Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
11 Apr 2025, 3:00 pmClosed
Hiring of Truck / Trailer and loading/unloading of material under ADEN/RNY, ADEN/BPRD ADEN/NBQ and ADEN/GLPT. ( for two years )
88-ENGG-RNY-2024-25
88-ENGG-RNY-2024-25
Open
Service - General
24 Months
Chatra, Jharkhand
₹5,000
₹2.2 L
18 Mar 2025
18 Mar 2025
Item Breakup - A-NS item
For ADEN/RNY:Hiring charges of Truck (heavy Day vehicle of minimum 9 MT capacity) including all expenditure of driver, handyman/helper man and maintenance charges/cost of maintenance for each vehicle alongwith Diesel Engine, accidental charges, incidental charges, parking charges, taxes, permit charges, Insurance etc. all complete for the whole period
For ADEN/BPRD:Hiring charges of Truck (heavy Day vehicle of minimum 9 MT capacity) including all expenditure of driver, handyman/helper man and maintenance charges/cost of maintenance for each vehicle alongwith Diesel Engine, accidental charges, incidental charges, parking charges, taxes, permit charges, Insurance etc. all complete for the whole period. RANGIYA DIVISION-ENGINEERING/N F RLY
For ADEN/NBQ:Hiring charges of Truck (heavy Day vehicle of minimum 9 MT capacity) including all expenditure of driver, handyman/helper man and maintenance charges/cost of maintenance for each vehicle alongwith Diesel Engine, accidental charges, incidental charges, parking charges, taxes, permit charges, Insurance etc. all complete for the whole period.
For ADEN/GLPT:Hiring charges of Truck (heavy Day vehicle of minimum 9 MT capacity) including all expenditure of driver, handyman/helper man and maintenance charges/cost of maintenance for each vehicle alongwith Diesel Engine, accidental charges, incidental charges, parking charges, taxes, permit charges, Insurance etc. all complete for the whole period.
For ADEN/RNY:Running charges of Truck (heavy Kilometre 62500.00 vehicle of minimum 9 MT capacity) including cost of fuel i.e. Diesel, Mobile. Rate includes charges/cost of Automobile Engineers/technical experts with helpers and Automobile garage charges for daily checking or as requires for the vehicles. Rate also includes all repairing expences, cost of any kind of replaceable parts/assesories of the vehicle such as Diesel Engine, wheel, wheel axle, Crank shaft, Nylon Tyre with tube, glasses, Jack, grease etc. and incidental charges and any other charges complete for the whole period.
For ADEN/BPRD:Running charges of Truck Kilometre 62500.00 (heavy vehicle of minimum 9 MT capacity) including cost of fuel i.e. Diesel, Mobile. Rate includes charges/cost of Automobile Engineers/technical experts with helpers and Automobile garage charges for daily checking or as requires for the vehicles. Rate also includes all repairing expences, cost of any kind of replaceable parts/assesories of the vehicle such as Diesel Engine, wheel, wheel axle, Crank shaft, Nylon Tyre with tube, glasses, Jack, grease etc. and incidental charges and any other charges complete for the whole period.
For ADEN/NBQ:Running charges of Truck (heavy Kilometre 62500.00 vehicle of minimum 9 MT capacity) including cost of fuel i.e. Diesel, Mobile. Rate includes charges/cost of Automobile Engineers/technical experts with helpers and Automobile garage charges for daily checking or as requires for the vehicles. Rate also includes all repairing expences, cost of any kind of replaceable parts/assesories of the vehicle such as Diesel Engine, wheel, wheel axle, Crank shaft, Nylon Tyre with tube, glasses, Jack, grease etc. and incidental charges and any other charges complete for the whole period.
For ADEN/GLPT:Running charges of Truck Kilometre 62500.00 (heavy vehicle of minimum 9 MT capacity) including cost of fuel i.e. Diesel, Mobile. Rate includes charges/cost of Automobile Engineers/technical experts with helpers and Automobile garage charges for daily checking or as requires for the vehicles. Rate also includes all repairing expences, cost of any kind of replaceable parts/assesories of the vehicle such as Diesel Engine, wheel, wheel axle, Crank shaft, Nylon Tyre with tube, glasses, Jack, grease etc. and incidental charges and any other charges complete for the whole period. RANGIYA DIVISION-ENGINEERING/N F RLY
For ADEN/RNY:Loading/unloading of rail/ST MT sleeper/CST-9 pot/ PSC sleeper/ rail fittings etc. into truck/trailer etc. by Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/BPRD:Loading/unloading of rail/ST MT sleeper/CST-9 pot/ PSC sleeper/ rail fittings etc. into truck/trailer etc. by Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/NBQ:Loading/unloading of rail/ST MT sleeper/CST-9 pot/ PSC sleeper/ rail fittings etc. into truck/trailer etc. by Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/GLPT:Loading/unloading of rail/ST MT sleeper/CST-9 pot/ PSC sleeper/ rail fittings etc. into truck/trailer etc. by Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/RNY:Hauling of rail/ST sleeper/CST-9 MT pot/ PSC sleeper/ rail fittings etc. nearest level crossing or station circulating area Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/BPRD:Hauling of rail/ST sleeper/CST-9 MT pot/ PSC sleeper/ rail fittings etc. nearest level crossing or station circulating area Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/NBQ:Hauling of rail/ST sleeper/CST-9 MT pot/ PSC sleeper/ rail fittings etc. nearest level crossing or station circulating area Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S]
For ADEN/GLPT:Hauling of rail/ST sleeper/CST-9 MT pot/ PSC sleeper/ rail fittings etc. nearest level crossing or station circulating area Contractor's own arrangement all complete. Rate includes all labour, tools & plants and any other charges complete. [N/S] Total 14812760.56
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .