2 Jun 2022, 6:55 pmClosed
Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Mechanical work to be carried to be carried out at lift irrigation schemes (Zehanpora and Novla).
2022_IFC_171217_9
eNIT 17 of 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
5 documents required · 5 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
4 Jun 2022
28 May 2022
3 Jun 2022
28 May 2022
2 Jun 2022
28 May 2022
Amount
Complete dismantling of 02 cusec double stage Hz split casing pump unit no.02 by way of disconnecting all leads from motor and marking the terminals , uncoupling of motor from the pump. Disassembling , dismantling and segregation of various pump parts such as shaft and sleeves, fastners etc
Providing and fitting of ball bearing 3309 of FAG/Reputed make with adequate greasing
Assembling of double stage Hz split casing pump after cleaning of all parts through petrol, coupling and alignment with motor connecting of motor leads and tested on full load
Providing and fitting of cooling pipe with adopter with the help of skilled labour, other tools& tackles
Providing of palmative packing 1 inch for pumping unit
Repairs to 200mm dia suction pipe with attached foot valve by way of dismantling pipe from flange with the help of skilled labour by opening nuts& bolts , then shifting of pipe to working place with the help of manual labour . The job includes the charge for cutting of suction pipe above 2 feet from foot valve with the help of cutter, then p/fitted flanges (02 no) on both cutted portion & fitted it properly again for easily dismantled of foot valve during suction failure. The job also includes the charge for p/f of new nuts& bolts (3kg), washers , welding set, D.G set gas cutter, etc for the completion of work. After completion of work suction line should be tested on full load
Providing and fitting of 25mm dia High pressure ball valve in 200mm dia M.S rising main for priming process with the help of skilled labour , welding process, nipple etc for the completion of work
Repairs to 05 cusec end suction pump single stage of lift irrigation scheme Novla by way of disconnecting all leads from motor and marking the terminals , uncoupling of motor from the pump. Disassembling , dismantling and segregation of various pump parts such as shaft and sleeves, fastners etc
Assembling of double stage Hz split casing pump after cleaning of all parts through petrol, coupling and alignment with motor connecting of motor leads and tested on full load
Providing and fitting new nuts & bolts of pump casing
Repairs to lock nut of impeller by way of making new threads in shaft with the help of skilled labour , then fitted bolt in it carefully for fitment of impeller . The job include the charge of new nut & bolt, thread machine etc for the completion of work
M/S EURO LIGHT ENTERPRISES
SULTAN ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .