Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC accept |
| 2 | L2₹2.8 L+₹46,551 (19.9%)Rejected-AOC BHIWANI | BHIWANI | ₹2.8 L+₹46,551 (19.9%) | L2 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | TECHNOFEB ENGINEERS L2 | R.B.ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Rewinding of Electrical Motor of capacity 325 HP, 03 phase, 08 pole, 740 RPM, 415 volt BCH Make Sr. No. 1811 80187972 & 1811 80188390
Rewinding works includes-
1. Dismantling of electric motor and old burnt material take off.
2. Cleaning the slots by air/petrol pressure.
3. Framing of coils with new electrolytic copper conductor as per original shape and size & providing new copper coil of as per existing gauge of BIC or ISI mark with 'F' class insulation.
4. Providing and fixing. of new "F" class insulation & testing of all coils.
5. Providing and fixing of epoxy glass slot wedges tying and lacing of coils with glass tape.
6. Silver brazing of connection joints and the formation of 03 phase connection leads and fixing the same with thimbles.
7. Varnishing and baking of motor with Dr. Beck Varnish, Backtole spring and drying of stator winding with complete testing.
8. Cleaning of rotor by Material take off and varnishing & baking alongwith dynamic balancing of rotor, checking & refixing of both end bearings and greasing the same (complete job),
The above rates are inclusive of credit of the old burnt copper coils in Motors at present market rate. | 2 | Nos. | 1,40,275.5 ₹2,80,551 | 1,17,000 ₹2,34,000 Lowest |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
5 May 2026, 11:00 amClosed
Executive Engineer LWS Mech Div Charkhi Dadri
Executive Engineer LWS Mech Div Charkhi Dadri
Rewinding of 2 nos 3 phase, 8 pole, 740 RPM BCH make electric motors of capacity 325 HP of pump house no 2 of Loharu Canal Additional Building
2026_HRY_518140_4
DNIT No. 2091-2109/37-A dated 28.04.2026
Open Tender
Supply, Erection and Commissioning
Works
Charkhi Dadri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹4,800
Yes
13 Jul 2026
28 Apr 2026
5 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Rewinding of Electrical Motor of capacity 325 HP, 03 phase, 08 pole, 740 RPM, 415 volt BCH Make Sr. No. 1811 80187972 & 1811 80188390
Rewinding works includes-
1. Dismantling of electric motor and old burnt material take off.
2. Cleaning the slots by air/petrol pressure.
3. Framing of coils with new electrolytic copper conductor as per original shape and size & providing new copper coil of as per existing gauge of BIC or ISI mark with 'F' class insulation.
4. Providing and fixing. of new "F" class insulation & testing of all coils.
5. Providing and fixing of epoxy glass slot wedges tying and lacing of coils with glass tape.
6. Silver brazing of connection joints and the formation of 03 phase connection leads and fixing the same with thimbles.
7. Varnishing and baking of motor with Dr. Beck Varnish, Backtole spring and drying of stator winding with complete testing.
8. Cleaning of rotor by Material take off and varnishing & baking alongwith dynamic balancing of rotor, checking & refixing of both end bearings and greasing the same (complete job),
The above rates are inclusive of credit of the old burnt copper coils in Motors at present market rate. | 2 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.07 MB
BOQ_597026.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .