Regional project Director,Regional project managem
REGIONAL PROJECT DIRECTOR,REGIONAL PROJECT MANAGEMENT UNIT,KRWSA, MATHA ARCADE, THODUPUZHA, IDUKKI - 685584
Rectification Works of 1 no Small Water Supply Schemes Under Package-2 to Parathode GramaPanchayath in Kottayam District
2026_KRWSA_834625_4
KRWSA/IDKI/TEN/WSS/09/25
Open Tender
Civil Works - Water Works
90 days
Parathode Grama Panchayath in Kottayam District
As per tender condition
5 documents required · 5 mandatory
₹900
₹10,600
22 Jun 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
22 Jun 2026 - 1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1AMRUTHADHARA | |||||
| 1.01 | Supplying and fixing 5000 L HDPE tank including all charges for conveyence, labour, materials etc as per direction | - | no | - | - |
| 1.02 | Supply of PE Pipe, PE100, PN10, conforming to IS 4984/2016. 50 mm dia 10 kg | - | hp | 1 | - |
| 1.03 | Supply of PE Pipe, PE100, PN10, conforming to IS 4984/2016. 40 mm dia 10 kg | - | m | 1 | - |
| 1.04 | Supply of PE Pipe, PE100, PN10, conforming to IS 4984/2016. 32 mm dia 10 kg | - | m | - | - |
| 1.05 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil | 1 | m | - | - |
| 1.06 | "Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and including cost of fittings. 50 mm dia | - | m | - | - |
| 1.07 | "Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and including cost of fittings. 40 mm dia | - | m3 | - | - |
| 1.08 | "Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and including cost of fittings. 32 mm dia | - | m | - | - |
| 1.09 | Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | m | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1448741.xls
BOQ • 0.29 MB
NIT2.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid