Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹5.9 L+₹19,803 (3.47%)Rejected-AOC | 2 | Rejected-AOC 2 | |
| 3 | Rejected-Technical | - | Rejected-Technical 4 | |
| 4 | Rejected-Technical AE | - | Rejected-Technical 3 |
| Sl No | Description | Qty | Unit | SUNIL KUMAR R V L1 | B.VIJAYAN NADAR L2 | Ramesh S S L3 | AJITH S L4 |
|---|---|---|---|---|---|---|---|
| 1.00MAINTENANCE | |||||||
| 1.00 | 2.15:Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 6.34 | cum | 1,586.25 ₹10,050.48 Lowest | 1,642 ₹10,403.71 | 1,737.41 ₹11,008.23 | 1,763.54 ₹11,173.79 |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 74.46 | cum | 818.35 ₹60,937.61 Lowest | 846 ₹62,996.54 | 896.32 ₹66,743.57 | 909.81 ₹67,748.09 |
| 1.00 | OD167342/2026-2027:M10 -WITHOUT FORMWORK - Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical specifications - P.C.C grade M 10 -
Nominal mix 1:3:6 | 9.34 | cum | 7,520.47 ₹70,271.27 Lowest | 7,785 ₹72,743.04 | 8,237.12 ₹76,967.65 | 8,360.99 ₹78,125.09 |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 2.77 | cum | 8,590.74 ₹23,813.53 Lowest | 8,893 ₹24,651.4 | 9,409.38 ₹26,082.8 | 9,550.88 ₹26,475.04 |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.26 | tonne | 87,268.86 ₹22,951.71 Lowest | 90,348 ₹23,761.52 | 95,585.07 ₹25,138.87 | 97,022.44 ₹25,516.9 |
| 1.01 | 9.7:Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets | 114 | metre | 2,496.44 ₹2,84,594.16 Lowest | 2,583 ₹2,94,462 | 2,734.33 ₹3,11,713.62 | 2,775.46 ₹3,16,402.44 |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 9.86 | cum | 7,982.25 ₹78,673.06 Lowest | 8,260 ₹81,410.56 | 8,742.9 ₹86,170.02 | 8,874.38 ₹87,465.89 |
| 2.00grill | |||||||
| 2.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 120 | kg | 155.03 ₹18,603.6 Lowest | 160.5 ₹19,260 | 169.8 ₹20,376 | 172.36 ₹20,683.2 |
Tender Value
₹6.7 L
EMD Value
₹16,762
Closing Date
23 Sept 2026, 5:00 pmClosed
AE, PALLICHAL
AE, PALLICHAL o/o the Assistant Engineer,Pallichal GP
Pro no 55 Completion of Ammanoorkonam drainage Ward 6
2026_LSGD_869591_12
T1/AE/LSGD/PCL/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
PALLICHAL GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,480
Yes
₹16,762
Yes
12 Oct 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
16 Sept 2026 - 23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MAINTENANCE | |||||
| 1.001 | 2.15:Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 6.34 | cum | - | - |
| 1.002 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 74.46 | cum | - | - |
| 1.003 | OD167342/2026-2027:M10 -WITHOUT FORMWORK - Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical specifications - P.C.C grade M 10 -
Nominal mix 1:3:6 | 9.34 | cum | - | - |
| 1.004 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 2.77 | cum | - | - |
| 1.005 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.26 | tonne | - | - |
| 1.006 | 9.7:Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets | 114 | metre | - | - |
| 1.007 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 9.86 | cum | - | - |
| 2grill | |||||
| 2.001 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 120 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1474612.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
SBD.pdf
Tender Documents • 1.66 MB
FORM.pdf
Tender Documents • 0.24 MB
AFFIDAVIT.pdf
Tender Documents • 0.23 MB
INTEGRITYPACT.pdf
Tender Documents • 0.23 MB
PRELIMINARYAGREEMENT.pdf
Tender Documents • 0.25 MB
BOQ_1474612.xls
BOQ • 0.30 MB
NIT.pdf
Tender Documents • 0.26 MB
EPAY.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .