Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.2 L
EMD Value
₹15,000
Closing Date
10 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak, Morbi
Repairs to Road Near Washing Platform at Navlakhi Port.
369722
12/2026-27
Open
Civil Works - Others
Works
Morbi
11 documents required · 11 mandatory
₹1,062
Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak, Morbi - 363641
₹15,000
26 Nov 2026
26 Nov 2026
26 Nov 2026
10 Dec 2026
26 Nov 2026
120 days
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to providea common basis forbidding. The basis ofpaymentwill be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in sofar as it
is otherwise provided under the Contract, include allconstructionalplant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. TheratesandpricesshallbequotedentirelyinIndianCurrency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided the
cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification mentioned in this contract.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause29oftheInstructionstoBidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling
for its removal, and which cannot be extracted by ripping with a tractor of at least
kw with a single rear mounted heavy duty ripper.
Sign of Contractor Executive Engineer ( C )
BILLOF QUANTITIES
Name of work: Repairs to Road Near Washing Platform atNavlakhi Port..
(A) PercentageRateTender(UptoINR50Cr.)
Item DescriptionofItem(withbrief Quantity Unit RateIn Amount
No specification and reference figures
to book of specifications)
1 Demolition and Disposal of 208.00 Cum 898.30
unserviceable materials with all
lead and lift. ( ii ) Unreinforced
cement concrete.
2 Providing, laying, spreading and 130.00 Cum 1264.80
compacting graded stone
aggregate to wet mix macadam
specification including premixing
the material with water at OMCin
mechanical mixers, carriage of
mixed material by tipper to site,
laying in uniform layers by
mechanical means in subbase/
base course on well prepared
surface and compacting with
vibratory roller to achieve the
desired density complete as per
Clause no. 406 of MORT& H
3 Construction of dry lean cement 98.00 Cum 2413.70
concrete sub-base over a
prepared sub-grade with coarse
and fine aggregate conforming to
IS:383, the size of coarse
aggregate not exceeding 25 mm,
aggregate cement ratio not to
exceed 15:1, aggregate gradation
after blending to be as per Table
600-1 of MORT & H
specifications, cement content
not to be less than 150 kg/cum,
optimum moisture content to be
determined during trial length
construction, concrete strength
not to be less than 10 Mpa at
days, mixed in a batching plant,
transported to site, laid with a
paver, compacting with 8 to
tonne vibratory roller, finishing
and curing etc. complete as per
clouse no 601 of MORT & H
specifications.
4 Providing and Layig interlocking 648.00 Sqm 979.00
cement concrete paver blocks
Sign of Contractor Executive Engineer ( C )
120mm thick of M55 grade of
approved make and shape
including leveling the base with
50mm thick sand bedding, laying
the paver blocks in pattern as
directed by the EIC, filling the
joints with sand including
watering, rolling and compacting
with appropriate tools and plants,
all conveyance including loading,
unloading of blocks etc.complete
in all respect.
I/Weam/arewillingto carryouttheworkat… ....................... %above/belowpercent (Should
Bewritteninfiguresand words) of the estimated rate mentioned above.Amountofmy/our tender
works out as under.
Estimatedamountputtotender Estimatedamountputtotender
Deduct………%below Add………%Above
Inwords Inwords
1 The Contractor shall exhibit a board with detailed specification and details of work
asdirected by the Engineer-In-Charge for which no extra payment shall be made.
2 Thelabourcesswillbedeductedasper prevailing rulesi.e.1%oftheworkdone.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis StandardCement Consumption hasbeen taken asper
Govt.G.R.: PRC-10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R. therefore in R.C.C. items where thereis a change as per actual mix design the cost
ofdifferenceofcementconsumptionhavebeendeductedfromtherateoforiginalitem
Attherateofinputratementionedinallthetender.
Sign of Contractor Executive Engineer ( C )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid.pdf
Price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .