Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.9 Laccepted-aoc | accepted-aoc |
Tender Value
₹8.9 L
EMD Value
₹8,935
Closing Date
5 Aug 2026, 1:30 pmClosed
SRI VARA SIDDI VINAYAKA SWAMY DEVASTHANAM, KANIPAKAM, CHITTOOR DIST
Kanipakam
Poviding temporary pendals and Q lines in the premises of SVVS Devasthanam, Kanipakam in view of Annual Bramhosthavams 2026
969202
SSVVSD-EQ1/142/2026
OPEN - NCB
Civil Works
CHITTOOR
8 documents required · 8 mandatory
₹317
₹8,935
14 Aug 2026
29 Jul 2026
29 Jul 2026
Hire charges for erection and removal of Flat roof pendals or sloped roof pendals as found necessary with Casurina or Eucalyptus posts girth of 250mm to 300mm measured at one metre above ground level after erection of posts, Bamboos double bamboo mats or coconut leves with thick covering with necessary frame work, coir rope etc., including providing watch and wrd and storing water in tubs etc., complete as directed during execution. The posts should be vertical and not curved, should be uniform size without much knots and should be strong (The rates for pendals will be paid as per area of pendals measured on covering plan area). The rate quoted is including conveyance of all materials and labour charges for fixing, removal, etc., complete . The rate quoted is including all taxes except service tax. The rate is for below mentioned calendar days
Hire charges for providing White ceiling cloth for decorating the pendals and mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necesary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Fetival or Ustvam period and should be removed after the same is over and should be repaired or replaced as and when tornout by any means including due to rain with out any extra cost. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete (The rate quoted is including all taxes except service tax). The rate is for below mentioned calendar day
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia and above posts and necessary frame work/rope etc., and ceiling with white ceiling cloth and all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. Rate is including coveyance of all materials and taxes, Transportation etc., complete.The rate is for below mentioned calender days.
For Bramhosthavam 22 days
For Bramhosthavam 2 days
Hire charges for erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes , suitable purlins, special type gripper MS clamps ( Nandu clamps) for fixing horizontal bracings at 2.40 m to 2.70m level and jointing pins for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m.The vertical posts are to be fixed strongly with out any shaking. The roof shall be covered with G.I sheet/Aluminium sheet/Galvalume sheet and firmly fixed to the purlins. The rate quoted is including conveyance and higher charges of all materials such as MS pips, Clamps, G.I sheet/Aluminium sheet/Galvalume sheet etc and labour charges for fixing and removal etc., complete . The rate is for below mentioned calendar days. (Rain proof)
For Bramhosthavam 22 days
For Bramhosthavam 2 days
Hire charges for providing three Seater VIP Sofas as decided by the department, including conveyance, loading and unloading charges etc., complete
Hire charges for providing of banquet chairs for VIPs including loading, unloading, transportation etc., complete.The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Transportation etc., complete
Hire charges for providing spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accedents, repairs and replacement etc., complete during the said period. Rate is including all txes, Transportation etc., complete except Service tax.
Hire charges for side walls including maintanance,watch, ward against theft and fire accidents repairs and repalcement etc., complete during the said period. Rate ins including all taxes, Transportation etc., complete except service tax.
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc.,including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution .
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/Function etc., as directed during execution. The rate quoted is including conveyance of all materials, The rate quoted is including all taxes except service tax. The rate is for below mentioned calendar dauys. The relevant conditions of the foot note mentioned at the end of these itemms/ chapter applies.
Hire charges for providing Rain proof shelters of different spans with clear height of 14' at the ends and suitable height at centre with central unsupported span of ranging 30' to 60'. The shelter shall be provided with adequate MS girders, trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc., The entire roof shall be covered suitably with GI sheets/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained off. (This rate is applicable when structure is provided using roof trusses.)
Hire charges for providing & fixing of good quality GI sheets ( 22 to 26 gauge) ( plain or corrugated ) sheets to the available frame work for roof or sides for function/festival pendals.
Supply of bamboo mats in view of Bramhostavam-2026 as directed during execution complete including all labour charges and transportation.
Hire charges for providing Pagodas of 15ft x 15ft size with clear height of 10' at the ends and 14' height at center. The pagodas shall be provided with adequate MS trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The entire roof shall be covered suitably with Fabric firmly fixed to the purlins etc., The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for erection & removal of side wall up to required height with frill type cloth of approved make and colour with back supporting cloth fixed to frame including cost of frame work as directed during execution for the function. The rate quoted is including all incidental charges & other taxes as applicable etc., complete
For Bramhosthavam 22 days
Hire charges for providing Plastic/Aluminium/Stainless steel water drums of storing capacity not less than 200 Ltrs including loading and unloading.
Hirecharges forerection and removal of temporaryDiasataheightof60cms to120 cms (2' 0" to4' 0") fromthe floor/Ground level usingMSpipevertical supportswith adjustable jockey andfoursidessupportingMSpipebracingandtopcovering19mm ply wood laid on M.S pipes frame work and should be made with out undulation. Theratequotedis includingconveyanceof allmaterials and labourcharges for fixing etc., complete . The rate is for below mentioned calendar days. *Therelevant conditionsof thefootnotementionedat theendof these items/chapter applies.
For Bramhosthavam 22 days
For Bramhosthavam 1 day
Supply of Man Mazdoor for making Bramhotsavalu-2026 arrangements and also to attend certain miscellaneous works during entire festival of 21 days and as directed by Engineer incharge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Pendals 26 BOQ.xlsx
TENDER_DOCUMENT • 0.02 MB
Pendals 26 cond.doc
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .