 3 coarse sand) , including making joints with or without grooves ( thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge ( length of finished kerb edging shall be measured for payment ). ( Precast C.C.kerb stone shall be approved by Engineer-in-Charge)
13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
Planting Indian coffee plum of hight 0.45m
30.2.9 Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-incharge
Supplying and laying cow dung
Supplying, stacking and spreading 6 mm thick red bajri etc complete including preparation of the surface for laying grass and plants
Providing and fixing Buffalo grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and even, watering with sprinkler
13.33.1 Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
16.3.9 Supplying and stacking at site.Good earth
30.2.3 Supplying and stacking sludge at site including royalty and carriage upto 5 k.m. lead complete (sludge measured in stacks will be reduced by 8% for payment).
Supplying and laying precast water body mould of size 2.5x1.2x1 m
MAKING ENTRANCE GATE
CIVIL WORKS
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
7.2.1 Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
6.3.1 Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):With F.P.S. ( non modular ) bricks
13.7.2 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
13.37.1 White washing with lime to give an even shade:New work (three or more coats)
13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
10.16.2 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes
13.85.2 Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content.With ready mixed red oxide zinc chromatic on steel / iron works having VOC content less than 250 grams/ litre
13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
LANDSCAPING WORKS
CIVIL WORKS
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
6.3.1 Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):With F.P.S. ( non modular ) bricks
5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.7.2 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
13.37.1 White washing with lime to give an even shade:New work (three or more coats)
13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
8.2.1.2 Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm
8.3.2 Providing edge moulding to 18 mm thick marble stone counters, vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer -in-Charge.Granite work
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Planting Indian coffee plum of hight 0.45m
30.2.9 Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-incharge
Supplying and laying cow dung
Supplying, stacking and spreading 6 mm thick red bajri etc complete including preparation of the surface for laying grass and plants
Providing and fixing Buffalo grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and even, watering with sprinkler
16.3.9 Supplying and stacking at site.Good earth
30.2.3 Supplying and stacking sludge at site including royalty and carriage upto 5 k.m. lead complete (sludge measured in stacks will be reduced by 8% for payment).
YARD LIGHT
CIVIL WORKS
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
18.12.8 Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
Supplying and fixing light arm of length 1.50m using 2inch GI dip galvanised pipe,etc complete
Applying epoxy primer two coats on GI posts with arm including all labour charges, cost of amterials etc., complete
Applying one coat wash primer on GI posts with arm including all labour charges, cost of amterials etc., complete
ELECTRICAL WORKS
Supplying and fixing following way, horizontal type three pole and neutral, sheet<br>steel, MCB distribution board, 415 V, on surface/ recess, complete with tinned copper<br>bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including<br>earthing etc. as required. (But without MCB/RCCB/Isolator) 6 way (4 + 18), Double door
5.19 Providing and fixing 4.00 mm dia copper wire on surface or in recess for loop earthing along with existing surface/ recessed conduit/ submain wiring/ cable as required.
Supplying and fixing Osram Strada 40W-Street light,LED,3400 lm,IP66 lights and other acessories
Supplying and fixing corrossion resistant cable junction box(hencel),etc and giving connection.
Supplying and fixing Syntex junction box with 32 amps 3 pole connector etc and giving connection
5.2 Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providingmasonry enclosure with cover plate having locking arrangement and watering pipe etc. withcharcoal/ coke and salt as required
Supply and drawing 10sq.mm UG cable(10x4) from DB to Lamp post and including all labour charges,cost of saddle clip with screw etc.complete
Supplying and drawing 25 sqmm 4 core Aluminum UG cable through earth and providing one layer country burnt brick on top portion and re-filing the earth and giving connection etc.
Supplying and laying 2 core 1.5sq.mm UG cable with 16mm copper wire through 20mm PVC rigid pipe after excovating a trench 1.5 feet depth and giving connection
Supplying and laying 4 core 4 sq.mm UG copper cable with 14mm copper wire through 20mm PVC rigid pipe after excovating a trench 1.5 feet depth and giving connection
Supplying and fixing L&T MNX9 CONTECTOR 240V and other accessories
Supplying and fixing L&T MNX25 CONTRACTOR 240V and other accessories
Supplying and fixing L&T timer multi function and other accessories
2.3.2 Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar,interconnections, powder painted including earthing etc. as required. (But without MCBIRCCB/Isolator8 way, Double door
2.14.3 Supplying and fixing following rating, double pole, (single phase and neutral), 240 volts, residualcurrent circuit breaker (RCCB), having a sensitivity current upto 300 milliamperes in the existing MCB DB complete with connections, testing and commissioning etc. as required.63 amps
Supply and providing dust and vermin proof cubicle type three phase panel board of suitable size fabricated from 25x25x3mm angle iron and with 16 gauge MS sheet providing 2 Nos slotted angle fixed vertically at the rear side and 4 Nos slotted angle/flat fixed horizontaly to the 2Nos slotted angle already provided by suitable size GI bolts and nuts hinged door construction for the front side providedwith vision panel and providing necessary support to fit the board on wall knock outs for wire/cable entry and exit required quantity of rubber beedings painting the entire board with 2 coats of synthetic enamel paint over a coat of red oxide primer, fixing it on the wall, making good the damages, colour washing etc, as required.32A 250V 50Hz ICDP switch (1 phase)32A 250V procelain fuse unit - 1No32A, 250V neutral link - 1No
Supplying and fixing Bullard light and other accessories
Supplying and fixing spot light and all other accessories etc., complete
PLUMBING WORKS
18.48A Providing and fixing rectangular high density polyethylene water storageloft tank with cover, conforming to ISI : 12701, colour of opaque white or asapproved by Engineer-in-charge. The rate includes making necessary holesfor inlet, outlet & over flow pipes. The base support i/c fittings & fixtures fortank shall be paid separately.
50.18.7.2.1 Providing and fixing PVC pipes, fittings including fixing the pipe with claps at 1.00 metre spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 20 mm dia 12Kgf/cm2 - Internal work - Exposed on wall
50.18.9.13.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 12 Kgf/ cm2- External work- exposed on wall
18.51.1 Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms.15 mm nominal bore
50.18.9.14.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 10 Kgf/cm2 - External work- Exposed on wall
50.18.7.6.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 50 mm dia 10 Kfg/cm - Internal work- Exposed on wall
Supplying, erection, testing and commisioning of 1.5HP submearsable Pumb with starter and other accessories
Supplying and fixing 20 mm brass sprinkler and other accessories
23.2.1.1 Boring /drilling bore well of required dia for casing / strainer pipe, by suitable method prescribed in IS: 2800 ( part I), including collecting samples from different strata, preparing and submitting strata chart/bore, including hire & running charges of all equipments, tools, plants & machineries required for the job,all complete as per direction of Engineer- in- charge, beyond 90 metre & upto 150 metre depth below ground level.All types of soil300 mm dia
23.3.2 Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS : 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer- in- Charge.150 mm nominal size dia
23.8 Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/medium/coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer- in- charge.
23.13.2 Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell of:150 mm dia
23.14.2 Providing and fixing M.S. clamp of required dia to the top of casing / housing pipe of tubewell as per IS :2800 ( part I), including ecessary bolts & nuts of required size complete.150 mm clamp
23.15.2 Providing and fixing Bail plug / Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS : 2800 (part I).150 mm dia
MAKING BADMINTON COURT
CIVIL WORKS
2.28.1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
13.5.1 15 mm cement plaster on rough side of single or half brick wall of mix:1:4 ( 1 Cement : 4 coarse sand)
10.16.2 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes
13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Supplying and fixing charges Cosco Nylon shuttle Badminton Net (Multicolor)
Supplying and laying Synthetic rubber mat of thickness 12 mm (green colour) using gum ,all labour charges etc complete
Providing edging around the badminton court using 12 mm thick black colour rubber mat,all labour charges etc complete.
Demarking the shuttle court as in standard measurements using reflexive paint
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .