Loading…
Loading…
Tender Value
₹9.0 L
EMD Value
₹17,910
Closing Date
28 Sept 2026, 11:00 amDue tomorrow
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Kuthera Bhel Bhagot in Tehsil Ghumarwin District Bilaspur (SH Operation of pumping machinery and distribution system of water supply scheme from sector storage tank to different habitation for one year).
2026_HPIPH_143681_4
BLP-BLP-0736-NIT No. 10482-581 Dated 17/09/2026
Open Tender
Civil Works
Item Rate
365 days
Sub Division Kandrour Section Kuthera
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹17,910
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Bhel Bhagot whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 108 | ₹108 |
| 2Description of main components of the scheme is as under:- | |||||
| 2.01 | Civil works: 2 Nos pump house.
Rising main: Booster stage : 1st phase: 100mmdia 210 Rmt, 1st phase: 100mm dia =3900 Rmt 2nd phase: 100mm dia=1710 Rmt.
Distribution system: 45000 Rmt. (20mm dia to 100mm dia)
Pumping machinery: Booster stage: 1st phase: submersible pump 2x5=10HP, 1st phase:2x40=80HP, 2nd phase: 2x40=80HP.
No of storage tanks: 2 Nos, 1No sub storage tank, Total working hours 35 per day : through , 5 Nos perons. (PO=2Nos, Helper/ Beldar=3Nos). indicators to be mentioned:Average per day 3 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No.
Quantity of water lifted per day: 525000 ).
Pumping hours per day ( 18 ) and energy consumptoin per day 255 Unit. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
TC.pdf
Tender Documents • 0.18 MB
BOQ_213540.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .