Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC Committee approved rates as L1 | |
| 2 | L2₹2.0 L+₹1,440 (0.73%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.0 L+₹3,890 (1.98%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
14 Jan 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EUDC BAREILLY
35-B RAMPUR GARDEN B AREILLY
For the different work under Full deposited Fund -2020-21 under EUDD-I, Bareilly .
2021_MVVNL_542846_1
T-78/EUDCB/2020-21
Open Tender
Electrical Works
Item Rate
120 days
EE EUDD-I BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹2,000
8 Apr 2021
4 Jan 2021
15 Jan 2021
4 Jan 2021
14 Jan 2021
4 Jan 2021
30 days
Amount
For the wok of Installation of 11 KV Pilfer metering Cubical of M/s Tata Tale Service ,Biharipur ,Civil Lines ,Bareilly under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly
Safe Carriage of 11 KV Pilfer metering cubical from Central C.B. Ganj to work site including loading & unloading and Mounting of 11 kv Pilfer metering Cubical 15/5
For the wok of replacement of Damage 11 KV Pilfer metering Cubical by new metering cubical of M/s Amar Ujala Ltd., Bareilly under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly.
Safe Carriage of 11 KV Pilfer metering cubical from Central C.B. Ganj to work site including loading & unloading and Mounting of 11 kv Pilfer metering Cubical 15/5 .
For the wok of replacement of Damage 11 KV Pilfer metering Cubical by new metering cubical of Income Tax Department ,Bareilly under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly.
Safe Carriage of 11 KV Pilfer metering cubical from Central C.B. Ganj to work site including loading & unloading and Mounting of 11 kv Pilfer metering Cubical 15/5 .
For the work of Sifting of PCC Pole near premises of Smt. Palvinder Kaur,GU/15/9/4 Guddar Bagh, Bareilly under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly.
Dismantling of 8.5 Mt. PCC Pole from existing place and shifted to new Place along with Carriage , grouting and concerting of Pole.
For the wok of Giving 75 KW (LMV-2) Connection to Shri Ajay Pal Singh S/o Vijay pal Singh , 35-A, Civil Lines , Rampur Garden, near Ganga Charan Hospital ,Bareilly under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- ST Pole 11 Mtr. Long – 02 nos. b ACSR Weasel Conductor -60 Mtr. c- 11 KV Pilfer Metering Cubical 15/5 -01 Nos. d- 11 KV XLPE Cable (3x70 sqmm)-60 Mtr.. e- I/D & O/D Cable Jointing kits -04 Nos. f- other Line materials- 500 Kgs.
Erection of D / Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Earthing of Poles .
Laying of. ACSR Weasel Conductor
Mounting of 11 kv Pilfer metering Cubical 15/5
Erection of Stay Set Complete
Laying of 11 KV XLPE Cable (3x70sqmm) 60 mtr.
Installation of I/D O/D cable jointing kits
Fixing of associated Items i.e Top Channel -01 No. , Dropper Channel-01 , 11 KV Pin Insulator – 06 No., Disc Fitting – 03, Disc Insulator -06 Etc
For the wok of Giving 02 KW (LMV-9) Connection to Executive Engineer, UPSEDCO ,Bareilly under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly.
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- ST Pole 11 Mtr. Long – 05 nos. b AB Cable(3x95 sqmm) -200 Mtr. c- 03 Phase Distribution Box- 01 e- other Line materials- 500 Kgs.
Erection of ST Pole including digging of pit & grouting work complete and fitting of all accessories complete
Erection of Stay Set Complete
Earthing of ST Pole
Laying of AB Cable (3x95sqmm) in all respect.
Installation of 03 Phase Distribution Box alongwith making all connections.
For the wok of reducing of Load from 6 KW to 10 KW of M/s Mahindra Skill with dismantling of old set up & installation of new one under Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly.
Dismantling of charging of CT/PT unit from D/pole
Dismantling of charging of main meter cubical only with cable
Carriage from site to test lab of Dismantled items
For the wok of construction of tube- well Line to giving 26 KVA (LMV-7) to Maha Prabandhak, Jal Kal ,Govt. Inter college ,Bareilly, for Full Deposited Fund -2020-21 under EUDD-I, Bareilly under EUDC, Bareilly
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- ST Pole 11 Mtr. Long – 02 nos. b 63 KVA T/F -01 no. c- ACSR Weasel Conductor – 90 mtr. e- other Line materials- 400 Kgs.
Erection of ST D/Pole including digging of pit & grouting work complete and fitting of all accessories complete
Earthing of Poles
Mounting of and installation of 63 KVA T/F on D/pole along with making all connections
Sagging and Stringing of 90 mtr.. Weasel Conductor .
JOSHI ELECTRICALS
PL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .