Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC HOUSE NO 397VTIPPLER DAFAI SHIVPUR SHIVPUR CHURCHA TIPPLER DAFAI KORIYA CHHATTISGARH 497339 UDYAM CG 11 0001978 | KOREA | CHHATTISGARH | 497339 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical CHURCHA COLLIERY WARD NO 14 CHURCHA COLLIERY P O CHURCHA COLLIERY DISTT KORIYA C G | BAIKUNTHPUR | KORIYA | CHHATTISGARH | 497339 | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical MANENDRAGARH DISTRICT MCB C G | MANENDRAGARH | KOREA | CHHATTISGARH | - | Rejected-Technical L3 |
Tender Value
Refer Docs
EMD Value
₹56,400
Closing Date
13 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Maintenance of 1200/1000 mm wide main double storey belt (G Belt) and Mandir Belt (E Belt) conveyor in surface at West Block of Churcha Mine (RO).
2023_SECL_276709_1
SECL/BKP/SO(M)/22-23/CW/eT/80 Date 29.03.2023
Open Tender
Civil Works - Others
Item Rate
365 days
West Block of Churcha Mine (RO)
Please refer Tender document
3 documents required · 3 mandatory
₹56,400
10 May 2023
29 Mar 2023
15 Apr 2023
30 Mar 2023
13 Apr 2023
30 Mar 2023
30 Mar 2023 - 6 Apr 2023
Amount
Item Description/ Heading
Cleaning of spillage coal and maintenance of 1200mm / 1000mm / 800mm wide belt conveyors at surface for 600m length. Work involved - Cleaning of spillage coal, leveling of belt, alignment of belt, replacement of top roller, bottom roller, channel, carrier, stool etc. and stacking damaged item as directed, joint repairing & belt fastening & greasing and maintenance of drive head discharge and tail end. Average 3.00 skilled manpower and 6.00 un-skilled manpower involved in this work on daily basis. Total 935.91 skilled manpower and 1872.09 un-skilled manpower. Grand total = 2808.00 manpower involved for a period of 312 working days.
Total impact of GST for the purpose of CTC
ravindra kumar gupta
TETAR CONSTRUCTION PRIVATE LIMITED
stage.html
html • 0.04 MB
techsummary_286476.pdf
PDF • 0.20 MB
finsummary_286476.pdf
PDF • 0.46 MB
AOC6Cw80.pdf
PDF • 1.96 MB
finance_286476.pdf
PDF • 0.27 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .