Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Fee/PreQual/Technical/Finance | -19.99% | ₹10.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.6 LAdmitted-Fee/PreQual/Technical/Finance AT PESHAM PO BIRRI PS BIRRI GIRIDIH JHARKHAND 815316 | GIRIDIH | JHARKHAND | 815316 | -18.06% | ₹10.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | -17.67% | ₹10.6 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.9 L
EMD Value
₹26,000
Closing Date
15 Jul 2026, 5:00 pmClosed
DISTRICT ENGINEER
ZILA PARISHAD CHAIBASA
CONSTRUCTION OF BAZZAR SHED AT ICHAKUTI BAIPI IN CHAKRADHARPUR BLOCK
2026_ZPWSS_116010_1
ZP/CHAIBASA/04/2026-27 GR-24
Open Tender
Civil Works
Works
60 days
CKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,250
Yes
₹26,000
Yes
17 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (Vide classification of soil item-A) and disposal of excaveted earth as obtained to a distance upto 50M including all lifts levelling,ramming the foundation trenches, removing roots of trees,shrubs all complete as per approved design,building specification and direction of E/I. | 1 | CUM | 151.82 | ₹151.67 |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l. | 44.72 | CUM | 589.51 | ₹26,362.89 |
| 3 | Providing designation 75B one brick flat soilding joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. | 119.33 | SQM | - | - |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pillers, columns, pires, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering shuttering and finishing:1:1.5:3 (1 cement: 1.5 coarse sand(zone III) : 3 graded stone (aggregate 20 mm normal size). | 42.35 | CUM | 5,989.72 | ₹2,53,664.64 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 32.33 | SQM | 194.5 | ₹6,288.18 |
| 6 | Providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | 1 | MT | 80,879.07 | ₹80,879.07 |
| 7 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. | 2.94 | CUM | 5,244.08 | ₹15,417.6 |
| 8 | MS FLAT 30 X 6 MM WIND TIE | 1.27 | MT | 62,425 | ₹79,279.75 |
| 9 | Hot finished welded type tubes | 1,050 | KG | 158.76 | ₹1,66,696.61 |
| 10 | Structrual steel work rivited, bolted or welded in built up section, trusses and framed work, including cutting, hosting, fixing in position and applying a primer coat of shed. | 183.2 | SQM | 109.19 | ₹20,003.14 |
stage.html
html • 0.02 MB
finance_156832.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
SBD01.pdf
Tender Documents • 1.09 MB
BOQ_156832.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].