Loading…
Loading…
Tender Value
₹9.0 Cr
EMD Value
₹6.0 L
Closing Date
11 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
17 conditions · 6 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer shall submit along with the tender document, documents in support of his/their claim to fulfill the eligibility criteria as mentioned in the tender document. Each page of the copy of documents/Certificates in support of credentials, submitted by the tenderer, shall be self- attested/digitally signed by the tenderer or authorized representative of the tendering firm. Self- attestation shall included signature, stamp and date ( on Each page).
The tenderer shall submit a certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder is enclosed as annexure-V & VA. Non submission of an certificate by the bidder shall result in rejection of his/their bid. And it shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the qualifying criteria mentioned in the tender document. It will not be obligatory on the part of Tender committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. NOTE-(i) Similar Work means "(a) Installation or Modification of PI/RRI/ EI/ IBS/ABS/LC gate interlocking (OR) (b) MACLS outdoor signaling works which includes one or more works like cable trenching and laying/location erection and wiring/point machine installation or replacement (including power siding points)/signal foundation and erection/ track circuiting/double distance/ BPAC installation/Axle counter installation/Installation of sliding barrier/conventional earthing etc. ". (ii) Certificate as mentioned vide above eligibility criteria issued by private firm/company/individual will not be accepted. NOTE :- Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of opening of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
The tenderer shall submit along with the tender document, documents in support of his/their claim to fulfill the eligibility criteria as mentioned in the tender document. Each page of the copy of documents/Certificates in support of credentials, submitted by the tenderer, shall be self- attested/digitally signed by the tenderer or authorized representative of the tendering firm. Self- attestation shall included signature, stamp and date ( on Each page).
The Tenderer should submit all the relevant documents required as per GCC-2022 to ascertain the eligibility status of the firm as per Para 10 to 19 of Annexure-I GCC-2022.
94 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenders containing erasures and/or alterations of the tender documents are liable to be rejected. Any corrections made by the Tenderer (S) in his/their entries must be attested by him/them.
Rights of the Railway to deal with tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender and no tender(s) shall demand any explanation for the cause of rejection of his/their tender nor the Railway undertake to assign reasons for declining to consider or reject any particular tender or tenders.
If the tenderer(s) deliberately gives / give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer(s) expires after the submission of his/their tender or after the acceptance of his/their tender, the Railway shall deem such tender cancelled. If a partner of a firm expires after the submission of their tender or after acceptance of their tender, the Railway shall deem such tender as cancelled, unless the firm retains its character.
All general and detailed drawing's pertaining to this work, which will be issued by the Engineer or his representatives (from time to time) with all changes and modifications.
Drawings for the work: - The drawings for the work can be seen in the office of the Senior Divisional/Divisional/District/Deputy Chief / Executive Engineer and / or Chief Engineer/Chief administrative officer (Construction) Railway at any time during the office hours. The drawings are only for the guidance of tenderer(s). Detailed working drawings (If required) based generally on the drawing mentioned above will be given by the Engineer or his representative from time to time.
Tenderer s Credentials: - Documents testifying tenderer s previous experience and financial status should be produced along with the tender or when desired by the competent authority of the South East Central Railway. Tenderer(s) who has / have not carried out any work so far on this Railway and who is/are not borne on the approved list of the contractors of South East Central Railway should submit along with his/their tender credentials to establish. i. His capacity to carryout the works satisfactorily. ii. His financial status supported by Bank reference and other documents. iii. Certificates duly attested and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
Non compliance with any of the conditions set forth there in above is liable to result in the tender being rejected.
Execution of contract documents:- The successful tenderer(s) shall be required to execute an agreement with the president of India acting through the South East Central Railway for carrying out the work according to Standard General condition of contract, Special conditions/specifications. annexed to the tender and specifications for work and materials of Railway as amended/corrected upto latest correction slips, mentioned in tender form (first sheet).
Partnership deeds, power of attorney etc.:-The tenderer shall clearly specify whether the tender is submitted on his own or on behalf of a partnership Firm/company/Joint venture(JV)/Registered Society/Registered Trust etc. The tenderer shall enclose the attested copies on the constitution of their concern, and copy of PAN card along with their tender. Tender documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust and society, as the case may be.
The tenderer whether sole proprietor, a company or a partnership firm/Joint venture (JV)/registered Society/registered trust etc.if they want to act through agent or individual partner (s) should submit alongwith the tender , a power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person specifically authorizing him/them to submit the tender, sign the agreement, receive money, witness measurements, sign measurement books,compromise, settle, relinquish any claim(s) preferred by the firm and sign No claim Certificate and refer all or any disputes to arbitration.
The contactor shall also employ qualified Graduate Engineer or qualified Diploma Engineer, based on value of contract, as may be prescribed by the Minister of Railways through separate instructions from time to time. As per GCC Clause 26A.
Railway reserves the right to draft the vehicles and equipment of contractor in case of accidents/natural calamities involving human lives. For this, separate payment shall be admissible through introduction of NS item as per clause of GCC, and the rates decided by the railway of this purpose shall be final and binding on the contractor and shall be an excepted mater and hence shall remain excluded from the preview of the arbitration clause of the agreement.
While executing the work along the Railway track/any other location in the vicinity of under ground signaling/Electrical/Telecom/OFC cables, the contractor s shall take all precautions to safe guard the cables. A penalty will be imposed as below, if the contractor damages any of these cables even after being advised in writing before start of the work to take adequate precaution to protect these cables. (In terms of Railway Board s letter No.2003/Tele/RCIL/1/Pt. IX dtd:24.06.2013) Cable damaged Penalty per location Only Quad cable or Signalling Cable Rs.1.0 Lakh Only OFC Rs.1.25 Lakh Both OFC & Quad Rs.1.5 Lakh Electrical Cable Rs.1.0 Lakh
Joint Procedure Order No.SECR/S&T/Policy/889, dated 05.07.2012 for undertaking earh work in the vicinity of cables issued by CSE/SECR/BSP vide letter No.SECR/S&T/Policy/959, dated 16.07.2012 , C.E s cirlular No.16 for safety precautions at work-site in proximity of running lines issued by C.E./SECR/BSP vide letter No.ENGG/TC-2/C.E.Circular/442, dated 16.06.2006 and C.E s cirlular No.31 for quality control at work sites and maintenance of registers issued by C.E./SECR/BSP vide letter No.Engg/Plg./76/CE s Circular@47"44@ dated 18.08.2011 will be applicable and binding to the contractor.
Price variation clause will be applicable in schedule-D for 6 Quad cable as mentioned below: Price Variation Clause: PVC formula for the tendered item as per Director/ IEEMA Circular No. 91/DIV/CAB/05 dated 09/10/2019, circulated by Railway Board vide letter No.2018/Sig/17/16/1 dated 29.10.2020. The formula is P = Po + 0.135(Al-Alo) + 0.139 (Cu-Cuo) + 0.515(Cc- Cco)+0.693(Fe-Feo) where: a) P is the Price payable as adjusted in accordance with the above formula and Po is the quoted price in the tender in Rs./KM. b) Al, Cu, Cc, Fe are the price of LME Aluminum Ingots, Price of Copper Wire Rod [Copper wire rod 19.6 mm is not applicable here], XLPE Compound for LV Cable and Galvanized Steel Tape (as per IS: 3975) for size 32 x 0.8 mm respectively in Rs./MT declared by IEEMA as applicable on first working day of the month, one month prior to the date the material is offered for inspection. c) Alo Cuo, Cco Feo are the price of LME Aluminum Ingots, Price of Copper Wire Rod [Copper wire rod 19.6 mm is not applicable here], XLPE Compound for LV Cable and Galvanized Steel Tape (as per IS: 3975) for size 32 x 0.8 mm respectively in Rs./MT declared by IEEMA as applicable on first working day of the month one month prior to opening of the tender. No price variation clause is applicable on any item of Schedule A ,B & C.
Earnest money:-
(a) The tender must be accompanied by desired sum (as mentioned in NIT) as earnest money in favour of F.A.& C.A.O. S.E.C.Railway Bilaspur , deposited through internet banking, Credit /debit card.failing which the tender will not be considered.
(b) The Tenderer(s) shall keep the offer open for a minimum period of Forty five days from the date of opening of the tender. It is understood that the tender documents has been sold / issued to the Tenderer(s) and the Tenderer(s), is/are permitted to tender in consideration of the stipulation on his/their part that after submitting his/their tender subject to the period being extended further, if required by mutual agreement from time to time, he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to the South East Central Railway, Should the Tenderer fail to observe or comply with the foregoing stipulation, the amount deposited, as Earnest money for the due performance of the above stipulation shall be forfeited to the Railway.
(c) If the tender is accepted, the amount of earnest money will be retained and adjust as security deposit for the due and faithful fulfillment of the contract. This amount of security deposit shall be forfeited, if the tenderer(s) /contractor(s) fail to execute the agreement bond within stipulated period after receipt of notice issued by the Railway that such documents are ready or to commence the work within 15days after receipt of the orders to that effect.
(d) The earnest money of the unsuccessful tenderer(s) will, save as herein- before provided be returned to the unsuccessful tenderer(s) within a reasonable time but the Railway shall not be responsible for any loss or depreciation that may happen to the security for the due performance of the stipulation to keep the offer open for the period specified in the tender documents or to the Earnest money while in their possession nor be liable to pay interest thereon.
(e) The successful bidder shall have to submit a Performance Guarantee (PG)within 21 (Twenty one) days from the date of issue of Letter of Acceptance(LOA). Extension of time for submission of PG beyond 21 (Twenty one) daysand upto 60 days from the date of issue of LOA may be given by theAuthority who is competent to sign the contract agreement. However, apenal interest of 12% per annum shall be charged for the delay beyond21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA.Further, if the 60th day happens to be a declared holiday in the concernedoffice of the Railway, submission of PG can be accepted on the next workingday. In all other cases, if the Contractor fails to submit the requisite PG evenafter 60 days from the date of issue of LOA, the contract is liable to beterminated. In case contract is terminated railway shall be entitled to forfeitEarnest Money Deposit and other dues payable against that contract. In case a tenderer has not submitted Earnest Money Deposit on the strength oftheir registration as a Startup recognized by Department of Industrial Policyand Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shallbe informed to this effect. The failed Contractor shall be debarred fromparticipating in re-tender for that work.Performance guarantee shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the contractor shall get the validity of PG extended to cover such extended time for completion of work plus 60 days. The value of PG to be submitted by the contractor will not change for variation upto 25% (either increase or decrease) In case during the course of execution, value of the contract increases by more than 25% of the original contract value, an additional Performance Guarantee amounting as per GCC for the excess value over the original contract value shall be deposited by the contractor. Performance Guarantee shall be released after the physical completion of the work based on the completion certificate issued by the competent authority stating that the contractor has completed the work in all respect satisfactorily.
Tenderer must submit the following documentary evidence in proof of their: -
List of Personnel Organization available on hand and proposed to be engaged for the subject work.
List of Plants and Machinery available on hand (own) and proposed to be inducted (own and hire, to be given separately for the subject work).
List of works completed Governemtn/Semi-Government (fully owned by Govt.) departments in the last Seven financial years giving description of work. Organization for whom executed, approximate value of contract at the time of award, date of award and date of schedule completion and final value of contract should also be given.
List of work on hand indicating description of work, contract value, approximate value of balance work yet to be done.
Deed of Partnership special power of attorney, if any for the work.
Joint venture/MOU/Consortium shall not be accepted.
All the payment will be made through electronic funds transfer only through any of the nationalized/scheduled bank. For this the proforma collect from this office before made first bill and is to be essentially filled up by the tenderer and submit the same to accounts department for releasing the payment.
As per Indian Railways Standard General Conditions Of Contract para 6 (a), proper survey must be done by the tenderer before submission of tender.
In case any contradiction between general condition of contract & special conditions of contract, special conditions of contract will prevail over general conditions of contract.
The Railway reserve the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder not will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest money Deposit ( EMD), Performance Guarantee ( PG and Security Deposit ( SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 ( five) years.
Reliability improvement through the provision of a standby MSDAC with critical DC track circuits at 03 Stations: Gatora, Brajrajnagar and Ib Stations of Bilaspur Division.
97-ST-Tender-2025~SECR
97-ST-Tender-2025
Open
Works - General
12 Months
Bilaspur, Chhattisgarh
₹0
₹6.0 L
11 Mar 2026
16 Feb 2026
25 Feb 2026
54 items across 4 schedules · ₹8,98,16,905.15 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of earth pit, transportation, placing and fixing of earth electrode with construction of cement encloser to Drg.No.CON/SK/T/9 and CON/SK/T/9A and drawal of GI wire wrapped on MS strip (35 x 6 mm) from earth electrode to all signalling equipments, including fixing and soldering of lugs at both end of the wire. | Numbers 40.00 | — | 1,941 | 77,640 |
| 2 | Installation, testing and commissioning of Permanent and Maintenance Free Earth pits. Installation charges : Earth pit (1 Set) It includes, 1) Civil works related to earth pit digging, PMF earth pit installation, backfilling and chamber making 2) Materials for chamber including Chamber Cover. The installation shall be done as par latest available RDSO TAN/Specification as per the advise of Railway Representative. | Numbers 50.00 | — | 5,882 | 2,94,100 |
| 3 | Excavation of trench and clearing of roots of trees, bushes, ballast and reconditioning etc., including bailing out water and disposal of extra soil. (i) all soils including soft rocky area. Depth 1.0 Mtr. & width 0.3 Mtr. | Kilometre 10.00 | — | 76,590 | 7,65,900 |
| 4 | Laying of RCC pipe including supply of required quantity at site with collars (for jointing pipe) 150 mm nominal dia to Spec.No:IS-458 in excavated trench and laying of Signalling/ Power cable/PIJF cable/ Quad cables/HDPE pipe through RCC pipe. Power cable shall be laid in the same trench alongwith signalling/Quad cables but in a separate pipe RCC pipe at track/pucca road/ Platform crossing/ level crossing gate etc. | Metre 300.00 | — | 775 | 2,32,500 |
| 5 | Laying and Fixing of galvanised iron pipe (GI Pipe) with threaded collars (for jointing pipe) of 80 mm nominal dia Spec.No.IS-1239 medium grade, on bridges, culverts, drains including supply and transportation of GI pipes and all other materials required for fixing the pipe to Drg.No.Con/SK/T/2 and drawing of Signal/Power/Quad cables inside the pipe with masonary works over the entire length of the bridge and at entry and exit of the culvert and curing for 72 hrs, drilling of holes on the pipe at 10 cm apart to be clamped 2 Mtrs apart on culvert, for the Signalling, quad, power cable. | Metre 300.00 | — | 761 | 2,28,300 |
| 6 | Laying of Signalling Cable/Power/Quad cable / PIJF cable in the excavated trench to Drg.No:CON/SK/T/5.Transportation, supply of 'U' clamps and anchoring of cable at every 10 Mtrs with 'U' clamp to Drg.No:CSTE/C/Cable/81 including back filling with excavated earth and ramming of trenches after cable laying. | Kilometre 28.00 | — | 16,740 | 4,68,720 |
| 7 | Excavation of trench and clearing of roots of trees, bushes, ballast and reconditioning etc., including bailing out water and disposal of extra soil. Hard rocky area including concreting. Cutting the masonary wall to the depth of 0.25m to 0.75m at the entry of room placing of flexible HDPE pipe or G.I.Pipe (including supply) of suitable size as per drawing No. RE/S&T/ALD/SK/161/81. | Numbers 30.00 | — | 582 | 17,460 |
| 8 | Track crossing, Road Crossing by pushing method (HDD method) at culverts/ track / pucca road crossing at a depth not less than 1 meter with reference to bottom of rail/road surface including supply of GI pipe . GI pipe with 76 mm dia, Spec. No. -1239 medium grade (for the length of pushing more than 05 meters). | Metre 1200.00 | — | 2,246 | 26,95,200 |
| 9 | Laying of half round RCC hume pipe with 150 mm dia & 1 mtr long including supply at site on single/multiple cable laid in the trench in hard rocky area as per the requirement at site and cable laying norms in IRSEM. | Metre 500.00 | — | 254 | 1,27,000 |
| 10 | Cement Concrete of proportion 1:3:6 with graded aggregate of size 25mm. and below with contractor's cement, sand & stone chips etc. including cost of suttering. | cum 70.00 | — | 2,943 | 2,06,010 |
| 11 | Transportation including loading/unloading of HDPE pipe from the stores of railway to the work site, laying of the same (with 4 mm nylon rope pre-inserted inside the HDPE pipe) in excavated trench/already laid GI/RCC pipes/tubes, jointing, levelling and end sealing the pipes. | Kilometre 1.00 | — | 7,762 | 7,762 |
| 12 | Modification/Alteration of Data Logger/RTU Digital Input, validation & yard simulation in both end station of IBS as per the direction of Rep. of Sr.DSTE/Co./BSP | Numbers 9.00 | — | 43,453 | 3,91,077 |
| 13 | Alteration/ Modifications in the existing location boxes, fixing of equipments, cable insertion, termination, wiring, testing & commissioning, two coat painting, lettering to suit the circuits as per approved wiring diagrams. This includes filling with sand and plastering the same. | Numbers 50.00 | — | 2,548 | 1,27,400 |
| 14 | Shifting of cables in roll with or without wooden drums from the nominated consignee depot or any other depot and meggering before loading and after laying, and recording the values in cable insulation register along with Rep. of Sr.DSTE/Co./BSP. | Numbers 30.00 | — | 1,282 | 38,460 |
| 15 | The excavation of pit, casting of concrete foundation including surrounding earthwork along the foundation, erection, installation and wiring of steel appartus case, fixing of terninals, fuse blocks, signal transformer, current transformer, filament switching unit, track battery chargers, adjustable/fixed resistances, choke coils, Fuses, Relays, E type locks , termination of cables, cable insertion, wiring to draw 110V AC therefore in the new apparatus case as required, testing, commissioning including subsequent alterations (if required), bunching of cables, earthing of cable, armours etc. Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anti -corrosive paint and subsequent two coatings of Alluminium paint outside and Red Oxide inside and lettering. 18 mm Hylum sheet for location box shelf and 12 mm for cable termination in location box. Steel appartus case (Large) to Drg.No. CON/SK/T/8 with 4 Nos. of foundation bolts 20mm x 460mm to Drg.No. SA-112 A/M or latest. | Numbers 50.00 | — | 17,067 | 8,53,350 |
| 16 | Alteration of existing Q-series/Composite Relay Racks and cable termination racks. | Numbers 40.00 | — | 19,785 | 7,91,400 |
| 17 | Wiring of Q-series/Composite Relay Racks and cable termination racks (New). as per the approved Circuit or as advised by Rep. of Sr.DSTE/Co./BSP. | Numbers 15.00 | — | 48,363 | 7,25,445 |
| 18 | Alteration Modification, cable termination, wiring, testing & commissioning of existing Integrated power supply panel as per approved power supply diagram and specification. The contactor has to supply arrangements at central relay room, goomties on original tracing paper of size 60cm.x42cm. with 8 computer prints in the format supplied by railways. | Numbers 12.00 | — | 7,227 | 86,724 |
| 19 | Transportation & Execution of following kinds of joints on Quad Cable using thermoshrink jointing kit. This also includes excavation of cable joint pit of size 1.2m x 1.2m x 1.0m in all types of soil for jointing of copper cables, back filling and ramming after jointing. straight through joint on Quad cable/10-20-50 pairs PIJF Cable | Numbers 15.00 | — | 1,385 | 20,775 |
| 20 | Supply and installation of class-C SPDs in common and differential mode for relay external, Axle counter, point machine and at inverter output as per Annexure-E vide RDSO Spec no. RDSO/SPN.165/2012or latest. The supplied SPDs shall have certification (CERTIFICATE ATTACHED) of IEC Standard-- National/International Labs like CE/KEMA/EAC/UL/NABL or any other accredited test lab. Insp.by Rep. of Sr.DSTE/Co./BSP | Numbers 8.00 | — | 29,383.76 | 2,35,070.08 |
| 21 | Design, Installation, testing and commissioning of MSDAC complete. (Including mounting rack and all kind of fixture for complete installation and commissioning of MSDAC). Number denotes Per DP for this item. | Numbers 217.00 | — | 2,243.78 | 4,86,900.26 |
| 22 | Horizontal direction drilling (HDD)/Trenchless digging/machine HDD drilling without damage to surface road /track for laying/insertion of CABLES/HDPE/GI/DWC pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note:-DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after CABLES/DWC/HDPE/GI pipe is laid in the bore. | Metre 845.00 | — | 545.9 | 4,61,285.5 |
| 23 | Design and development of Route Control Chart (RCC) in size B(A3) as per SEM. | Sheet 300.00 | — | 1,004 | 3,01,200 |
| 24 | Design and development of Circuit Diagram/Logic in size B(A3) as per SEM sheet including contact analysis. | Sheet 350.00 | — | 1,004 | 3,51,400 |
| 25 | Other Signalling Drawing in size U(A3) as per SEM sheet (wiring in location box) | Sheet 350.00 | — | 1,004 | 3,51,400 |
| 26 | Miniature diagram in size B(A3) | Numbers 3.00 | — | 1,004 | 3,012 |
| 27 | Design & development of cable corage plan in size U(A3) as per SEM. | Station 3.00 | — | 2,511 | 7,533 |
| 28 | Design & development of cable route plan in size U(A3) as per SEM. | Station 3.00 | — | 1,256 | 3,768 |
| 29 | Development of SIP based on ESP on size W(A1) or as advised by Representative of Sr.DSTE/Co/BSP | Station 3.00 | — | 5,024 | 15,072 |
| 30 | Design and development of Station working rule Diagram (SWRD) based on SIP of station in size U(A3) as per SEM. | Station 3.00 | — | 5,024 | 15,072 |
| 31 | Drafting, correction and editing and binding SWR/GWR/Temporary Working Rule | Per Page 319.00 | — | 75.6 | 24,116.4 |
| Schedule total | ₹1,04,11,052.24 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .