| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹3.1 L+₹18,169.39 (6.12%)Rejected-AOC | L2 | Rejected-AOC 2nd | |
| 3 | L3₹3.3 L+₹28,260.35 (9.52%)Rejected-AOC | L3 | Rejected-AOC 3rd | |
| 4 | L4₹3.8 L+₹85,261.27 (28.7%)Rejected-AOC VEENNIROTH HOUSE KUTTIATTOOR PO | L4 | Rejected-AOC 4th |
Tender Value
₹4.7 L
EMD Value
₹11,648
Closing Date
21 Oct 2022, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, LBC Sub Division, Malampuzha Project, Tharekkad, Palakkad Head Post Office Pin 678001
GENERAL KS ANNUAL ACTION PLAN 2022 23 MP LBC Urgent rectification works to the weak and vulnerable portion of the canal bund in bet ch.9.800km to 10.100km of Erimayur branch canal General Civil Work
2022_Irrig_516404_1
IRR/PI/TR/4208/2022_5_4_3/1
Open Tender
Civil Works - Canal
Item Rate
365 days
KODUVAYUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,030
₹11,648
Yes
6 Jan 2023
14 Oct 2022
26 Oct 2022
14 Oct 2022
21 Oct 2022
14 Oct 2022
14 Oct 2022 - 20 Oct 2022
Amount
Canal lining work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
BENNY KURIAKOSE
S.Sadasivan Nair
JAYADEVAN V
Bidder Name
S.Sadasivan Nair
C MUKUNDAN
BENNY KURIAKOSE
JAYADEVAN V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_740683.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .