| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.5 L+₹1.1 L (3.72%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹29.6 L+₹1.2 L (4.05%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹31.9 L
EMD Value
₹50,000
Closing Date
22 Oct 2020, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/O The EXecutive Engineer Irrigation Division TVPM,Public office building compound Palayam TVPM
Restoration work
2020_Irrig_391448_1
28/EE/2020-21
Open Tender
Civil Works - Others
Item Rate
180 days
Pallichal
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
online
₹50,000
Yes
10 Dec 2020
13 Oct 2020
28 Oct 2020
13 Oct 2020
22 Oct 2020
14 Oct 2020
14 Oct 2020 - 22 Oct 2020
60 days
Amount
Ch from 28.000Km to 28.200
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25884/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 28.400Km to 28.600Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25885/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 28.800Km to 29.000Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25887/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 29.200Km to 29.400Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25889/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 29.400Km to 29.600Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25890/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No of lead=1) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 29.600Km to 29.800Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25891/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=1) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 29.800Km to 30.000Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25892/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=1) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.000Km to 30.150Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25893/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=1) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.150Km to 30.300Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25894/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=4) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.300Km to 30.450Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25932/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=4) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.450Km to 30.600Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25939/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=4) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.600Km to 30.750Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25944/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=4) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.750Km to 30.900Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25948/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=4) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 30.900Km to 31.050Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25949/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=4) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 31.050Km to 31.200Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25956/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=2) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 31.200Km to 31.350Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25957/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point(No. of lead=1) . If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 31.350Km to 31.700Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25958/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point. If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 31.700Km to 32.050Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25959/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point. If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 32.050Km to 32.400Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25964/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point. If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 32.400Km to 32.750Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25968/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point. If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 32.750Km to 33.100Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25969/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point. If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch from 33.100Km to 33.300Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od25970/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means for desilting the canal over areas including carrying and conveying the excavated material from the source to the vehicle/access point. If the soil is in good condition the cost of the same shall be recovered from the contractor etc complete as per the direction of departmental officers at site .
Ch 28.200Km to 28.400Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od28913/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansfor desilting the canal over areas including carrying and conveying the excavated material from the sourceto the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from thecontractor etc complete as per the direction of departmental officers at site
Ch 28.600Km to 28.800Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od28913/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansfor desilting the canal over areas including carrying and conveying the excavated material from the sourceto the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from thecontractor etc complete as per the direction of departmental officers at site
Ch 29.000Km to 29.200Km
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od28913/2020_2021/IA : Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansfor desilting the canal over areas including carrying and conveying the excavated material from the sourceto the vehicle/access point . If the soil is in good condition the cost of the same shall be recovered from thecontractor etc complete as per the direction of departmental officers at site
G.ROBINSON
T BINU KUMAR
Bidder Name
G.ROBINSON
T BINU KUMAR
REVATHY CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_556821.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .