| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-Finance | ₹63.9 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹70.8 LRejected-Finance | ₹70.8 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹74.2 LRejected-Finance | ₹74.2 L | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | GOPALAKRISHNAN NAIR L3 | V ASHOK KUMAR L1 | ARUN V G L2 |
|---|---|---|---|---|---|---|
| 1.00Soil Investigation | ||||||
| 1.00 | 56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. | 0.01 | sqm | 32.84 ₹0.20 | 30 ₹0.18 | 31.34 ₹0.19 |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 17,377.8 ₹17,377.80 | 15,800 ₹15,800 | 16,587.9 ₹16,587.90 |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 2 | Bore Holes | 3,300 ₹6,600 | 3,000 ₹6,000 | 3,150 ₹6,300 |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 10 | metre | 1,015.3 ₹10,153 | 950 ₹9,500 | 969.15 ₹9,691.50 |
| 1.00 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 10 | metre | 1,127.5 ₹11,275 | 1,050 ₹10,500 | 1,076.25 ₹10,762.50 |
| 1.01 | 56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete. | 10 | each | 569.8 ₹5,698 | 520 ₹5,200 | 543.9 ₹5,439 |
| 1.01 | 56.7:Conducting standard penetration test in bore hole at any depth. | 12 | each | 223.3 ₹2,679.60 | 200 ₹2,400 | 213.15 ₹2,557.80 |
| 1.01 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | 12 | each | 69.3 ₹831.60 | 60 ₹720 | 66.15 ₹793.80 |
| 1.01 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. | 1 | set | 11,000 ₹11,000 | 10,000 ₹10,000 | 10,500 ₹10,500 |
Tender Value
₹67.4 L
EMD Value
₹50,000
Closing Date
13 Mar 2026, 2:00 pmClosed
Executive Engineer
PWD Roads Division Thiruvananthapuram
GENERAL-SR 2025-26 Construction of RCC Retaining wall in Vembannor Cheriyakonni road near Vembannor Junction-Retaining wall Construction near Kurunthoottam JunctionGeneral Civil Work
2026_PWD_844760_1
PWD/RB/TR/22185/2025_5_1_1/1
Open Tender
Civil Works - Roads
120 days
Vembannor Cheriyakonni road near Vembannor Junctio
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
13 May 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
Soil Investigation
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7:Conducting standard penetration test in bore hole at any depth.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
Retaining Wall
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.E.1.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 - Using Concrete Mixer
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
OD229608/2025-2026:Supplying and fixing 75mm dia PVC pipe for Weep holes
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1426328.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
preliminaryagreement1.pdf
Tender Documents • 0.06 MB
viewsbd22185.pdf
Tender Documents • 1.63 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
AffidavitForm1.pdf
Additional Documents • 0.03 MB
integrity_pact.pdf
Additional Documents • 0.05 MB
BOQ_1426328.xls
BOQ • 0.31 MB
EPAYMENTFORM1.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid