Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.5 L+₹37,502.58 (1.49%)Rejected-AOC ETTILOLI HOUSE VAKKADPPURAM P O KARAKURUSSI PALAKKAD DIST PIN 678595 | KARAKURUSSI | PALAKKAD | KERALA | 678595 | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.9 L+₹76,098.95 (3.03%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹33.9 L
EMD Value
₹50,000
Closing Date
18 Jan 2024, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MI Division Palakkad
Office of Executive engineer, MI Division Palakkad
GENERAL-Vallithode at Parumanchalla- Protection works of Vallithode at Parumanchalla in Kozhinjampara Grama Panchayath in Palakkad District.-General Civil Work
2024_Irrig_642950_1
IRR/IA/TR/8290/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Kozhinjampara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
21 Feb 2024
11 Jan 2024
22 Jan 2024
11 Jan 2024
18 Jan 2024
11 Jan 2024
11 Jan 2024 - 15 Jan 2024
Amount
Vallithode at Parumanchalla
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD22344/2022-2023:Providing and laying in cement concrete 1:2:4 without the cost for vibrator(cost for item 4.1.3= 7184.64 deducting 24.50 Rs as vibrator hire charge .245 1percent 15% 3.106 cost index 8.827 Rs 7147.393
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD26632/2023-2024:Providing and laying 300mm dia RCC pipe to lines and levels in canal, outlet and inlet of ponds for smooth conveyance of irrigation water
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Tractor cross
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD22343/2022-2023:Providing and laying cement concrete 1 2 4 without the cost of vibrator (cost of item = Rs 7184.64 deducting Rs 24.50 as vibrator hirecharges water charges 1% CP and OH 15% cost index 8.827 Rs 7147.393
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Moideen.E
SURESH KUMAR A
Bidder Name
manoj.k
Moideen.E
SURESH KUMAR A
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_982629.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .