| 1 | L1₹91.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹92.3 L+₹93,543.37 (1.02%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ASHIK P MUHAMMED L2 | Mathew Thomas L1 |
|---|---|---|---|---|---|
| 1.00Apendix A: Reactive maintenance works | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 5.7 | cum | 2,558 ₹14,580.6 | 2,500 ₹14,250 Lowest |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 5.7 | cum | 5,588 ₹31,851.6 | 5,471 ₹31,184.7 Lowest |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,420 | sqm | 12 ₹17,040 Lowest | 12 ₹17,040 Lowest |
| 1.00 | OD186952/2024-2025:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,
laying and rolling with a three wheel 8-10 kN static rollerand finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual
Means | 1,420 | sqm | 280 ₹3,97,600 Lowest | 282.48 ₹4,01,121.6 |
| 1.00 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material | 2,100 | sqm | 480 ₹10,08,000 | 470.5 ₹9,88,050 Lowest |
| 1.01 | OD186951/2024-2025:Providing and fixing of DLP board for Running contract work with non -retro reflectorized vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composite material sheeting 4 mm thick with area not exceeding 0.90 sqm, with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe
pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting al exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. | 1.46 | sqm | 6,900 ₹10,101.6 | 6,827.08 ₹9,994.85 Lowest |
| 1.01 | OD187278/2024-2025:Providing and fixing vinyl sticker in existing DLP board including lettering and printing | 16.1 | sqm | 1,065 ₹17,150.76 | 1,034.71 ₹16,662.97 Lowest |
| 2.00Apendix B -Pre Monsoon works | |||||
| 2.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1.1 | Hectare | 58,863 ₹65,043.62 | 57,627.78 ₹63,678.7 Lowest |
Tender Value
₹93.3 L
EMD Value
₹50,000
Closing Date
29 Jul 2025, 4:00 pmClosed
Superintending Engineer,PWD Roads Central Circle
Superintending Engineer,PWD Roads Central Circle,Aluva
pre-monsoon workssuch as Pothole filling ,clearing drain and culvert, clearing vegetation, rectification and refurbishment of sign boards, rectification of drain, pruning of treebranches etc.
2025_PWD_777667_1
PWD/RB/TR/21372/2024_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Thodupuzha
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
26 Sept 2025
18 Jul 2025
1 Aug 2025
18 Jul 2025
29 Jul 2025
18 Jul 2025
18 Jul 2025 - 29 Jul 2025
Amount
Apendix A: Reactive maintenance works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD186952/2024-2025:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static rollerand finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
OD186951/2024-2025:Providing and fixing of DLP board for Running contract work with non -retro reflectorized vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composite material sheeting 4 mm thick with area not exceeding 0.90 sqm, with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting al exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
OD187278/2024-2025:Providing and fixing vinyl sticker in existing DLP board including lettering and printing
Apendix B -Pre Monsoon works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD186962/2024-2025:Supply Granular material at site
OD186964/2024-2025:Engaging coolie
OD186961/2024-2025:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD186959/2024-2025:Engaging JCB including fuel charges, Bata of driver and other all expenditure including etc. complete
OD186963/2024-2025:Supplying instant road repair mix in packets which contains 25 kg of compounds
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
OD186960/2024-2025:FILLING up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of Bitumen Emulsion (RS) using 36mm departmental broken stone and compacting with power roller to get a compact surface.. etc complete
Appendix C: Protective/Preventive maintenance works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD186953/2024-2025:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static rollerand finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.4.1:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 90 cm equilateral triangle
8.15:Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)
Appendix D: Emergency works
OD186956/2024-2025:Engaging excavator (JCB) for various purposes
OD186957/2024-2025:Engaging small tipper for removing the excavated materials , debris for various premonsoon works
OD186955/2024-2025:Engaging mazdoor
OD186954/2024-2025:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.
OD186958/2024-2025:Supply of granular material at site
ASHIK P MUHAMMED (BID ID -2263725)
Bidder Name
Mathew Thomas
ASHIK P MUHAMMED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1272048.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .