Superintending Engineer, OandM Circle, 400 KV Substation Campus, Kashipur -244713
Work of replacement of defective oil level indicator (MOG), Air Cell and other miscellaneous works of 40 MVA transformer-Ist (CGL make) at 132 KV Sub-Station Jaspur under 220 KV OandM Division, Mahuakheraganj
2025_PTC12_84693_1
SE/OandM/PTCUL/KSP/11/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Kashipur
4 documents required · 4 mandatory
₹1,180
EE, 400KV OandM Division, Kashipur
₹67,000
Kashipur
5 Aug 2025
7 Jun 2025
8 Jul 2025
7 Jun 2025
7 Jul 2025
7 Jun 2025
7 Jun 2025 - 7 Jul 2025
23 Jun 2025
Amount
Supply
Oil Level Indicator (MOG) with 2 micro switches suitable for Aircell Conservator. Vertical mounting and 1000mm conservator dia along with float assembly with CCU of 2 No's 4-20mA DC outputs along with Remote indicator of Model: 2245M-T4. Mounting angle is 45 Deg. as per site requirement.
Oil Temperature Indicator with 2 changeover switches (Option 2, Switch contact rating : 15A@250V AC, 5A@250V DC), 15 meters capillary length with builtin RTD sensor and internal CCU and external remote indicator of 2 No's of 4-20mA DC output Model: 2245H-T2. Range 0-150 deg C. Union = 1/2" BSP Female.
Winding Temperature Indicator with 4 changeover switches (Option 2, Switch contact rating : 15A@250V AC, 5A@250V DC), 15 meters capillary length with builtin RTD sensor and internal CCU and external remote indicator of 2 No's of 4-20mA DC output Model: 2245H-T2. Range 0-150 deg C. Union = 1/2" BSP Female.
Air Cell (REINFORCEMENT ON AIRCELL BOTTOM PATCH G + 600 X 400 WIDE TO PREVENT DAMAGED BY MOG ARM RUBBING)
LV bushing set of Rated Voltage-52KV, Rated Current-1250Amp having Standard-Is:2099/IEC:137 Mounting Angle-<30* From I Having Weight-60 Kg Approx set
Description of Work / Item(s)
Amount
Erection
Required Oil Transfering work of 40 MVA Transformer-1st CGL make from OLTC, Conservator & 1/2 Main Tank to empty drums seperately with proper arrangement including the cost of labour and T&P 132KV Substation Jaspur.
Dismantling work of Conservator tank with the Help of Hydra/ manual including the cost of labour and T&P.
Removing of old/damaged air cell and relpacement of air cell to new by charging of air cell with Nitrozen or dry air including all material, labour and T&P complete work in all respect.
Erection work of Conservator tank with the Help of Hydra/manual including the cost of labour and T&P complete work in all respect.
Opening of OLTC side cover safely. Cleaning of OLTC conservator by dry cloth. Checking of oil level and damage parts and replacing/repair for the same including all material, labour and T&P complete work.
Replacement of LV deteriorated/leaked bushing with new bushing with opening of jumpers & Re-jumpering of bushing with the help of Hydra/manual including the cost of labour and T&P complete work in all respect.
Attending of oil leakage from various points of 40MVA Transformer-1st after cleaning the oily surface with proper oil cleaning agent and applying plastic steel putty SF, titanium putty and silite sealent including cost of all material, labour and T&P complete work in all respect as per direction of Engineer incharge.
Replacement of WTI & OTI with calibration and testing of OTI & WTI including all material, labour and T&P complete work in all respect.
Replacement of Magnetic Oil Level Gauge system (MOG) with connection of cables and testing including all material, labour and T&P complete work in all respect.
Safely open trench cover for cable laying from control room to 40 MVA Transformer-1st at 132 Switchyard and trench closed after completion of work.
Providing and laying of 6C x 2.5 mm armored copper control cable from control room to 40 MVA Transformer-1st including ferruling, lugging, termination on both sides and dressing etc.
Filling and centrifusing of oil till satisfactory BDV results are achived and filling up to oil in main tank and topping conservators tank including all material, labour and T&P complete work in all respects.
Complete washing of 40MVA Transformer-1st CGL make with its all accessories through cotton cloth/brushes and approved chemical and cleansers to removing oil stains etc.
Description of Work / Item(s)
Amount
Total Part-A (Supply ) from BoQ1 sheet WITHOUT GST
Total Part-B (Erection) from BoQ2 sheet WITHOUT GST
Add GST* Amount on (Total of Part-A + Total of Part-B above)
MAYANK ELECTRICAL WORK (BID ID -388871)
KARAN SUPER ELECTRICAL WORKS (BID ID -388760)
MAYANK ELECTRICAL WORK (BID ID -388871)
KARAN SUPER ELECTRICAL WORKS (BID ID -388760)
MAYANK ELECTRICAL WORK (BID ID -388871)
KARAN SUPER ELECTRICAL WORKS (BID ID -388760)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .