Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | Admitted-Finance |
Tender Value
₹41.1 L
EMD Value
₹82,210
Closing Date
5 Sept 2023, 3:00 pmClosed
The Chief Mechanical Engineer
O/o The Chief Mechanical Engineer, Chennai Port Authority, 7th floor, Centenary Building, No.1 Rajaji Salai, Chennai 600 001
Revamping of Electrical wiring system in Shri.V.Selvaraj, IAS Community Hall, supply and installation of 2 nos. main distribution boards in community hall and 3rd zone, and supply and installation of 2 nos 20 mtr high mast towers in Sports Complex
2023_ChPT_767185_1
MEE/52/2023/Dy.CME MP and OH
Open Tender
Miscellaneous Services
Works
60 days
Chennai Port Authority
As per Tender document
15 documents required · 15 mandatory
₹0
₹82,210
17 Oct 2023
17 Aug 2023
6 Sept 2023
23 Aug 2023
5 Sept 2023
23 Aug 2023
Removing of existing old main switch board, Distribution boards, wiring pipes, exhaust fans, wall mounting fans etc., from community Hall and same to be handed over to 11KV substation at T.H.Colony.
Removing of existing old and damaged1 No. Main LT panel board and wall fixed MCCBs from 3rd Zone EB room and same to be handed over to 11 KV Sub-station at T.H.Colony.
Design, Fabrication, Supply, Installation, testing and commissioning of new Indoor 10 way 400 Amps LT cubical main switch board at 3rd Zone EB room of T.H.Colony with 2 incomers and 8 outgoings as detailed in Schedule-‘A’.
Design, Fabrication, Supply, Installation, testing and commissioning of new Indoor 9 way 400 Amps LT cubical main switch board at community hall electrical room of T.H. Colony with 2 incomers and 7 outgoing sas detailed in Schedule-‘A’.
Supply of FRP/PC Distribution board with enclosures shall be comprising with suitable way of 1 No. 63 Amps, C-Series, 4 Pole, MCB as incomer, 4 Nos. 16 Amps, C-Series, Single Pole, MCBs as outgoings, circuits with suitable copper wire/bus bars for each phase and neutral along with all other components and accessories etc. as detailed in Schedule-‘A’
Installation of the Distribution Board (mentioned under Sl.No.5) at the hall and Portico in the Ground floor of the Community Hall including making proper wiring as detailed in Schedule ‘A’
Supply of FRP/PC Distribution board with enclosures shall be comprising with suitable way of 1 No. 63 Amps, 4 Pole, C-Series MCB as incomer, 3 Nos. 20 Amps, Single Pole, C-Series MCBs, 3 Nos. 16 amps, Single Pole, C-Series MCBs and 3 Nos. 10 amps, Single Pole, C-Series MCBs as outgoings, circuits with suitable copper wire/bus bars for each phase and neutral along with all other components and accessories etc., as detailed in Schedule-‘A’
Installation of the Distribution Board (mentioned under Sl.No.7) at dining hall in the ground floor and First floor of the Community Hall including making proper wiring as detailed in Schedule ‘A’
Supply of 1200 mm sweep, double ball bearing brown colour ceiling fan suitable for 230 V AC operation with step type electronic fan regulator as detailed in Schedule-‘A’
Installation of 1200 mm sweep, double ball bearing brown colour ceiling fan suitable for 230 V AC operation with step type electronic fan regulator in the stage, dining hall, electrical room, bride room, bridegroom room in ground floor and hall, seven rooms in the first floor as detailed in Schedule ‘A’.
Supply of 18” (450) mm dia, 230 Volt AC, 1400 rpm Heavy duty high speed exhaust fans as detailed in Schedule-‘A’
Installation of 18” (450) mm dia, 230 Volt AC, 1400 rpm Heavy duty high speed exhaust fans in the Hall and Kitchen of community hall as detailed in Schedule ‘A’.
Supply of high speed 12” (300) mm dia exhaust fans as detailed in Schedule-‘A’
Installation of high speed 12” (300) mm dia exhaust fans in the Toilets of community hall as detailed in Schedule ‘A’.
Supply of 450 mm high speed 1400 rpm 230 V Wall mounting Fan as detailed in Schedule-‘A’
Installation of 450 mm high speed 1400 rpm 230 V Wall mounting Fan in Community Hall area of community hall as detailed in Schedule ‘A’.
Supply of LED 1 x 20 Watts, 230 V batten type cool white tube light fitting as detailed in Schedule-‘A’
Installation of LED 1x20 Watts, 230 V batten type cool white tube light fitting in Hall, stage area, passage, dining, Kitchen and other rooms in Ground and First floor of community hall as detailed in Schedule ‘A’.
Supply of 1x30 watts LED flood light with suitable & adjustable wall mounting fittings as detailed in Schedule-‘A’
Installation of 1x30 watts LED flood light with complete wiring in dining hall for table tennis court of community hall as detailed in Schedule ‘A’.
Supply of GI Cylindrical Post of 2 Mtr. length x 3” Dia as detailed in Schedule-‘A’
Installation of GI Cylindrical Post in front of Babu Jagajeevan ram statue at a depth of 0.5 mtr. in the ground with proper cement concrete foundation as detailed in Schedule-‘A’
Supply of 1x50 W LED focus light fittings with suitable and adjustable wall mounting fittings as detailed in Schedule-‘A’.
Installation of 1x50 W LED focus light fittings with complete wiring on the GI cylindrical post as detailed in Schedule-‘A’
Supply of 1x100 watts LED flood light fittings with 0.75 mtr. length Galvanized Arm as detailed in Schedule-‘A’ and as per drawing enclosed.
Installation of 1x100 watts LED flood light fittings with 0.75 mtr. Length galvanized arm with complete wiring around the Community Building entrance and outside wall of community hall as detailed in Schedule ‘A’. and as per drawing enclosed.
Supply of 2 Nos. 120 W LED focus light fitting with 0.75 mtr. length galvanized twin arm in single post with suitable GI clamps as detailed in Schedule-‘A’ and as per drawing enclosed.
Installation of 2 Nos. 120 W LED focus light fitting in the 0.75 mtr. length galvanized twin arm in single post with suitable GI clamps in the existing street light post, with complete wiring by 3x2.5 Sq.mm round sheathed flexible copper conductor wire from FRP junction box to 120 W LED flood light fittings at Babu Jagajeevan ram sports complex entrance area / Kabadi Court. The junction box will be mounted on the post at a height of 1.5 M from the ground level. The necessary holes to be provided in the post to lay the wire from the junction box to LED light fitting as detailed in Schedule-‘A’ and as per drawing enclosed. Note : 9 Nos. FRP junction box will be provided by ChPA
Foundation of GI Street Light Post and Installation of GI Street Light Post at sports complex entrance area with proper cement concrete foundation and suitable size of base bolt and nuts as detailed in Schedule-‘A’ Note : 2 Nos. GI post will be provided by ChPA
Supply of 3 Nos. 120 W LED focus light fitting with 0.75 mtr. Length galvanized triple arm in single post with suitable GI Clamps as detailed in Schedule-‘A’ and as per drawing enclosed.
Installation of 3 Nos. 120 W LED focus light fitting in the 0.75 mtr. length galvanized triple arm in single post with suitable GI Clamp in the existing street light post, with complete wiring by 3x2.5 Sq.mm round sheathed flexible copper conductor wire from FRP junction box to 120 W LED flood light fittings at front and rear side of the Babu Jagajeevan ram statue at sports complex entrance area. The junction box will be mounted on the post at a height of 1.5 M from the ground level. The necessary holes to be provided in the post to lay the wire from the junction box to LED light fitting as detailed in Schedule-‘A’ and as per drawing enclosed. Note : 2 Nos. FRP junction box will be provided by ChPA.
Supply of 1x150 watts LED flood light fittings with suitable and adjustable wall mounting fittings as detailed in Schedule-‘A’
Installation of 1x150 watts LED flood light fittings with complete wiring in the Hall and Stage area of community hall as detailed in Schedule ‘A’.
Supply of 20 Ltr. Capacity, 2000 W, 230Volt, 50Hz, AC, Five star power rating Geyser with necessary Hot/Cold Hose Pipe fittings, wall mounting Housing material of Stainless Steel as per Schedule-‘A’
Installation of 20 Ltr. capacity, 2000 W, 230Volt, 50Hz, AC Geyser with necessary Hot/Cold Hose pipe fittings and wall mounting housing materials of stainless steel in Bath rooms of the Ground and first floor of Community Hall as detailed in Schedule ‘A’.
Supply of all materials and accessories to carry out the surface / concealed conduit wiring by suitable size of PVC trunking box with 3 runs of 1.5 sq.mm. for phase, neutral and earth PVC insulated FR rated copper wire for ceiling fans, wall mounted fans, exhaust fans, light fittings, LED floor light fittings, etc., through connected junction box / inspection box along with 5A modular flush type control switch along with base plates and ceiling rose including terminations wherever necessary from modular type sub switch board in each room to individual points as detailed in Schedule-‘A’
Supply of 5 Amps flush type modular switch, modular type switch board and socket outlet to be mounted in the modular type switch board itself and wiring to the socket for wall mounting fans in the community hall area as detailed in Schedule-‘A’
Supply of all materials and accessories for 15 A / 5 A flush type modular switch with socket outlet along with base plates and same to be mounted in the modular type switch board itself and wiring to the socket.
Supply and fixing of all materials and accessories for 15/5 Amps flush/modular type switch and socket outlet along with base plates supply along with suitable switch box for Geysers of the bath rooms in Ground and First floor of Community Hall.
Supply of all materials and accessories to carry out the surface Trunking wiring by using suitable size of PVC Trunking box with 4 Runs of 6 Sq.mm. and 1 Run of 2.5 Sq.mm for earth PVC insulated FR unsheathed copper conductor wires from Main Switch Board in EB room to 5 Nos. Distribution Boards in Ground and First floor of Community Hall as detailed in Schedule-‘A’
Supply of all materials and accessories to carry out the surface trunking wiring by using suitable size of PVC Trunking box and drops with suitable PVC Trunking box with 2 Runs of 4.0 Sq.mm. and 1 Run of 2.5 Sq.mm for earth PVC insulated FR unsheathed copper conductor wires from Distribution Board to Switch Boards in Ground and First floor of Community Hall as detailed in Schedule-‘A’
Supply of all materials and accessories to carry out the surface / conduit wiring by using suitable size of PVC Trunking box and drops with suitable PVC Trunking box with 2 Runs of 4.0 Sq.mm. and 1 Run of 2.5 Sq.mm for earth PVC insulated FR unsheathed copper conductor wires from Switch Board to 15/5 amps Socket outlet point for 4 Nos. Geyser in Bath rooms of Ground and First floor of Community Hall as detailed in Schedule-‘A’
Supply of all materials and accessories to carry out the surface Trunking box wiring by using suitable size of PVC trunking with 3 runs of 1.5 sq.mm. for phase, neutral and earth PVC insulated unsheathed copper FR wire from 16 amps MCBs in Distribution board to surrounding LED focus light fittings and from 16 amps MCBs in Distribution board to switch box in the rooms in the ground and floor of community hall as detailed in Schedule-‘A’
Supply of 3 ½ Core x 185 Sq.mm. LT UG Alu. armoured cable as detailed in Schedule-‘A’.
Laying of 3 1/2 Core x 185 Sq.mm. LT UG Alu. armoured cable from 3rd Zone EB switching room to main switch board at community hall EB room in ground floor and from main switch board at community hall EB room in ground floor to sports complex pillar box as detailed in Schedule-‘A’
Supply of 4 core x 25 Sq.mm. LT UG Alu. Armoured cable for HMT as detailed in Schedule-‘A’
Laying of 4 core x 25 Sq.mm. LT UG Alu. Armoured cable from sports complex gallery room No.7 main switch board to HMT at south west side of sports complex as detailed in Schedule-‘A’ and as per drawing enclosed.
Laying of 4 core x 25 Sq.mm. LT UG Alu. Armoured cable from sports complex gallery room No.7 main switch board to HMT at north west side in the sports complex as detailed in Schedule-‘A’.
Laying of 4 core x 25 Sq.mm. LT UG Alu. Armoured cable from sports complex gallery room No.7 Main switch board to existing street light post No.1 to 9 in the sports complex by cable loopin and loopout and from HMT No.3 in the sports complex ground to the existing street light post No.10 to 13 in the sports complex by cable loopin and loopout as detailed in Schedule-‘A’ and as per drawing enclosed.
Supply of all materials of 2 Nos. earth pit and earthing for each LT Main Switch Boards and 2 Nos. earth pit and earthing for each HMTs as detailed in Schedule-‘A’
Erection of earthing of 2 Nos. earth pit for each LT Main Switch Boards as detailed in Schedule ‘A’.
Erection of earthing of 2 Nos. earth pit for each HMTs. 1 No. earthing for Lightning arrester and another one for electrical circuit as detailed in Schedule ‘A’.
Excavation of soil for a depth of 3 feet x 1 feet breadth from 3rd zone EB switch room to community hall EB room, from community hall EB room to sports complex pillar box and from sports complex gallery room no.7 main switch board to 20 mtrs. High Mast Tower at South west side in Sports Complex and from sports complex gallery room no.7 main switch board to 20 mtrs. High Mast Tower at North west side in the Sports Complex and refill the trench with soil and compacting as details in Schedule ‘A’
Testing and commissioning of entire work for revamping of electrification work in Community Hall.
Charges for design, transportation to site and supply of 20M high mast tower comprising of the High mast structure complete with Lantern Carriage, 6mm Stainless steel wire rope, 5 core x 4.0 Sq.mm copper conductor EPR (Ethylene propylene Rubber) coated flexible trailing cable, Aviation luminaries, Lightning finial and Local fibre glass feeder panel for high mast with timer panel as detailed in Schedule ‘Á’.
Charges for providing foundation for the erection of 20 M high mast tower.
Cost of erection of 20 Mtrs. HMTs over the corresponding foundation of 20M high mast.
Supply of 1x400 W, 120 lum/w LED Flood light fitting for 20 Mtrs. HMT with all other accessories as per Schedule ‘A’.
Installation 1x400 W, 120 lum/w LED Flood light fitting for 20 Mtrs. HMT with all other accessories as per Schedule ‘A’.
Supply & laying of 3 core 2.5 sq. mm copper cable of 1100V from feeder pillar at each high mast to winch drum.
Charges for trials, testing and commissioning of entire work
Naturetech Infrastructure PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .