Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
1 Oct 2026, 3:30 pm
Engineer-In-Chief, PR, PMGSY, Vijayawada
Engineer-In-Chief, Panchayati Raj, (PMGSY), Z.P. Compound, M.G. Road, Vijayawada-520002
BT Road from Borubadhra to Udayapuram in Santhabommali Mandal of Srikakulam District Est cost Rs.200.00 Lakhs
2026_ENCPR_149578_1
204/2026-27 dt.11.09.2026 of the ENC, PR, PMGSY, Vijayawada
Open Tender
Civil Works - Roads
Percentage
120 days
Santhabommali
AS PER SBD
3 documents required · 3 mandatory
₹0
₹3.2 L
Superintending Engineer, PR Circle, Srikakulam
18 Sept 2026
18 Sept 2026
5 Oct 2026
18 Sept 2026
1 Oct 2026
18 Sept 2026
18 Sept 2026 - 1 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Portion | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete. | 14,770 | Sqm | 2.68 | ₹39,583.6 |
| 3 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead upto 1000 m as per Technical Specification Clause 305.4.3 MORTH including contractors profit & Over head charges, but excluding GST etc., complete. | 4,931.25 | Sqm | 10.91 | ₹53,799.94 |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete.., complete. | 1,000 | Cum | 246.59 | ₹2,46,590 |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 2,500 | Cum | 102.9 | ₹2,57,250 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 355.7 | Cum | 3,014.1 | ₹10,72,115.37 |
| 7 | Providing and applying prime coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat | 13,912.5 | Sqm | 68.79 | ₹9,57,040.88 |
| 8 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat | 13,912.5 | Sqm | 22.87 | ₹3,18,178.88 |
| 9 | Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500.15 of MORD using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 507 MORD'2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 13,912.5 | Sqm | 271.61 | ₹37,78,774.13 |
| 10 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum size of coarse agregate not exceeding 25mm and cement content in the mix to be 350 kg /cum (Ordinary portland cement ) with minimum water cement ratio of 0.45, mixed in a concrete mixer and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer bitumenous sealant, admixers as adopted, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including cost of materials, labour charges, conveyance, hire charges of machinaries etc complete as per direction of Engineer in charge for CC pavement inlcuding contractors profit & Over head charges, but excluding GST and seigniorage etc.complete for finished item of work for 170mm thcik 3.25m spacing | 647.07 | Cum | 7,163.09 | ₹46,35,020.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
SBD.pdf
Tender Documents • 0.52 MB
BOQ_235807.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .