| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.0 L+₹9,408 (4.83%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.2 L+₹24,067.50 (12.4%)Rejected-Finance SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.4 L+₹47,202.50 (24.2%)Rejected-Finance NULL | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹3,494
Closing Date
5 Mar 2021, 4:00 pmClosed
Executive Engineer
The Executive Engineer, PWD Roads division Kozhikode
Investigation work for the Re Construction of bridge
2021_PWD_419832_1
D1/TN/100/2020-21
Open Tender
Civil Works - Bridges
Item Rate
90 days
Thiruvambady
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹3,494
Yes
6 Jul 2021
27 Feb 2021
8 Mar 2021
27 Feb 2021
5 Mar 2021
27 Feb 2021
Amount
Investigation for Bridge
56.12.a : Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
56.14.b : Cross section details:- Thodu.Cross section details:- Thodu.
56.15.b : Hydraulic Velocity Calculation:- ThoduHydraulic Velocity Calculation:- Thodu
Traffic Diversion
8.6 : Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 High Intensity Micro Prismatic (Type IV) grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 High Intensity Micro Prismatic (Type IV) grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
AFNAN ASHRAF V
AA AND S CONSTRUCTIONS
G S Infrastructure
Bidder Name
G S Infrastructure
AFNAN ASHRAF V
AA AND S CONSTRUCTIONS
ANAS K.P.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_595980.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .