Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹32.0 L+₹1.3 L (4.38%)Rejected-Finance | L2 | Rejected-Finance Rejected Being L2 | |
| 3 | L3₹32.2 L+₹1.6 L (5.27%)Rejected-Finance | L3 | Rejected-Finance Rejected Being L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Being L5 | |
| 5 | Rejected-Technical | - | Rejected-Technical Being L4 |
Tender Value
₹38.4 L
EMD Value
₹50,000
Closing Date
3 May 2022, 6:00 pmClosed
Beena N
Executive Engineer, Irrigation Division, Civil Station, Malappuram- 676505
CONSTRUCTION OF CC PROTECTION WALL IN LEFT BANK OF CHALIYAR RIVER AT THAZHE POTTY IN POTHUKALLU PANCHAYATH REACH-1
2022_Irrig_487767_1
EEIM/ET-02/2022-23
Open Tender
Civil Works - Others
Item Rate
180 days
THAZHE POTTY IN POTHUKALLU PANCHAYATH REACH-1
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,775
₹50,000
Yes
24 Aug 2022
23 Apr 2022
6 May 2022
23 Apr 2022
3 May 2022
23 Apr 2022
Amount
construction of cc protection wall
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
A.P. SUBAIR
V ABDUL RASHEED
PMR ENTERPRISES PVT LTD
MUHAMMED SHAFI K
UBAIDULLA
Bidder Name
V ABDUL RASHEED
PMR ENTERPRISES PVT LTD
V P Shoukathali
A.P. SUBAIR
UBAIDULLA
MUHAMMED SHAFI K
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_700664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .