Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-AOC HOUSE NO 43 VPO KOT DISTRICT PANCHKULA 134118 | PANCHKULA | PANCHKULA | HARYANA | 134118 | ₹44.5 L | L1 | Accepted-AOC LOA |
| 2 | L2₹54.6 LRejected-Finance 708 PREM NAGAR KARNAL HARYANA 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹54.6 L | L2 | Rejected-Finance Highest |
| 3 | L3₹57.0 LRejected-Finance S O DALIP SINGH TEJA KHERA DABWALI 125101 | DABWALI | SIRSA | HARYANA | 125101 | ₹57.0 L | L3 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | Chopra Electric Company L2 | M/S GARG ELECTRICAL L1 | Dekhora Power & Contructions Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00 | [20.84]Providing and fixing of insulated rubber matting suitable for 11 KV installation 1 M x 2 M x 12 mm thick (IS code 15652-40091) as per specification complete and as per directions of Engineer-in-charge [Through Rate] | 10 | Each | 1,600 ₹16,000 | 1,300 ₹13,000 | 1,500 ₹15,000 |
| 2.00 | [20.86]Supply, erection, testing and commissioning of G.O. Switch two poles, with blade, pin 6 insulators operating handle with GI pipe 25 mm class B complete in all respects. [Through Rate] | 2 | Each | 23,500 ₹47,000 | 36,814 ₹73,628 | 13,500 ₹27,000 |
| 3.00 | [23.22.1.11]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.11. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 200 to 250 amp, 25 KA [Through Rate] | 3 | Each | 10,200 ₹30,600 | 10,800 ₹32,400 | 10,000 ₹30,000 |
| 4.00 | [23.22.1.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA [Through Rate] | 34 | Each | 3,400 ₹1.2 L | 4,635 ₹1.6 L | 3,500 ₹1.2 L |
| 5.00 | [23.22.1.4]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.4. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 125 to 160 Amp, 25 KA [Through Rate] | 2 | Each | 2,600 ₹5,200 | 5,249 ₹10,498 | 5,000 ₹10,000 |
| 6.00 | [23.22.2.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 2.1. MCCB Enclosure made of Sheet Steel suitable for mounting MCCB of following ratings MCCB up to 125 A FP [Through Rate] | 2 | Each | 2,250 ₹4,500 | 1,800 ₹3,600 | 1,300 ₹2,600 |
| 7.00 | [23.23.6.1]MISCELLANEOUS 6.1. Supply and erection of MS cable tray , duly pained as required including erection of the same on wall or ceiling with necessary fixture and other material required to complete the job in all respect up to the entire satisfaction of Engineer-in Charge of the work. MS perforated cable tray painted with powder coating 100 X 50 X 2 mm [Through Rate] | 30 | Metre | 220 ₹6,600 | 230 ₹6,900 | 250 ₹7,500 |
| 8.00 | [23.23.7.1]MISCELLANEOUS 7.1. Supply and erection of cable tray cover made of 1.25 mm thick GI sheet as required including erection of the same on existing cable tray with necessary fixture and other material required to complete the job in all respect up to the entire satisfaction of Engineer-in Charge of the work. GI cable tray Cover , suitable for cable tray of 100 X 50 X 2 mm [Through Rate] | 24 | Metre | 230 ₹5,520 | 203 ₹4,872 | 215 ₹5,160 |
| 9.00 | [23.24.4.1]MS STAND, BUS BAR CHAMBER AND PANELS 4.1. Supply, installation, testing and commissioning of load bank with digital meter module cost of digital Amp. / volt meter with selector switch wiring ( but EXLUDING COST of incoming and outgoing MCCBs ) etc.suitable for operation of 240/415 volts A.C. Supply with both side cable allay, inter connection and fixing the same in existing MS pedestal/wall complete with all labour and material required for the same up to the entire satisfaction of Engineer-in-Charge of work. Load Bank 4 way 250 amp. [Through Rate] | 1 | Each | 60,000 ₹60,000 | 43,000 ₹43,000 | 45,000 ₹45,000 |
| 10.00 | [23.24.4.2]MS STAND, BUS BAR CHAMBER AND PANELS 4.2. Supply, installation, testing and commissioning of load bank with digital meter module cost of digital Amp. / volt meter with selector switch wiring ( but EXLUDING COST of incoming and outgoing MCCBs ) etc.suitable for operation of 240/415 volts A.C. Supply with both side cable allay, inter connection and fixing the same in existing MS pedestal/wall complete with all labour and material required for the same up to the entire satisfaction of Engineer-in-Charge of work. Load Bank 8 way 250 amp. [Through Rate] | 2 | Each | 65,000 ₹1.3 L | 52,000 ₹1.0 L | 65,000 ₹1.3 L |
Tender Value
₹44.6 L
EMD Value
₹89,280
Closing Date
3 Feb 2026, 3:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Construction of Office Building of Haryana Right to Service Commission, Panchkula (Pdg 11KV Substation Only) (Recall)
2026_HRY_499140_1
2026758F79A3 D5D1 4930 93CC D689E6CC94DE663BAR
Open Tender
Civil Works
260 days
Ambala
Construction of Office Building of Haryana Right to Service Commission, Panchkula (Pdg 11KV Substation Only) (Recall)
2 documents required · 2 mandatory
₹5,000
₹89,280
Yes
18 May 2026
27 Jan 2026
3 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_577713.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid