Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹12.4 L (4.89%)Rejected-Finance | ₹2.7 Cr+₹12.4 L (4.89%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
29 Jul 2024, 1:00 pmClosed
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
RESTORATION AND DEMARCATION OF PANDAH DISTRUBUTARY FROM KM. 0.000 TO KM. 23.500 IN DISTRICT BALLIA LOT 04
2024_UPIDC_938692_9
03/S.E./2024-25
Open Tender
Civil Works
Item Wise
270 days
Ballia
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹6.5 L
Superintending Engineer, Drainage Circle, Ballia
23 Oct 2024
23 Jul 2024
29 Jul 2024
23 Jul 2024
29 Jul 2024
23 Jul 2024
23 Jul 2024
Amount
Earth work for diversion and making jeepable service road including all cost of material T&P and labour etc.
Dismentling of old damged RCC work and its proper disposal including stacking of material within a distance of 60 m as per direction of engineer in charge.
Dismentling of old and damged BRICK work and its proper disposal including stacking of material within a distance of 60 m as per direction of engineer in charge.
Earth work in digging foundation in all type of soil with 30 m lead &1.5 m lift including refilling the trenches and proper disposal of excess earth as per direction of engineer in charge .
Laying C.C. 1:3:6(M10) in foundation with cement,coarse sand having F.M. not less than 2.0 and stone grit (20-40 mm) including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Deep struck cement pointing in 1:2 CM with cement and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Centering and shuttering for R.C.C/R.B work the rate including labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
Centering and shuttering for PCC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
Cutting bending & binding of steel in slab the rate including all cost of material ,T&P With Proper Completion of work .
Laying CC (1:1.5:3) M-20 with cement, coarse sand having FM not less than 2.0 and hard stone grit 10 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
C.C 1:6:12 with brick ballast bellow cc in bed including all cost of material ,T&P With Proper Completion of work.
Laying CC (1:2:4) M-15 with cement, coarse sand having FM not less than 2.0 and hard stone grit 10 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Removing of diversion with proper disposal including all cost of material ,T&P With Proper Completion of work.
Laying coarse sand filling for making base of concrete including cost of cost of all materials ,labour and T&P with all lead and lift for proper completion of work as directed by engineer in charge as per drawing and ID specification.
Laying stone grit fill in the 50 mm thick size (12.5-20 mm) for making base of concrete including cost of cost of all materials ,labour and T&P with all lead and lift for proper completion of work as directed by engineer in charge as per drawing and ID specification.
Supplying and laying LDPE film 200 micron thick first grade below CC lining including cost of all material, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. Specification.
12 mm thick plaster in 1:4 CM with coarse sand including cost of material, labour and T&P etc. required for porper completion of the work.
12 mm thick plaster in 1:3 CM with coarse sand having F.M. not less than 2.0 including cost of material, labour and T&P etc. required for porper completion of the work.
Supply and Fixing of P.V.C. Pipe 110 mm for outlet spout incliuding all labour and T&P etc required for proper completion of work.
Supply and Fixing of P.V.C. Pipe 160 mm for outlet spout incliuding all labour and T&P etc required for proper completion of work.
Fixing of RCC precast boundery piller including all cost of material, labour and T&P etc, required for proper complition of work as per direction of Engineer -in -charge.
Painting of parapet & boundary piller as per approved brand & manufacture such as Berger,Asian Paints etc. after thoroughly brushing the surface free from mortar dropping including all cost of material, labour and T&P etc required for proper complition of work as per direction of Engineer -in -charge.
Write letter including cast material, labour and T&P etc required for proper complition of work as per direction of Engineer -in -charge.
Repair of Regulator (fabrication of steel sheet , spendal rod,oiling greasing etc) &painting including all labour and materials.
Uprooting moonj and narkul grass with proper disposal including all cost of material ,T&P With Proper Completion of work.
Earth work in cutting for maintaining section with proper dressing and manual compaction including cost of material T&P and labour etc.
Earth work in filling for maintaining section with proper disposal dressing and manual compaction including all cost of material T&P and labour etc.
Launching apron with( 1st class) Brick rora including stacking of material within a distance of 60 m as per direction of engineer in charge cost of material ,labour and T&P etc.
Supplying and laying of joint Filler Board including cost ofall materials ,labour and T&P etc.complete.
Supplying and fixing of Head Regulator of chadi Minor of size-1.30 x 1.70 m including cost of all materials,labours and other accessories required for proper completion of work.
VINAY KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .